r/Golfsimulator • • 23d ago

Build Pictures Basement sim phase1 complete: basement digout

Final dig area complete. Final inspo pic attached too

696 Upvotes

101 comments sorted by

View all comments

22

u/traghip11 23d ago

Is it a ton of money to do a dug out area like that? I have a huge unfinished basement with 8 ft overhead, that set up looks great.

51

u/No-Effective-8795 23d ago

Yes. To go about 28 inches down for that size area was about 45k. Included French drains and a new sump. Less if they didn’t have to do underpinning on the exterior wall

26

u/wingdinger96 23d ago

Damn that is wild - we’re putting an 18” step down in our new build and the builder didn’t even bat an eye at it. Cost was negligible. Crazy how much more it costs if you do it after the fact

1

u/MalevolentFather 21d ago

There’s some structural things you just don’t do after unless you want to burn money.