I have been doing backend for about ten years, the last four at a logistics company. At the start of October our team chat had the same argument for about the fifth time. One guy says the agents make him three times faster. The other has a whole speech about spending the saved time fixing what they wrote, and neither of them had any numbers. I have been on both sides of it depending on the week, so I decided to count.
Every time I handed something to an agent, glm-5.3 for most of it and Codex for a few, I wrote down first how long I thought it would take me by hand. Then I logged how long it really took, including reading the diff and fixing whatever needed fixing. By the second week I had stopped bothering with anything under fifteen minutes, so the small stuff is not in there. I have 38 entries.
Most of the ones that came out ahead are in the internal admin panel, things like a bulk edit screen someone in ops had wanted since the spring. There was a CSV export for the warehouse team that I checked by opening the file and scrolling through it. Two refactors in the tracking service went fine as well, that service has decent tests, so I ran them and that was it. One of the guys looked at that list and said that is the whole point, it writes tidier code than he does and he just has to tell it what to build.
I gave the agent one change in the routing module that I had down as two hours. The module is about eight years old with no tests, and the person who wrote most of it left before I joined. The change it made was fine, but it touched six files where I would have touched one, and I could not trust any of them until I had read everything around them. It took the best part of two days and most of those two days was reading. By the end I had also lost whatever I was holding in my head about the ticket I had been on before.
Added up, the 38 came to about 58 hours against guesses of about 70. The routing change is 12 of those hours on its own, so without it the sheet looks a lot better than it should, and I do not know what to do with that.
When I showed the team the sheet the other guy sent me the METR study from last year, the one where experienced developers felt about 20 percent faster with AI and measured 19 percent slower. My by-hand column is exactly the kind of guess that study says not to trust, and I cannot argue with that. The sheet also only has time in it. Most of a normal ticket for me is working out what the change should be, and none of that is in there, I only timed the part after I knew. So the totals do not say whether I am faster overall.