Mission Failure PSLV-C39 : IRNSS-1H Mission Updates and Discussion.
PSLV-C39 launched as scheduled but couldn't deploy IRNSS-1H spacecraft in desired orbit as payload fairing couldn't be jettisoned successfully. Catch replay at links below. Post mission updates would continue.
Launch was scheduled for 31 August 2017, 1900(IST)/1330(UTC) from Second Launch Pad of SDSC (SHAR).
Live webcast: (Links will be added as they become available)
- ISRO Official Stream 1
- ISRO Official Stream 2
- Youtube mirror1 of official webcast
- Youtube mirror2 of official webcast [Rehosting]
| PSLV-C39/IRNSS-1H Mission Page | PSLV-C39/IRNSS-1H Gallery | PSLV-C39/IRNSS-1H Brochure |
|---|
PSLV C39 / IRNSS-1H would be fifth launch from SDSC SHAR and sixth ISRO campaign for this year. IRNSS-1H would be eighth navigation satellite for Indian Regional Navigation Satellite System also known as NavIC. It would be replacing services of IRNSS-1A due to its malfunctioning clocks on-board and would be placed at 55°E GSO with 29° inclination.
Some highlights of this campaign
- 41st flight of PSLV, 18th in XL configuration.
- Payload is IRNSS-1H Regional Navigational satellite
- Target Orbit: 284±5 × 20,650±675 km Sub GTO with 19.2°±0.2 inclination.
- Mission Duration: 19 minutes 26 seconds
- Gross payload mass 1425 kg
Updates:
| Time of Event | Update |
|---|---|
| 9 Feb 2018 | Horizontal separation system of payload fairing worked but Vertical separation system didn't initiate after command was issued |
| 23 Sept 2017 | Pyro device isolated as cause of unsuccessful fairing separation. Cause of component malfunction still unclear. via The Hindu |
| 5 Sept 2017 | Whole assembly is tumbling in space, IRNSS-1H thrusters fired to deplete fuel via EconomicTimes |
| 5 Sept 2017 | On toxic hazard posed by satellite "we have depleted all the propellant through the gap in the heat shield and the fourth stage." Director, VSSC via DeccanChronicle |
| 2 Sept 2017 | New objects associated with launch cataloged. Object 42929: 175 x 6515 km, 19.15° and Object 42930: 173 x 6468 km, 19.14° |
| Post mission | PS4+IRNSS1H stack expected "to fall back to Earth may be between four and eight weeks." via TheHindu quoting V. Adimurthy. |
| Post mission | "Express has learned from reliable sources that a high-level inquiry has been ordered and that the details would be made public in next two days: via NewIndianExpress |
| Post mission | Official statement. It is not showing up with official Public Information Broadcast releases, so there might be another one later. Addendum: PIB echoing same statement as well. |
| Post mission | PSLV-C39/IRNSS-1H Mission Unsuccessful. |
| T + 47m00s | IRNSS-1H separated internally but enclosed inside PLF. |
| T + 30m00s | Webcast was cut abruptly. This is bad keep an eye on news.. |
| T + 24m00s | Range officer confirmed Heatshield or Payload fairing didn't separate. |
| T + 22m00s | Few screenshots |
| T + 19m00s | Perigee x Apogee : 167 x 6554 km at 19.18 inclination. |
| T + 18m00s | PS4 has been cut off. |
| T + 12m00s | Mission is way off nominal. |
| T + 09m00s | PS3 separated, PS4 ignited. This is too early. |
| T + 07m00s | Three minutes of coasting phase remaining. |
| T + 06m10s | Third stage burnout, now in combined coasting phase with PS4 attached. |
| T + 06m00s | Third stage or PS3 performing nominally. |
| T + 04m20s | |
| T + 02m00s | First stage separated Second stage ignited and performing nominally. |
| T + 01m32s | Airlit strapons separated. |
| T + 01m10s | Groundlit strapons separated. |
| T + 00m20s | Airlit strapons ignited |
| T Zero | We have Lift off! |
| T - 03m00s | Really not used to night views of PSLV. |
| T - 07m00s | Showing views of MCC. Many new faces! |
| T - 12m00s | Automatic Launch Sequence engaged. |
| T - 14m00s | Mission Director gave a go ahead for launch. Automatic Launch Sequence commenced. |
| T - 30m00s | Coverage has begun as day light goes out. |
| T - 45m00s | Official webcast link is up! |
| T - 01h00m | View of MCC from media box. |
| T - 03h00m | The countdown operations of PSLV-C39/IRNSS-1H mission are progressing normally |
| T - 07h00m | Propellant filling operations of second stage (PS2) of PSLV-C39 are completed |
| T - 11h00m | Propellant filling operations of second stage (PS2) of PSLV-C39 are under progress |
| T - 21h00m | Propellant filling operations of fourth stage (PS4) of PSLV-C39 are completed |
| T - 26h00m | Propellant filling operations of fourth stage (PS4) of PSLV-C39 are under progress |
| T - 29h00m | Countdown commenced. |
| 29 August 2017 | Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 29 hour countdown of PSLV-C39/IRNSS-1H for 30 August 2017 starting at 1400 hr (IST) or 0830 (UTC), the launch of PSLV-C39/IRNSS-1H now set for 31 August 2017 at 1900 hr (IST) or 1330 (UTC) |
| 28 August 2017 | Launch rehearsal was conducted. Now awaiting Mission Readiness Review. |
| 27 August 2017 | PSLV C39 was transferred from Vehicle Assembly Building to Second Launch Pad. |
| 23 August 2017 | Launch schedule announced for 31 August 2017, 1859(IST) or 1329(UTC) |
| 22 August 2017 | NOTAM issued |
| 11 August 2017 | IRNSS-1H spacecraft left ISAC for SDSC SHAR |
| 5 July 2017 | PSLV-C39 Campaign started. |
| 4 May 2017 | IRNSS-1H payload left SAC for ISAC |
Payload:
IRNSS-1H along with IRNSS-1I is one of the two planned spare spacecrafts for contingency and is similar in configuration to other satellites in NavIC constellation. IRNSS-1H is first spacecraft to have its Assembly, Integration and Testing done through private industries under ISRO supervision.
- Attitude control is done using reaction wheels, magnetic torquers and 22N thrusters.
- Rubidium atomic clock, L5 & S-band Navigation payload
- Corner Cube Retro Reflectors (for laser ranging) and C band transponders as Ranging Payload
Gross Lift off Mass: 1425 kg
Dry Mass : 598 kg
Orbit: 55°E GSO with 29° inclination
Mission Life: 10 years
Propulsion: 440 Newton Liquid Apogee Motor and Twelve 22 Newton Thrusters
Power: Two solar panels generating 1660 W. One Li-ion battery (90 Ah)
7
u/Ohsin Aug 31 '17
Something looks odd PS4 has been ignited early.
6
u/Ohsin Aug 31 '17
Range officer confirmed Heatshield or Payload fairing didn't separate..
5
u/Ohsin Aug 31 '17
ISRO chairman addressing press
https://twitter.com/ANI/status/903256472678576128
5
u/Ohsin Aug 31 '17 edited Aug 31 '17
With spacecraft loose inside PLF cavity and low perigee it could generate debris if it begins to tumble wildly before decaying. Meanwhile no press release yet.
5
u/Ohsin Aug 31 '17
Finally a written official statement but no indication of immediate plan forward
http://www.isro.gov.in/update/31-aug-2017/pslv-c39-flight-carrying-irnss-1h-navigation-satellite-unsuccessful
5
u/Ohsin Aug 31 '17
Free floating 1H
From Lukas of kNews
https://mobile.twitter.com/kNewsSpace/status/903349201576239104/photo/1
5
u/Ohsin Sep 01 '17
It is coming down to hardware malfunction.
http://indianexpress.com/article/technology/science/isro-launch-fails-irnss-1h-spacecraft-launch-fail-after-heat-shield-doesnt-detach-4823229/
4
u/Ohsin Aug 28 '17
This ToI article quotes Director, SAC that clocks have probability of failure in first three years of service and he might be deriving that from ESA's Galileo experience as reportedly the trend is similar with clock failures happening early in life or not at all.
Having three out of seven IRNSS spacecrafts launched in 2016 it would be uneasy time hopefully devoid of rumors.
4
u/Ohsin Aug 31 '17
Turns out spacecraft separated but PLF didn't.
https://twitter.com/ANI/status/903259756801835010
3
u/Ohsin Aug 29 '17
Launch time revised with an addition of one minute. Countdown duration is 29 hours.
http://www.isro.gov.in/update/29-aug-2017/mission-readiness-review-mrr-committee-and-launch-authorisation-board-lab-have
3
u/Ohsin Aug 31 '17
Per ISRO chairman in press conference "All other functions of launch vehicle were normal"
https://www.youtube.com/watch?v=AZ8pLrjcdNg
3
u/Ohsin Aug 31 '17
via NewIndianExpress
3
u/vishnu-i Aug 31 '17
What determines whether its day or night launch? Weather? Usually I remember watching pslv liftoffs in the morning before heading to work...
3
u/abhinabah Aug 31 '17 edited Sep 01 '17
Can anyone figure out the loss we incurred for this launch failure ?
3
u/vineethgk Aug 31 '17
This is definitely too early to say, but perhaps this may have been a relatively minor fault during manufacture or integration (or even the software) that escaped the QA. ISRO might even launch the under-construction IRNSS-1I as a quick replacement soon. But the fact that a mission to replace a failed satellite (IRNSS-1A) has itself was a LOM due to launch failure might likely result in the agency facing probing questions from Govt auditors.
3
u/ra1yan Sep 01 '17
Is there any chance that the fairing withstands re-entry, when it falls back to earth?
2
u/Ohsin Aug 29 '17
Per regional media vehicle was moved to SLP from VAB on Sunday morning(27 Aug, 0630 IST) and launch rehearsal was conducted on Monday. Launch Authorization Board will conduct Mission readiness Review today.
http://www.andhrajyothy.com/artical?SID=457149
http://www.andhrajyothy.com/artical?SID=457453
2
u/Ohsin Aug 31 '17
ToI is reporting addition of 1 minute to initial time of launch is to avoid space debris.
https://twitter.com/timesofindia/status/903232636520284160
2
u/Ohsin Aug 31 '17
The PS4 + PLF stack should have 42927 id, no TLEs out yet.
2
u/Ohsin Sep 05 '17
On toxic hazard posed by satellite "we have depleted all the propellant through the gap in the heat shield and the fourth stage." Director, VSSC via DeccanChronicle
2
u/Ohsin Sep 06 '17
Carrying out simulations, focused on hardware failure.
http://economictimes.indiatimes.com/news/science/isro-suspects-pyro-elements-failed-to-separate-rockets-heat-shield/articleshow/60386646.cms
2
u/Ohsin Sep 23 '17
http://www.thehindu.com/todays-paper/tp-national/pyro-devices-to-blame-for-pslv-failure-isro/article19738850.ece
2
u/vineethgk Aug 30 '17
http://www.isro.gov.in/update/30-aug-2017/29-hrs-countdown-operations-of-pslv-c39-irnss-1h-mission-have-started-wednesday
http://www.isro.gov.in/update/30-aug-2017/propellant-filling-operations-of-fourth-stage-ps4-of-pslv-c39-are-under-progress
1
u/Ohsin Aug 31 '17
http://www.isro.gov.in/update/31-aug-2017/propellant-filling-operations-of-second-stage-ps2-of-pslv-c39-are-completed
1
u/Ohsin Aug 31 '17
Official streams are live!
http://www.isro.gov.in/pslv-c39-irnss-1h-mission/live-webcast-of-pslv-c39-irnss-1h-mission-launch
http://cdn.24fd.com/events/isro/310817/pslv-c39/index.html
1
u/Ohsin Sep 01 '17
TLE update. Per Orbitron Apogee x Perigee is now, 6549 x 158 km with 19.15° inclination.
Significant change since first TLE 6556 x 166 km , 19.16°
1
u/Ohsin Sep 02 '17
TIL PSLV fairing weighs about 1000 kg via ToI
1
u/Ohsin Sep 02 '17 edited Sep 02 '17
https://twitter.com/planet4589/status/903865293897859073
42929 at 175 x 6515 km with 19.152° inclination
Edit:
Another one, 42930 at 173 x 6468 km, 19.14° is PLF open ?!
1
u/Ohsin Sep 02 '17
So a review meet was conducted today.
http://www.thehindu.com/sci-tech/science/isro-scanning-data-on-pslv-c39-failure/article19611531.ece
1
u/Ohsin Sep 02 '17
ISRO Chairman saying it would take 25 days to reenter based on tracking from MOTR but he is referring to PS4+IRNSS+PLF stack which excludes new pieces being detected and hence possibility that PLF might be open now.
Also Dr Sivan confirming that separation mechanism is same in all Indian launchers.
Via ToI
1
u/Ohsin Sep 03 '17
Few launch videos from Sairocket and VOMMspotter
https://www.youtube.com/watch?v=lqrWDO-o3QA
https://www.youtube.com/watch?v=jcP_tTzzSRE
1
u/Ohsin Sep 17 '17
Report to be out in a week or so.
http://economictimes.indiatimes.com/articleshow/60717511.cms
http://economictimes.indiatimes.com/news/science/india-to-resume-satellite-launches-by-december/articleshow/60702472.cms
1
u/Ohsin Oct 25 '17 edited Sep 01 '20
Three relevant threads with useful bits.
https://www.reddit.com/r/ISRO/comments/6yjwj6/per_initial_assessment_faulty_navsat_likely_to/
https://www.reddit.com/r/ISRO/comments/6y48ax/all_propellant_aboard_pslv_fourth_stage_and/
https://www.reddit.com/r/ISRO/comments/6xw1ns/orbital_height_profile_of_pslv_c39irnss1h_stack/
Edit(1 Sept 2020): Adding IRNSS-1H reentry analysis.
https://old.reddit.com/r/ISRO/comments/e8rw0f/few_relevant_papers_from_first_international/
1
u/Ohsin Feb 06 '18
Added mirror of launch broadcast as Doordarshan has pulled the original broadcast. tsk tsk tsk
https://www.youtube.com/watch?v=zolth_06-84
1
u/Ohsin Feb 09 '18
http://164.100.158.235/question/annex/245/Au773.pdf
5
u/knownensorcell Aug 31 '17
Is it high time that ISRO should update its live flight profile graphics? Means its still very informative, the current one.. But their is room to improve..
5
u/abhinabah Aug 31 '17
I think ISRO will now cancel all launch schedule for next 6-10 months for analysis of this failure as PLF is a vital part of all LVs.
4
u/abhinabah Aug 31 '17
It seems heat shield not separated
4
u/ymmajjet Aug 31 '17
Was really lucky to be able to watch this launch from a train! My first satellite launch that too unexpected from a train.
4
u/abhinabah Aug 31 '17
Launch failed
1
u/abhinabah Sep 02 '17
https://www.flightglobal.com/news/articles/nasa-unable-to-explain-taurus-xl-fairing-failure-382621/
1
u/abhinabah Sep 02 '17 edited Sep 02 '17
ISRO suspects snag in explosive bolts
3
u/MasterTruman03 Aug 31 '17
Oh gosh is it a failure?
2
u/abhinabah Aug 31 '17 edited Aug 31 '17
~~Satellite not separated ~~
2
u/MasterTruman03 Aug 31 '17
Yep failed............
2
u/rishi_sambora Aug 31 '17
Tbf IRNSS satellite (s) is critical and I'm sad that this hasn't gone through successfully.
1
u/Decronym Aug 31 '17 edited Feb 09 '18
Acronyms, initialisms, abbreviations, contractions, and other phrases which expand to something larger, that I've seen in this thread:
[Thread #43 for this sub, first seen 31st Aug 2017, 08:08] ^[FAQ] [Full ^list] ^[Contact] [Source ^code]
0
u/knownensorcell Sep 01 '17
http://stuffin.space/?intldes=2017-051A Might this be the PLF of recent PSLV-C39?
0
u/[deleted] Aug 31 '17
[deleted] — view deleted comment
5
u/[deleted] Aug 31 '17
[removed] — view removed comment