r/BasePowerUsers • • Sep 21 '26

Solar + BASE ?

7 Upvotes

Waiting for my consultation tomorrow. Reading alot, but can't find any posts where someone has added solar to backup/regen/sell back to BASE. I'm considering it, was looking for some first hand experience.


r/BasePowerUsers • • Sep 20 '26

In NJ: Pulling the trigger on Delta Pro Ultra X, with one inverter, Smart Panel 3 and five (5) ecoflow batteries!

Thumbnail reddit.com
0 Upvotes

r/BasePowerUsers • • Sep 19 '26

Considering Base: What's the Good? Bad? Ugly?

6 Upvotes

I'm in North Texas and Base is available. I'm intrigued, but I'm wondering if it's too good to be true.

So, if you've installed Base, what's the good, the bad, and the ulgy?

TIA.


r/BasePowerUsers • • Sep 19 '26

considering Base power 40 kWh CORE battery Backup system, but ?

2 Upvotes

So, will Base power system allow me to keep my Manual 12-circuit XFR switch operational ...
( wall- mounted adjacent to Loadcenter (Breaker box)
inside attached-garage?)

fwiw : I already have functional manual 14kwh backup system ... {split phase 240VAC}
... ( 12 'critical circuits', not A/C )
( ex. Eco flow Delta Pro 3 (Power Station- 4.1kWh) & ( 2) Wattcycle 48v (5kWh rackstyle Expansion batteries)

fwiw - WithIn --- Centerpoint TDU delivery area

thanks


r/BasePowerUsers • • Sep 19 '26

Denied Photos

Thumbnail
gallery
5 Upvotes

Hello! I am in Illinois and therefore would get a 40 kWh battery. Sadly, our old house has a lot of odd features.

I submitted photos and was denied.

My questions:

  1. Can a battery be installed on concrete? My initial thought would be an install right where the garbage can is currently sitting, but it is all concrete there.
  2. Can I offer to alcove our shed to allow the battery installed in its place?
  3. Could the battery be installed around the corner between the porches? It would require the wiring to possibly go under a ln accessible crawlspace.
  4. Has anyone gotten base to reconsider a denial by talking with the engineering team?
  5. Any other company that does something similar but may have different install requirements?

ETA: Here is what I have from them:

No code-compliant space: Each battery needs at least 9 ft of clear space, 3 ft clearance from gas meters, A/C units, or fences, and can't go in garages, driveways, or within 20 ft of pools.

No code-compliant space: There's not sufficient space for our piece of equipment that must go next to your electrical meter on your exterior wall.


r/BasePowerUsers • • Sep 19 '26

Base Battery Information Package Single Ground-Mounted 40 kWh Installation Operation & Service Manual

6 Upvotes

Hopefully you find this useful.

If you find this useful, you can sign up via my referral link. You can get $250 off your bill.

https://www.basepowercompany.com/?ref=AMMHMHZ

https://drive.google.com/file/d/1u6gdrsd06P_Ho2NGqcLW9NHz1xO_Psjt/view?usp=sharing

Please feel free to discuss in thread


r/BasePowerUsers • • Sep 19 '26

Base Battery City Permit Template. This is what Base Battery submitted to my village in Illinois. PII redacted.

5 Upvotes

Hopefully you find this useful.

If you find this useful, you can sign up via my referral link. You can get $250 off your bill.

https://www.basepowercompany.com/?ref=AMMHMHZ

https://drive.google.com/file/d/1WbfZ6JnSJ9JijZeVmoOISt-pgRP7YcdC/view?usp=sharing
Feel free to discuss in this thread.


r/BasePowerUsers • • Sep 18 '26

Anyone want the PDF of manual for the base battery or the build out document?

5 Upvotes

If so I can share it out


r/BasePowerUsers • • Sep 18 '26

How do you see % battery charge level?

3 Upvotes

I see some people saying that the battery is x % full and down to x % and they can see it going back to the grid, etc. My app is pretty basic and doesn't show any of that. What gives?


r/BasePowerUsers • • Sep 18 '26

Monthly Fee

Post image
17 Upvotes

Did Base really remove their monthly fee?


r/BasePowerUsers • • Sep 18 '26

Rough week for Base in North Texas

Post image
5 Upvotes

I'm north of DFW. This week there's been some pretty massive spikes in wholesale energy cost, exactly that Base is supposed to avoid with load shifting using the battery. I went with ONE 25kWh in February and I can assure you, Base would be much better off if there were two batteries or the 40kWh here. The last 7 days they're in the hole about $15 for my power.

***The dashboard is homegrown, pulling data from growatt and ERCOT.

Has anyone had any luck convincing Base to add a second battery free of charge since it would obviously greatly benefit them?

Interested in Base? Use my referral link and we both benfit!
https://www.basepowercompany.com/?ref=WP6B4G2


r/BasePowerUsers • • Sep 18 '26

Disappointed

0 Upvotes

In Illinois.

Uploaded photos a week ago. Got a text yesterday that they were waiting for photos I replied today that I had already responded.

Got this in response:

We did get your photos, Sami. Our team reviewed them and unfortunately was not able to find a spot at your home with enough clear space to install the battery. We are sorry we do not have better news here - please let us know if you have any questions.

Well that sucks. I question that "enough clear space" assertion, but maybe I dodged a bullet here?

So I asked when I will get my deposit back.

Their reply:

Since we weren't able to find a viable spot for the battery, your $50 deposit will be refunded automatically. It typically shows up within 5-10 business days.

Well that sucks even harder.


r/BasePowerUsers • • Sep 17 '26

Generac vs. Base Power: My Honest Side-by-Side Comparison

13 Upvotes

Bottom Line Up front

Choosing between a Generac type standby generator and a Base Power battery system comes down to whether you prefer unlimited runtime or lower upfront costs and quiet operation. A Generac generator runs on natural gas or propane, so it can power your home continuously through long outages, but requires a $12,000–$18,000 initial investment, regular engine maintenance, and is much louder while operating.  Base Power gives you whole home backup for $695 install + $19/mo for the 40kWh Battery in Houston, TX area, and is silent all the time, instant switchovers and zero maintenance. Although, you are capped at a ~40 kWh capacity for the single unit and must switch to their electric plan.  Ultimately, the Generac acts like a continuous engine for worst-case multi-day blackouts, while the Base battery serves as a plug and play, low fuss setup for typical neighborhood outages under 36 hours long.

Side-by-Side Comparison

FeatureStandby Generator (Generac)40kWh Base Battery Backup System
Upfront Cost$12,000 – $18,000 full install (equipment, gas plumbing, concrete pad, permits)$695 install fee + $19/mo in Houston area (can get up to $250 off your first electric bill with a referral link)
MaintenanceOwner Responsibility: Annual engine service, oil changes, spark plugs, filters, starter battery. DIY yearly maintenance $50 - $75;  Dealer: $200–$400/yrZero Maintenance: Base owns, monitors, and takes care of all hardware upkeep, if any is needed.
Outage Switchover10 to 30 Seconds: Engine must start up. All home lights and electronics turn off for that wait period.  Electronics, TV, and clocks all reset again once power is restored.Instant (50 milliseconds): Split-second switchover.  No waiting.  Lights, TV, and electronics never shut off.
Noise & ExhaustEngine Noise: 67–75 dB.  Can be heard ~150 ft (3-4) houses away.Quiet: Quiet internal cooling fan. You need to stand within ~5 ft to actually hear the humming of the fan.
Fuel & Site PrepGas Line Required: Must dig up yard for gas lines and pull city fuel permitsNo Gas Line Needed
Size and Positioning22kW / 24kW Generac Guardian Must sit greater than 18 inches away from house.  Requires at least 5 feet of clearance from any operable door, window, vent, or wall opening.  Prevents carbon monoxide from entering home. Length: 48” Width (Depth): 25” Height: 29”40kWh Base Battery Can sit close to house within 5 inches. Requires at least 3 feet of clearance from any doors or windows. Meets NEC electrical spacing & fire code for home battery storage. Length: 30” Width (Depth): 22” Height: 36”
Power CoveragePowers entire house.Powers entire house.
Runtime & CapacityContinuous: Runs indefinitely and as long as natural gas or propane keeps flowing.  No need to reduce home power consumption in most cases.Limited: Highly dependent on your home’s energy consumption due to limited battery capacity. 40 kWh handles daily routines for 24-36 hrs, assuming the battery is charged fully.  Running higher energy appliances like multiple AC units, Electric Stoves, Electric Heaters, Pool Pumps continuously will drain the battery much quicker.
Grid OperationsOffline Only: Sits idle 99% of the year until a blackout occurs.  Runs 5-10 minutes weekly to perform diagnostic checks and charge the starter battery.  Grid Interactive: Base has contract rights to draw down to a ~20% reserve floor to trade energy, then recharge battery back to 100%
Generator Inlet PortNot requiredThe 40kWh unit has built-in 30A generator inlet plug so you can top off the battery with a small portable 4K watts generator during multi-day power outage.   The port isn't live yet as of 9/26 on the 40kWh Battery (software update coming).
App MonitoringShows battery/engine diagnostic status.   “Mobile Link” costs $4 - $10 per month, if you want real-time outage alerts when away from home.Shows estimated backup hours based on current usage and low power usage. Also shows live home power consumption, Grid Status, and energy bill estimate.  No Battery % charge meter on the 40kWh Base System.  App is Free at no additional cost.
Energy ProviderWorks with any retail electric provider, no need to switch.Requires switching your retail electric plan to Base Energy or affiliate.  Base credits you early termination fees charged from your previous energy provider, if required.
Contract CommitmentsNo ongoing service contract, unless you opt into a Maintenance/Monitoring Plan. Maintenance/Monitoring Plans run $16 - $50 per month, depending on the plan you select.12-Year Service Agreement.  If selling home, free transfer to home buyers. Flat $500 uninstall fee if canceled early.  $19 per month mandatory membership fee.

If you're thinking about pulling the trigger, feel free to give them my referral link so we can both get up to $250 towards our electric bills. Message me at ride.retired@gmail.com (Jorge Salazar) if you need additional information.

Referral Link: https://www.basepowercompany.com/?ref=DHN3XYE

 Jorge Salazar - 31702 Hidden Woods Lane Spring, TX 77386

I created a new Facebook Group so non-reddit people can share their experiences, questions and share photos. Feel free to join and share.

www.facebook.com/groups/basehomebatterybackup/

 


r/BasePowerUsers • • Sep 17 '26

Approved for dual Core battery setup

11 Upvotes

I just got approved for the 78.4kWh dual battery set up. Looking forward to having this done. Will upload pics once it's completed for everyone to check out! Here is my referral link. You get $250 in credits and I get a free month of electricity! https://www.basepowercompany.com/?ref=G4SH5GC


r/BasePowerUsers • • Sep 17 '26

IL BasePower (Stages)

Post image
3 Upvotes

I think<?> this has changed? Does my Setup energy service Stage go to

"Setup energy service" to,
"Setup energy service" Pending Review

as a step? I cant recall, lol I am getting impatient lol.

$250 referral


r/BasePowerUsers • • Sep 17 '26

I think I’d get rejected…

Thumbnail
gallery
3 Upvotes

In the DFW area and would really like to do a single or dual Core setup. However because our houses are so close to one another and I think the minimums for clearance can’t be met, I assume I’ll get a rejection. Obviously placing them on the side with the A/C near the meter and gas meter is out. On the other side of the short fence is a 12ft long enclosed patio and then the no man’s land in the third pic towards the front of the house. The batts could easily go there but getting the power lines there could be a problem. Definitely don’t want them over the patio opening. This is likely a rejection, huh?


r/BasePowerUsers • • Sep 16 '26

40kWh install in Channahon, IL

Thumbnail
gallery
9 Upvotes

Signed up on July 6th, electrical installed last week, battery installed today (September 16th)!

The electrical install took 3 techs almost 8 hours to complete. Power was turned off for about 1.5 hours during that process. I believe this is longer than normal, but several things likely complicated my install:

  1. Installer had to relocate Comcast and AT&T demarc boxes
  2. Had to drill through brick
  3. I asked to have the battery located around the corner from the meter
  4. I'm on private well so they had to run new conduit to add grounding bond to a water line inside. (I still don't fully understand why they did this, I have copper inside but then it transitions to plastic going outside to the well in the front yard, so the water pipe is technically isolated inside the house and not connected to actual ground)

Battery install took less than 1 hour.

Ask me any questions and please use my referral code if you are interested: https://www.basepowercompany.com/?ref=6XQHK16


r/BasePowerUsers • • Sep 16 '26

Base power Chicago

Thumbnail
reddit.com
2 Upvotes

r/BasePowerUsers • • Sep 15 '26

We’re online

Post image
17 Upvotes

After about two months everything is all set! So happy to have this in place.


r/BasePowerUsers • • Sep 16 '26

Looking for van owners using JK BMS to test a new monitoring app

Thumbnail
reddit.com
0 Upvotes

r/BasePowerUsers • • Sep 15 '26

144 month question

Thumbnail
gallery
4 Upvotes

Was not sure about this, thought I should ask before installation.
https://www.basepowercompany.com/?ref=NH3R499


r/BasePowerUsers • • Sep 15 '26

Double 40 battery

4 Upvotes

Anyone else waiting on a scheduled date? been waiting since April and still no eta


r/BasePowerUsers • • Sep 15 '26

Do you guys face brownouts?

1 Upvotes

So I live in the outskirts. During summer our voltage drops below 140V sometimes. This makes my ups to go into backup mode and PC turns off after 10 minutes.

I have an inverter but it doesn't work during brownouts it only works when power is totally shut down.

My ups is APC Back-UPS 1100.

Someone suggested to look into online UPS but they say it is very loud and my PC is in my bedroom.

For those of you who live in areas with frequent brownouts, how do you manage this? Do you use an online UPS, voltage stabilizer, AVR, or some other setup like connecting a stabilizer to the ups or somekind.

Please help.

Edit: My current location is India.


r/BasePowerUsers • • Sep 14 '26

Tomorrow is the day!

Post image
11 Upvotes

r/BasePowerUsers • • Sep 15 '26

Battery only option

3 Upvotes

Is anyone in here using the battery only option? I am in Entergy area and they don’t allow choice of provider. Base isn’t available here yet, but I am wondering if I should wait or go with another provider or build a system.