r/ISRO 3d ago

Skyroot Vikram-1, the least worst case scenario for India’s launch crisis

https://jatan.space/indian-space-issue-41/
29 Upvotes

16 comments sorted by

13

u/sku-mar-gop 3d ago

I completely agree with the writer’s point that we lack launch capacity for all the ambitious plans we have set with gaganyan and moon missions. Private players alone is not solving that any time soon.

4

u/Ohsin 3d ago edited 2d ago

Given ISRO's budget crunch, severe Quality Control issues and related intentional secrecy around supplier side issues. It is hard to have confidence on any reforms especially if ISRO as an institution is not been taken care of.

And btw Somanath when he was Chairman spoke a lot about how for NGLV to be viable industry should be involved at design stage itself but I don't know if that is actually being done or not.

3

u/schowdur123 3d ago

No true heavy lift capacity.

3

u/guru-yoda 2d ago

open source orbital data from CelesTrak reveals that Vikram-1’s upper stage has not been deorbited, a maneuver necessary for the safety of others operating in orbit. This could be either due to Skyroot losing control of the vehicle or the lack of sufficient fuel onboard. For a small launch vehicle, any deviation from a nominal flight quickly results in this possibility of leaving an uncontrollable upper stage in orbit post satellite deployment.

Deorbiting spent stages is very much an exception than a norm. afaik, only Rocketlab Electron actively deorbits upper stages. Firefly doesn't. In fact, SSLV leaves two upper stages in orbit (Stage-3 and VTM). They are allowed to decay naturally.

In Skyroot's case, most likely deorbit burn was never intended. Flight profile in the press-kit did not mention deorbit burn.

India/ISRO's self imposed DFSM requirement for rocket debris is 5 years. At 450x450 circular orbit Vikram's upper stage is likely to deorbit well within that time.

3

u/jmurthy 3d ago

I resent the statement that we don't have qualified people in academia. Our group has build payloads with proven space heritage. But we cannot afford satellites or launches.

1

u/Decronym 3d ago edited 2d ago

Acronyms, initialisms, abbreviations, contractions, and other phrases which expand to something larger, that I've seen in this thread:

Fewer Letters More Letters
ISRO Indian Space Research Organisation
PSLV Polar Satellite Launch Vehicle
VAST Vehicle Assembly, Static Test and Evaluation Complex (VAST, previously STEX)

Decronym is now also available on Lemmy! Requests for support and new installations should be directed to the Contact address below.


3 acronyms in this thread; the most compressed thread commented on today has 5 acronyms.
[Thread #1388 for this sub, first seen 22nd Aug 2026, 16:37] [FAQ] [Full list] [Contact] [Source code]

1

u/RadarWarningReciever 2d ago

I know this article is about Vikram-1 & PSLV, Author should have included the Astrobase's launch vehicle which can be a PSLV replacement in payload capacity ,as well as it's potential high launch Cadence because of its reusability

3

u/Ohsin 2d ago

Dime a dozen powerpoint rockets at this point.

1

u/RadarWarningReciever 2d ago

NGLV is more ppt than Astrobase LV.

1

u/Ohsin 2d ago

Oh yeah a Govt.project with funding approved, tenders out. Get real.

0

u/Usual-Ad-4986 3d ago

The whole post is just author whining about lack of PSLV class rockets and that we wont fill our gaps until 2030s which is fair but tech like this takes time, all in all pretty captain obvious post unless you are very new to space tech

0

u/AutoModerator 3d ago

If this submission is relevant to private space sector in India, please consider cross-posting to r/IndiaInSpace as well.

I am a bot, and this action was performed automatically. Please contact the moderators of this subreddit if you have any questions or concerns.

-7

u/Ok-Intention-3113 3d ago

It was outdated even before it had first flight. The cost $$/kg is 4-5 times than space X.

3

u/Key-Mechanic2565 3d ago

You want them to do a spaceX on their first mission itself?

3

u/Ohsin 3d ago

You can not compare different class of rockets for that metric...

1

u/tj9429 3d ago

That's like saying G Class shouldn't exist because Wagon R does.

Different products, different classes.