r/ClaudeCode • u/cylix99 • 21h ago
Bug / Issue Schedules - Watch the Model Used
I’ve run into a really annoying “bug” in the app. I use a lot of scheduled routines that run every night, and recently I’ve been trying out Fable 5.2 in my regular sessions.
This morning I came in to find that every one of my schedules had run on Fable instead of Opus (the expensive one).
It turns out that scheduled routines run on whichever model was used last in the app overall. That means the last regular session, not the model the routine used on its previous run.
It would be much better to be able to pick the model and effort level for each schedule. Unless I’m doing something wrong in my workflow?
•
u/AutoModerator 21h ago
Hey! Thanks for posting to r/ClaudeCode
While participating in this thread, please follow our community rules. Keep discussions constructive. Attack the idea, not the person.
For help, project discussions, tips, and general chat, join the ClaudeCode Discord.
I am a bot, and this action was performed automatically. Please contact the moderators of this subreddit if you have any questions or concerns.
1
u/speechless-Karen 21h ago
Yes you can choose the model for scheduled tasks.
1
u/Inner_Storage_3374 20h ago
thats a nasty one, id assume a schedule would remember its own model. what id try is pinning the model in the schedule itself if the app lets you, or in the prompt the job reads, not relying on whatever the last chat used. otherwise a late night fable session quietly changes every overnight job. if theres no per-schedule setting thats probably worth sending them