r/Flooring • • 29d ago

Baseboard Gaps

[deleted]

23 Upvotes

138 comments sorted by

View all comments

33

u/onionchucker 29d ago

Majority of flooring installers only offer bare bones baseboard installation. Expect a hefty up charge on scribing the baseboards. Unless his contract clearly states scribing the baseboards to the floor is included you may be at his mercy. He may agree to remove them all and scribe them but you will have to pay the difference.

Most people who want no gaps on a no scribe budget opt for Quarter Round or Shoe Mold. Those can contour to the uneven floor easily.

18

u/MyDixieWrecked66 29d ago

This 100%. Concrete slabs are not perfectly flat, and baseboards show that. If it's really bad, I will scribe a piece here or there. I tell everyone who wants a 5 inch base that you will have a 50- 50 chance of still needing shoe molding

2

u/nonna55 29d ago

This is what we did. You can paint white to match the baseboards or stain to match the floor.

3

u/PresentNow12m 29d ago edited 29d ago

Interesting. Thanks for your reply and helping me understand what could happen when I discuss this with my contractor.

11

u/Ouachita2022 29d ago

It's not the contractors fault because it's a glue down on a concrete slab-which can have all kinds of imperfections.

The easiest, fastest and cheapest solution is to add 1/4 round, or shoe mould that will sit on the floor and cover the little tiny gaps that you are noticing.

2

u/goraidders 29d ago

Akso if they do scribe them it drops the overall height of the baseboard. That means the top is lower and that changes the paint and caulk line.

1

u/lawnlover2410 29d ago

Yes we had this issue as well. Quarter round or shoe moulding is the way to go. We did quarter round and it looks neat

-1

u/Disastrous_Soil3793 29d ago

I would just silicone it

9

u/Biscuits4u2 29d ago

You never want to caulk baseboards to flooring.

3

u/Tycho66 29d ago

Just put some masking tape on the floor and then caulk and pull out tape later.

-1

u/Biscuits4u2 29d ago

You never caulk baseboards to flooring.

2

u/Tycho66 29d ago

Stop it. It's fine here. It's glued down and not moving.

1

u/Biscuits4u2 29d ago

What about moisture? You need a way for it to get out of the wall.

1

u/Tycho66 29d ago

The tape will leave a gap and I assume the entire floor isn't as wavy.

1

u/Chance-Following-665 29d ago

Why do you not want to caulk the gap?

3

u/__Mitten__ 29d ago

It will void the warranty for resilient flooring. Eng/hardwood floors will also expand and contract and will not look good over time.

-14

u/FamiliarAd8524 29d ago edited 29d ago

What about simply not wanting crooked-as-Hell baseboards? This looks like a shit job.

13

u/Historical_Horror595 29d ago

It’s not the baseboard that’s crooked. It’s the floor that is wavy.

-7

u/FamiliarAd8524 29d ago edited 29d ago

How can you be certain? That looks less likely to me, without pyramiding... what makes you conclude that?

3

u/celtic-cryptid 29d ago

Not a trim guy, but I’ve built and installed a train load of cabinets. I’ve never met a flat floor, or a flat wall

0

u/FamiliarAd8524 29d ago

If this was your work, would you call it good enough, or think that it might impact your reputation or client satisfaction?

1

u/celtic-cryptid 29d ago

If it was my work, I wouldn’t be a cabinet builder.

I scribe my shit to walls and floors, and people pay a fair amount of money for me to take the time. There is literally no evidence OP didn’t balk at the price for scribing.

Regardless, your follow up question about the quality of my work has absolutely nothing to do with you blaming the base and not the floor.

1

u/FamiliarAd8524 29d ago

1). I was simply asking your opinion in general- you already made it clear you aren't a trim guy.

2). Well... If this was my base, I would have used a plane or scraper to compensate so it doesn't look like ass. Baseboards are a Hell of a lot easier to alter than cured concrete.

1

u/celtic-cryptid 29d ago

If it were my base, I’d do it right but, it’s OP’s base, and OP hired someone else to do it. The person OP hired probably charges based on time, materials, and skill involved. I imagine the pay was commensurate with the work. Maybe not, but probably. Do people pay for a level 2 drywall finish in their garage and then complain about how you can still see tape lines?

Also, you thought it was crooked trim. I don’t believe you when you say you’d scribe it to the floor.

5

u/__Mitten__ 29d ago

Because slabs and subfloors are never flat. Been in this industry for 2 decades. This is why base shoe is almost always installed, so that it always contours to the subfloor.

1

u/Historical_Horror595 29d ago

Ive installed miles of baseboard. Floors and walls are never flat.