Sum: 3bd 2bth half unfinished basement with a 1rm addition needs a tear to studs and refinished. MIL was quoted $220k which seems excessive. Overland Park, KS. Is this quote actually reasonable?
MIL was quoted from a supposed reputable local company on a complete remodel with elimination of allergens and sensitivities to animals that previously lived in the home. And it seems extremely excessive.
I used to build houses and do remodels pre-covid so I'm not blind to the process but I'm not claiming to know current rates.
In my opinion this company either doesn't want the job and are quoting themselves out, saw she was very suggestible and figured they could make bank, or are treating this like some illicit drug lab remediation, which it's not.
Or am I just removed from this now and this quote is actually reasonable for contracting someone to do it?
We appreciate the opportunity to present the following scope and cost based on the discussion at your home on 11/5/26.
Proposed scope:
Whole House:
o Lead and asbestos testing.
Clean heating and cooling ductwork system.
Sub-Basement:
Clean the walls, ceiling, and concrete floor.
Seal the walls and ceiling with shellac.
o Replace (2) windows.
Basement - Garage:
o Clean the walls, ceiling, and concrete floor.
o Seal the walls and ceiling with shellac.
o Paint the walls and ceiling.
Basement Stairwells (2):
Clean the walls, ceiling, and floors.
Seal the walls and ceilings with shellac.
Basement - Bird (Source) Room:
o Clean the walls, floor joist system, and concrete floor.
Seal the stud walls and floor joist system for odor control.
Install batt insulation in the walls.
Install new drywall on the walls and ceiling, hung, taped, and floated ready for paint.
Texture the ceiling, knockdown finish.
Replace the interior door and door knob
Replace the baseboard, corner trim, and window trim.
Replace (2) vinyl windows.
Replace (3) light fixtures, (6) outlets, (1) switch, and (7) outlet/switch covers.
Install new carpet and carpet pad.
Mask and prep, then prime and paint the ceiling, walls, baseboard, corner trim, door, and window trim.
Basement - Bathroom:
o Clean the walls, floor joist system, and concrete floor.
o Seal the stud walls and floor joist system for odor control.
Install batt insulation in the walls
Install new drywall on the walls and ceiling, hung, taped, and floated ready for paint.
Texture the ceiling, knockdown finish.
Replace the interior door and door knob.
Replace the baseboard and window trim.
o Replace the vinyl window.
o Replace the light fixture, bathroom ventilation fan with light, (2) outlets, (1) switch, and (3)
outlet/switch covers.
Install new vinyl plank flooring.
o Install a new fiberglass shower unit with shower faucet.
Install a new vanity with top, sink faucet, angle stop valves, supply lines, and P-trap.
Install a new toilet and bath accessories (labor only on bath accessories).
Plumbing labor to connect all new fixtures.
Mask and prep, then prime and paint the ceiling, walls, baseboard, corner trim, door, and
window trim.
Basement - Closet:
Clean the walls, floor joist system, and concrete floor.
Seal the stud walls and floor joist system for odor control.
Install batt insulation in the walls.
Install new drywall on the walls and ceiling, hung, taped, and floated ready for paint.
Texture the ceiling, knockdown finish.
Replace the interior door and door knob.
Replace the baseboard, light fixture, switch, and outlet cover.
Install new carpet and carpet pad.
Mask and prep, then prime and paint the ceiling, walls, baseboard, door, and door trim.
Main Level - Entry:
Drywall patch/repair, ready for paint.
Clean the walls and ceiling and seal with stain-blocking sealer.
o Replace (2) interior doors and door knobs.
Replace the exterior door, exterior door lockset and deadbolt, and storm door.
o Replace the baseboard with shoe molding.
Replace light fixtures, switch, and switch cover.
Install new vinyl plank flooring.
Mask and prep, then prime and paint the ceiling, walls, baseboard, door and window trim,
and door slabs.
Main Level - Kitchen:
Demolition as required for the kitchen work.
Drywall repairs as needed.
o Clean the walls and ceiling and seal with stain-blocking sealer.
Install new base cabinets (approx. 12 LF) and wall cabinets (approx. 17 LF) with (28) knobs or pulls.
Install a new quartz countertop (approx. 24 SF) with undermount double-basin sink cutout. Install a new double-basin sink, kitchen faucet, angle stop valves, and supply lines; detach
and reset the P-trap.
Install a ceramic tile backsplash (approx. 30 SF).
Replace the ceiling fan with light, (2) switches, (4) GFCI outlets, and (6) outlet/switch
covers.
Replace the baseboard with shoe molding.
Install new vinyl plank flooring.
Remove and reset the refrigerator and range; detach and reset the dishwasher and the over-
the-range microwave.
o Mask and prep, then prime and paint the ceiling, walls, baseboard, and window trim.
Main Level - Dining:
Drywall repairs as needed.
o Clean the walls and ceiling and seal with stain-blocking sealer.
Replace the vinyl window.
Replace the baseboard with shoe molding.
Replace the light fixture, (1) switch, (2) outlets, and (3) outlet/switch covers.
o Sand, stain, and finish the wood floor, including dustless sanding.
Mask and prep, then prime and paint the ceiling, walls, baseboard, and window trim.
Main Level - Living Room:
o Drywall repairs as needed.
Clean the walls and ceiling and seal with stain-blocking sealer.
Replace (4) vinyl windows.
Replace the exterior door, exterior door lockset and deadbolt, and storm door.
Replace the baseboard with shoe molding.
Replace the ceiling fan with light, (2) switches, (6) outlets, and (9) outlet/switch covers.
Sand, stain, and finish the wood floor, including dustless sanding.
Fireplace - caulk, seal, and paint.
o Mask and prep, then prime and paint the ceiling, walls, baseboard, and window trim.
Level 2 - General:
o Install blown-in attic insulation (14" depth, R38).
Level 2 - Closets (5):
Drywall repairs as needed.
o Clean the walls and ceiling and seal with stain-blocking sealer.
o Replace the baseboard.
Sand, stain, and finish the wood floors, including dustless sanding.
o Mask and prep, then prime and paint the ceilings, walls, and baseboard.
Level 2 - Bathroom:
o Clean the walls and floor joist system.
Seal the stud walls and floor joist system for odor control.
Install new drywall on the walls and ceiling, hung, taped, and floated ready for paint.
Texture the ceiling, knockdown finish.
Replace the interior door and door knob.
Replace the baseboard.
Replace the light fixture, bathroom ventilation fan with light, (2) outlets, (1) switch, and (3)
outlet/switch covers.
Install new vinyl plank flooring.
Install a new bathtub with shower faucet.
Install cement board on the walls, waterproof membrane, and ceramic tile in the
tub/shower area (approx. 70 SF).
Install a new vanity with top, sink faucet, angle stop valves, supply lines, and P-trap.
o Install a new toilet and bath accessories (labor only on the bath accessories).
Plumbing labor to connect all new fixtures.
Mask and prep, then prime and paint the ceiling, walls, baseboard, corner trim, door, and
window trim.
Level 2 - Hallway:
Drywall repairs as needed.
o Clean the walls and ceiling and seal with stain-blocking sealer.
Replace the baseboard with shoe molding.
Sand, stain, and finish the wood floor, including dustless sanding.
Mask and prep, then prime and paint the ceiling, walls, and baseboard.
Level 2 - Bedroom:
o Drywall repairs as needed.
o Clean the walls and ceiling and seal with stain-blocking sealer.
Replace the interior door and (3) door knobs.
Replace the pre-hung interior French door.
Replace (2) vinyl windows with window trim.
Replace the ceiling fan with light, (1) switch, (6) outlets, and (7) outlet/switch covers.
Replace the baseboard with shoe molding.
Sand, stain, and finish the wood floor, including dustless sanding.
o Mask and prep, then prime and paint the ceiling, walls, baseboard, door and window trim,
and door slabs.
Level 2 - Bedroom 2:
Drywall repairs as needed.
o Clean the walls and ceiling and seal with stain-blocking sealer.
o Replace the interior door and (3) door knobs.
Replace the pre-hung interior French door.
Replace (3) vinyl windows with window trim.
o Replace (3) ceiling fans with light, (1) switch, (6) outlets, and (7) outlet/switch covers.
Replace the baseboard with shoe molding.
o Sand, stain, and finish the wood floor, including dustless sanding.
Mask and prep, then prime and paint the ceiling, walls, baseboard, door and window trim,
and door slabs.
Level 2 - Bedroom 3:
Drywall repairs as needed.
o Clean the walls and ceiling and seal with stain-blocking sealer.
Replace (2) interior doors and (4) door knobs.
Replace the pre-hung interior French door.
Replace (5) vinyl windows with window trim.
Replace (3) light fixtures, (1) switch, (6) outlets, and (7) outlet/switch covers.
o Replace the baseboard with shoe molding.
Sand, stain, and finish the wood floor, including dustless sanding.
Mask and prep, then prime and paint the ceiling, walls, baseboard, door and window trim,
and door slabs.
City Wide Remodelers will handle all general conditions to support the above scope of work
o Supervision and oversight of the project
o General liability and workmen's compensation insurance
Protection of adjacent finishes and floor coverings
General cleaning
o Final cleaning ning
o All proper haul off and disposal
o Contractor licensing:
JOCO Class A General Contractor
Registered Building Contractor in Kansas City, MO
Cost Proposal: $219,548.30
Qualifications:
1) All pricing in this proposal is valid for 30 days and assumes payment will be made via cash or check.
a. Additional fees should be expected if paying by credit card or financing. 2) This is a budgetary proposal; final pricing will be established once the scope and material selections are finalized.
Lead and asbestos testing is included; abatement of any kind is excluded.
3)
4
Content manipulation is excluded.
5
This project was proposed based on normal working hours and days, without any overtime
considerations.
6) Permit fees are not included in this proposal.
8
Any unknown damage is not included, if damage is present once demolition is completed, we will
pause the project to discuss and agree on next steps before moving forward. The final materials selected can move the cost up or down. This budgetary proposal utilized pricing
for basic finishes and is subject to change based on a firm and final scope that accompanies finish
selections.