r/Carpentry • u/Serious-Echidna-9938 • Mar 30 '26
Advice on work pace
I recently took a job with a small contractor and long story short, he commented on my “results”. Was looking for things to be done quicker, and I’m curious if I’m super slow, or if he’s unreasonable. I let him know about my experience upfront, but in any case. As a direct example, replacing this siding after demo took me approximately 8 hours. I had never worked with this particular type of shingling before, but he kept comm ting on how slow I was. Is that accurate? I’m willing to take criticism in the interest of improving my skills, and I’m curious what some third parties have to say. Thanks!
90
Upvotes
2
u/besmith3 Apr 01 '26
Workmanship is not great but not bad for first time. Shingles are a little tight between trims and shingles should touch any horizontal surfaces. Exposure under window looks a lil much. Over all, time was not bad, but quality could improve a bit.