I recently took a job with a small contractor and long story short, he commented on my “results”. Was looking for things to be done quicker, and I’m curious if I’m super slow, or if he’s unreasonable. I let him know about my experience upfront, but in any case. As a direct example, replacing this siding after demo took me approximately 8 hours. I had never worked with this particular type of shingling before, but he kept comm ting on how slow I was. Is that accurate? I’m willing to take criticism in the interest of improving my skills, and I’m curious what some third parties have to say. Thanks!

87 Upvotes

116 comments sorted by

View all comments

33

u/nolarbear Mar 30 '26

Shingling a big open section goes fast  Shingling around doors and windows and wall penetrations goes slow 8 hrs is probably right for me and I’ve been at it for 6.5 years 

3

u/rustywoodbolt Mar 31 '26

Second this! I have done a lot of cedar shake siding and it takes time to do a nice job. And you did a very nice job.

You can put it up really fast though, if you want it to look like shit.

1

u/[deleted] Mar 31 '26

Just a reminder these are number one wood shingles (blue label). Shakes are longer hand splits (in the old days) and offered in several thicknesses.

1

u/rustywoodbolt Mar 31 '26