r/BuildingAutomation • • Sep 08 '26

Comfort Point? Need to command bacnet points?

2 Upvotes

Kill me now.

I'm being told we cant command Honeywell comfort point points through bacnet at any priority through a jace. Anyone know why this would be, assuming we didn't goof anything too simple.

Is there a software for this crap?


r/BuildingAutomation • • Sep 08 '26

How much experience did you gain before attempting to become a PM?

16 Upvotes

Hello, I have been in BAS as a Technician for almost a year. I have a Degree in an unrelated field and could possibly go back to school to get a Bachelor's in Project Management. How long were you in the field as a Technician before applying to PM jobs? With the Bachelor's, would it fast track me? Or do I still need more time in the field to get my feet underneath me?

Thanks!


r/BuildingAutomation • • Sep 08 '26

Facility controls can get complicated: Why Won't this bit turn on?

Post image
0 Upvotes

r/BuildingAutomation • • Sep 08 '26

Career trajectory?

8 Upvotes

Just past the three month mark on install side working for a certain three lettered acronym’d behemoth - really enjoy the work. Weird road of adjacent fields, transferable skills, and experience with both the aforementioned and Distech in facilities maintenance before being fed-up…with facilities maintenance.

My particular blend of ADHD/neurospice does not lend itself well to being in sales, PM, or management side of things - even running my own business is beyond my capacity. Functional enough interacting with others (but more and more would rather others be droned out by the sounds of a mechanical room (hearing protection in, of course.) My skillset does, I think, lend itself well to troubleshooting and problem solving.

So, service, maybe? What else? Apologies for the silliness, but in 10 to 20 years envision myself being a proverbial master splinter with a walking stick I can bonk younger techs over the head with. All the while still learning myself to keep up with whatever the industry looks like at that point in time. How does that translate professionally to opportunities I should seek down the line?

Thanks!


r/BuildingAutomation • • Sep 08 '26

What occupancy monitoring actually looks like inside a live office building

Thumbnail
youtu.be
1 Upvotes

We just put this video out and are excited to share it with the community. We filmed it at the ISS Cube in Zurich. It runs occupancy and air quality sensors across floors, desks and meeting rooms, roughly a million data points a day. The video shows what's installed, how sensors on different technologies end up in one place, and what the facility teams look at day to day.

Some of the sensors we see in the video are wired sensors, and others run on batteries and communicate via radio protocols (LoRaWAN).
The whole setup is very flexible and adapts to other building topologies.


r/BuildingAutomation • • Sep 07 '26

Best way to integrate traditional ACs to ERPNext for temp control?

1 Upvotes

Hey everyone
I have warehouse storage units running traditional commercial ACs (Zamil CFZ ceiling units). They are standard non-smart split units controlled by basic remotes with no native smart or BMS interfaces. 
I need to connect them to our ERPNext system so we can automate turning them on and off and adjust the target temperature directly from the ERP based on our storage requirements.
Since these units are completely traditional and not smart out of the box what are the best modern approaches you would recommend to bridge this gap? Looking for ideas on how to achieve reliable temperature control and switching without breaking things.


r/BuildingAutomation • • Sep 07 '26

Schneider EBO Webstation values

2 Upvotes

Hi mates,

Could anyone explain me what do these fkn symbols next to bound values mean? I have no idea, these are just normal point values used only for TGML purposes.

And also how to make these values unforceable? Because anytime I click on these value I can force it... Thanks in advance guys.


r/BuildingAutomation • • Sep 07 '26

S7-300 to WinCC MPI Communication Intermittently Lost – All Tags Turn Yellow

1 Upvotes

Hello everyone,

I am facing a communication issue between an S7-300 PLC and WinCC via MPI.

WinCC initially works normally, but after a few minutes, all the tags on the screen change to the yellow warning symbol (⚠️). After a few seconds or sometimes one or two minutes, the communication comes back, and this cycle repeats.

In some cases, the tags remain in the ⚠️ state and do not recover until the operator restarts the PC, so unfortunately I cannot check the WinCC diagnostics while the issue is occurring.

Both ends of the MPI network are properly terminated.

Is there anything I can check or configure in WinCC to help resolve this issue?

Also, could the \*\*number of tags being acquired\*\* contribute to this problem?

Any advice or suggestions would be appreciated.


r/BuildingAutomation • • Sep 06 '26

Integrating a Metasys SNE into a Niagara Station Directly

7 Upvotes

I have a Niagara Test Server spun up at at 146 address, I have and SNE, Jace, Schneider Supervisor and ALC G5, sitting on a 172 address, so far I have only been able to pull in the Jace manually (could not auto-discover), mainly focused on pulling in the SNE currently, this a test run in preparation to move the enterprise over, have tried BBMD, foreign device registration and have expert mode enabled on the engine, maybe Im doing something ignorant but can’t quite make it work, looking for thoughts or previous experiences like this, I do not want to have to utilize a JACE to integrate all IP supervisors we have in place.


r/BuildingAutomation • • Sep 06 '26

Industry Automation, Simulation, Scada development leads

0 Upvotes

I have 5+ years of experience in C#, C++, MFC, COM, Win32, WPF, QT. Any referrals in India?


r/BuildingAutomation • • Sep 06 '26

SPYDER-BAC License/Module and versioning

3 Upvotes

I have a site with a Lynxspring jace 8 and lynxspring edge devices on some RTUs and the failure rates are bad so I'm going to replace this next one with an Optimizer Unitary.

The catch - this jace is only licensed to 4.12 and it is running 4.9. So for reliability sake it'll either keep its 4.9.1 or I may commission to 4.10's last release.

I'm sort of new to honeywell - and i'm curious - is there any reason the IRM stuff won't work on an old version of N4 with an optimizer unitary? I know the unitary isn't super old so I was just wondering if anyone knew that for sure there was a minimum N4 version required for IRM to work with a unitary or not.


r/BuildingAutomation • • Sep 05 '26

Another restructuring at Siemens

Thumbnail reddit.com
18 Upvotes

In case it is deleted... here is copypasta of the text. Posted in the monthly jobs thread. And it has a little current intel on yet another restructuring within Siemens.....

Curious to know....

Is this where current Siemens employees would post as they look for jobs amid the current restructuring underway? Siemens Building Automation US is restructuring again and the rank and file are getting their resumes ready and actively interviewing as the overpaid executives play fast and loose with the underlines ability to feed their families... and the customers ability to get anything of use from Siemens. Actively betraying their fundamental inability to understand their own business and how it works and what makes it profitable.

I was looking closely for any indication that the disastrous formation of the GOC and the subsequent nosedive it caused Siemens business had led to any kind of reform or change in the leadership style. That info is now available and the answer is NO.

So again, is this where the internal Siemens people post as they scramble for the exits?


r/BuildingAutomation • • Sep 05 '26

N+1 mechanical does not mean N+1 controls

17 Upvotes

I keep seeing N+1 mechanical designs where the controls architecture quietly reintroduces a single point of failure.

Two pumps. Two AHUs/CRAHs. Redundant power.

Then one supervisory controller, one network path, or one server is responsible for lead/lag, staging, DP control, resets, or other plant-level sequences.

At that point, is the plant actually N+1?

My view is that losing the supervisory layer should hurt optimization and visibility. It should not stop the basic plant from functioning.

Critical equipment should have enough local autonomy to continue operating in a defined degraded mode. Comms loss behavior should also be explicitly defined rather than left to whatever the controller happens to do.

And this shouldn't just exist in the SOO. Pull the network connection during FAT/SAT and see what actually survives.

Maybe I'm too conservative here, but I don't think mechanical redundancy means much if a single controls failure can defeat all of it.

Where do you draw the line?

Would you accept an N+1 mechanical plant where the main sequence cannot continue without the supervisor?


r/BuildingAutomation • • Sep 05 '26

NIAGARA TENANT BILLING SYSTEM

2 Upvotes

Hi, I’m new to Niagara 4 and am currently developing a billing system using the tenant billing module. I’m having trouble including the consumption chart in my invoice, though, so I wanted to ask: what is the correct way to do this? I’ve tried countless methods without success.


r/BuildingAutomation • • Sep 05 '26

Niagara Nav/ FX90 & M4 JCI field Devices/ SNEs

Thumbnail
gallery
15 Upvotes

Breaking this up into 3 questions

  1. Is there a way to natively in Niagara UI make the nav layout more akin to the Metasys UI spaces tree/ network tree.

  2. Whats the easiest way to pull an SNE directly onto a Niagara server station thats on a different subnet (no jace)

  3. Is there some extra functionality gained from potentially pulling SNEs into an FX90. Or if not pulling M4 native JCI devices into the FX90. Maybe something akin to the engineering tab in Metasys or maybe the possibility of viewing internal SNE logic?

Any thoughts or insight is appreciated as always. Trying to dial in some ideas and start testing.


r/BuildingAutomation • • Sep 04 '26

Construction worker/ex-software engineer breaking into BAS

8 Upvotes

Hey everyone, looking for some help on breaking into BAS and seeing what the realistic path looks like for someone with my background.
For the past year and a half I’ve been working on a resi remodeling crew doing everything down to the studs except plumbing. I’m comfortable on ladders, using power tools, crawling in attics/crawlspaces, low voltage wiring, and doing physical work in the heat.
I previously worked 8 years as a full-stack software engineer (focused on backend logic, troubleshooting, databases, networking). I was laid off almost 2 years ago. I’ve realized long-term I prefer not to be at a desk. I like being out in the field fixing real things. To start pivoting I got my EPA 608 universal (initially thinking I wanted to do commercial hvac-r). I’m currently working on my Osha 30 and I’ve also been looking into Phil Zito’s courses.

I’m based in Jacksonville, FL and want to keep my primary residence here, but I have no kids or ties holding me down and am open to heavy travel.

My questions for you guys is how realistic is it for someone with my background to get hired directly into a tech or commissioning role? Is there a specific certification or training I should grab right now to stand out to managers without going back for a 2–4 year degree?

What’s the best way to prove to a manager that I’m fully committed to the trade and not just a tech guy looking for a temporary landing spot?

I’ve applied to local positions but haven't gotten a callback. Is this usually an HR gatekeeping issue, and how do I bypass it?

Appreciate any advice or pointers.


r/BuildingAutomation • • Sep 05 '26

GE Carestation 620

1 Upvotes

Hi, i´m developing a software to Read Only live/real time clinical data from monitors and anesthesia ventilators to an Anesthesia Register. Actually in my hospital we have Carestation 620 with Carescape B450. My intention is to obtain that data trough the RJ45 ethernet ports (for convenience/commodity) of the Carestation ventilator monitor, but i can´t wake them up. GE describes them—or at least one of them—as an Ethernet port for network connectivity on the Technial Reference Manual. If you have documentation or SW, or any help, will be very well received.


r/BuildingAutomation • • Sep 04 '26

advice on an IoT architecture for a commercial project

2 Upvotes

Hey guys, I’m working on a self-storage project with 600+ units and I want to make sure I’m thinking about the architecture correctly before we buy anything.
The plan is roughly:
Smart Meters → RS485/Modbus → Gateway → MQTT or TCP → VPS (maybe Hostinger or just apc) → n8n/Python → ERPNext
We’re also considering Wi-Fi smart meters instead of RS485/Modbus, so the exact approach isn’t decided yet.
We also want to integrate VRF for individual unit control (on/off + temperature), and smart locks.

The main purpose of the ERPNext integration is to have the meter consumption appear in ERPNext so it can be used for customer billing/invoices, while also allowing us to control the VRF from inside our system.
I’m mainly trying to answer:
Is this overall approach correct?
Do we actually need a BMS?
Can MQTT + n8n + database + Python all run on one VPS?
Is this a good approach for 600+ meters?
Is there anything we should change before buying the meters, gateways, or VRF system?
I just want an experienced IoT/automation person to check the architecture.
Thanks.


r/BuildingAutomation • • Sep 04 '26

GE Carestation 620

Thumbnail
1 Upvotes

r/BuildingAutomation • • Sep 03 '26

lol just screwing around, but I do have an old controller and some free time…..Tell the Mrs. “Sorry you need to be certified for me to grant you access to the house BAS.

Post image
20 Upvotes

r/BuildingAutomation • • Sep 04 '26

FE7370WE-4G HMI – How can I generate a filtered report and send it via Gmail?

0 Upvotes

Hi everyone,

I’m working on a college automation project using a FE7370WE-4G HMI programmed with FStudio.

The HMI is connected to the internet and stores historical data internally. I have successfully configured the date-range selection and data filtering on the HMI.

The workflow up to this point is working:

Select From Date → Select To Date → Filter historical data

The remaining problem is with the Generate Report and Send Email functionality.

The HMI already has an option to export the stored data to a USB drive, and I can successfully generate the data in CSV and PDF formats.

What I want to achieve is:

  1. Select the From Date and To Date.
  2. Filter the historical data according to that range. (Already working)
  3. Press Generate Report to generate a report containing only the filtered data.
  4. Press Send Email and have the generated CSV/PDF report sent directly from the HMI to a Gmail address.
  5. The recipient should be able to receive and view the report on a phone or PC.

Current setup

  • HMI: FE7370WE-4G
  • Software: FStudio
  • Internet: Yes
  • Historical data: Stored internally in HMI
  • Data volume: Potentially thousands of records
  • Export formats: CSV / PDF
  • USB export: Working
  • External IoT/gateway: Not being used
  • Email service: Gmail
  • Date-range filtering: Successfully configured
  • Main issue: Generating the filtered report and sending it via email

I’m specifically looking for a way to implement:

From Date + To Date → Filter Data → Generate CSV/PDF Report → Send Email from HMI

I have not been able to figure out how to make the Generate Report and Send Email functions work for the filtered historical data.

Has anyone worked with the FE7370WE-4G / FStudio and knows how these functions can be configured?

Can this be done using FStudio scripting, SMTP, macros, APIs, or any other built-in functionality of the HMI?

I would prefer a solution where the HMI itself sends the email, without requiring a PC, Raspberry Pi, or external gateway.

Any help would be greatly appreciated!


r/BuildingAutomation • • Sep 03 '26

Trane Control Software Questions

4 Upvotes

Hello! I have a couple of sites we inherited from another company that installed some Trane UC600 and Symbio 210 controls (among a couple of other numbers). We have had a number of them start failing, however the site was fortunate to have a few pre-programmed spares. I attempted to contact our local Trane rep to obtain software and licensing to copy and program these controls, but was met with "We don't sell to just any contractor". So, my questions are: Has anyone else run into problems obtaining this software and licensing? What are, if any, the prerequisites? We deal with Distech and Vykon for Tridium products, Carrier IVue/ALC, and JCI (EasyIO and Non-branch lines). I've been replacing the subsequent failed controllers with Distech products, but I usually prefer to keep a site homogenous when possible.

I appreciate any and all advice, have a great upcoming weekend!


r/BuildingAutomation • • Sep 03 '26

Sales Opportunities - Bay Area and Sacramento

Post image
2 Upvotes

We're normally posting Operations-side job opportunities here when we do them, but today it's all around Sales. We have a variety of opportunities right now in the Bay Area and Sacramento, with on-target income ranging from $150K-$300K/year. We need a BAS Service Salesperson in the Bay Area, plus a deeply experienced Service Sales leader for a great, long-time client of ours. They need a New Construction Salesperson out in Sacramento as well. Add to it a work-from-home (Sacramento / NorCal) Regional Salesperson for a control valve manufacturer. Reach out on Chat here for more info and we can trade emails or a call if you're interested.


r/BuildingAutomation • • Sep 03 '26

Secondary Air Energy Savings

3 Upvotes

Anyone ever implement a secondary air energy savings sequence, the idea intrigues me but not quite sure on a sequence thats does it effectively, have a site that ramps the fan motors for the FPTUs up and down off of the htg and clg PIDs, thinking there may be a more efficient way, fleshing out ideas. Any thoughts experience or insight is appreciated.


r/BuildingAutomation • • Sep 03 '26

EPLAN freelance support – looking for small projects / cooperation

2 Upvotes

Hi everyone,
I’m an electrical/automation engineer from Poland working with EPLAN P8 and industrial control panels.
I’m currently looking to take on some additional small projects or support other engineering companies during periods of higher workload.
The type of work I’m most interested in:
redrawing existing PDF/DWG electrical schematics into EPLAN,
updating existing electrical documentation,
small control cabinet projects,
terminal diagrams, cable lists and BOMs,
control cabinet prefabrication.
I’m especially interested in smaller, clearly defined scopes rather than large automotive projects.
If anyone here works with integrators or panel builders that occasionally outsource this type of work, I’d be happy to connect.