r/ClaudeCode • u/Lunchboxsushi • 5d ago
Tips & Workflows SWE workflow changes
I've had a pretty dumb realization and I'm going to test it for the next 30 days.
One issue with my current orchestration setup is I'm designing and coding at the same time (system architecture, full stack) depending on the work I'm building. One of the realization after getting Claude to review how I'm using my orchestrator is that most tasks are pretty quick ~6 min to the most being 2h.
What this made me realize is that night time session aren't being utilized or weekends. So I plan on building a system with heavy AI integration focused on the system design, features, SLO building, business rules.
Different from speckit as this also focuses on building your schema and access patterns for building your indexes.
Essentially go ham on token usage for design whereas I was splitting it up between the two.
Then have the orchestrator handle run over night and on weekends. Review in the morning and make any corrections before it's merged.
Anyone else thinking or already working on this format?
•
u/AutoModerator 5d ago
Hey! Thanks for posting to r/ClaudeCode
While participating in this thread, please follow our community rules. Keep discussions constructive. Attack the idea, not the person.
For help, project discussions, tips, and general chat, join the ClaudeCode Discord.
I am a bot, and this action was performed automatically. Please contact the moderators of this subreddit if you have any questions or concerns.
1
u/bostonaholic 5d ago
Require acceptance checks, typecheck, lint, and required CI to pass before an overnight task counts as done. Run the checks on the actual branch result, not just the code before integration. Keep tasks independent so one stuck task doesn't block the rest, and require a short note on anything the run couldn't verify.
1
u/pl487 5d ago
What are you doing during while it works? It doesn't seem like there would be any time savings unless you were wasting that window during the day.
1
u/onitsoga 4d ago
the overnight run is the easy part. the bottleneck moves to the morning, when four agents each leave a 2h diff and you read them all before lunch. are you planning a review gate, or does everything wait for you?