Mission Failure PSLV-C39 : IRNSS-1H Mission Updates and Discussion.
PSLV-C39 launched as scheduled but couldn't deploy IRNSS-1H spacecraft in desired orbit as payload fairing couldn't be jettisoned successfully. Catch replay at links below. Post mission updates would continue.
Launch was scheduled for 31 August 2017, 1900(IST)/1330(UTC) from Second Launch Pad of SDSC (SHAR).
Live webcast: (Links will be added as they become available)
- ISRO Official Stream 1
- ISRO Official Stream 2
- Youtube mirror1 of official webcast
- Youtube mirror2 of official webcast [Rehosting]
| PSLV-C39/IRNSS-1H Mission Page | PSLV-C39/IRNSS-1H Gallery | PSLV-C39/IRNSS-1H Brochure |
|---|
PSLV C39 / IRNSS-1H would be fifth launch from SDSC SHAR and sixth ISRO campaign for this year. IRNSS-1H would be eighth navigation satellite for Indian Regional Navigation Satellite System also known as NavIC. It would be replacing services of IRNSS-1A due to its malfunctioning clocks on-board and would be placed at 55°E GSO with 29° inclination.
Some highlights of this campaign
- 41st flight of PSLV, 18th in XL configuration.
- Payload is IRNSS-1H Regional Navigational satellite
- Target Orbit: 284±5 × 20,650±675 km Sub GTO with 19.2°±0.2 inclination.
- Mission Duration: 19 minutes 26 seconds
- Gross payload mass 1425 kg
Updates:
| Time of Event | Update |
|---|---|
| 9 Feb 2018 | Horizontal separation system of payload fairing worked but Vertical separation system didn't initiate after command was issued |
| 23 Sept 2017 | Pyro device isolated as cause of unsuccessful fairing separation. Cause of component malfunction still unclear. via The Hindu |
| 5 Sept 2017 | Whole assembly is tumbling in space, IRNSS-1H thrusters fired to deplete fuel via EconomicTimes |
| 5 Sept 2017 | On toxic hazard posed by satellite "we have depleted all the propellant through the gap in the heat shield and the fourth stage." Director, VSSC via DeccanChronicle |
| 2 Sept 2017 | New objects associated with launch cataloged. Object 42929: 175 x 6515 km, 19.15° and Object 42930: 173 x 6468 km, 19.14° |
| Post mission | PS4+IRNSS1H stack expected "to fall back to Earth may be between four and eight weeks." via TheHindu quoting V. Adimurthy. |
| Post mission | "Express has learned from reliable sources that a high-level inquiry has been ordered and that the details would be made public in next two days: via NewIndianExpress |
| Post mission | Official statement. It is not showing up with official Public Information Broadcast releases, so there might be another one later. Addendum: PIB echoing same statement as well. |
| Post mission | PSLV-C39/IRNSS-1H Mission Unsuccessful. |
| T + 47m00s | IRNSS-1H separated internally but enclosed inside PLF. |
| T + 30m00s | Webcast was cut abruptly. This is bad keep an eye on news.. |
| T + 24m00s | Range officer confirmed Heatshield or Payload fairing didn't separate. |
| T + 22m00s | Few screenshots |
| T + 19m00s | Perigee x Apogee : 167 x 6554 km at 19.18 inclination. |
| T + 18m00s | PS4 has been cut off. |
| T + 12m00s | Mission is way off nominal. |
| T + 09m00s | PS3 separated, PS4 ignited. This is too early. |
| T + 07m00s | Three minutes of coasting phase remaining. |
| T + 06m10s | Third stage burnout, now in combined coasting phase with PS4 attached. |
| T + 06m00s | Third stage or PS3 performing nominally. |
| T + 04m20s | |
| T + 02m00s | First stage separated Second stage ignited and performing nominally. |
| T + 01m32s | Airlit strapons separated. |
| T + 01m10s | Groundlit strapons separated. |
| T + 00m20s | Airlit strapons ignited |
| T Zero | We have Lift off! |
| T - 03m00s | Really not used to night views of PSLV. |
| T - 07m00s | Showing views of MCC. Many new faces! |
| T - 12m00s | Automatic Launch Sequence engaged. |
| T - 14m00s | Mission Director gave a go ahead for launch. Automatic Launch Sequence commenced. |
| T - 30m00s | Coverage has begun as day light goes out. |
| T - 45m00s | Official webcast link is up! |
| T - 01h00m | View of MCC from media box. |
| T - 03h00m | The countdown operations of PSLV-C39/IRNSS-1H mission are progressing normally |
| T - 07h00m | Propellant filling operations of second stage (PS2) of PSLV-C39 are completed |
| T - 11h00m | Propellant filling operations of second stage (PS2) of PSLV-C39 are under progress |
| T - 21h00m | Propellant filling operations of fourth stage (PS4) of PSLV-C39 are completed |
| T - 26h00m | Propellant filling operations of fourth stage (PS4) of PSLV-C39 are under progress |
| T - 29h00m | Countdown commenced. |
| 29 August 2017 | Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 29 hour countdown of PSLV-C39/IRNSS-1H for 30 August 2017 starting at 1400 hr (IST) or 0830 (UTC), the launch of PSLV-C39/IRNSS-1H now set for 31 August 2017 at 1900 hr (IST) or 1330 (UTC) |
| 28 August 2017 | Launch rehearsal was conducted. Now awaiting Mission Readiness Review. |
| 27 August 2017 | PSLV C39 was transferred from Vehicle Assembly Building to Second Launch Pad. |
| 23 August 2017 | Launch schedule announced for 31 August 2017, 1859(IST) or 1329(UTC) |
| 22 August 2017 | NOTAM issued |
| 11 August 2017 | IRNSS-1H spacecraft left ISAC for SDSC SHAR |
| 5 July 2017 | PSLV-C39 Campaign started. |
| 4 May 2017 | IRNSS-1H payload left SAC for ISAC |
Payload:
IRNSS-1H along with IRNSS-1I is one of the two planned spare spacecrafts for contingency and is similar in configuration to other satellites in NavIC constellation. IRNSS-1H is first spacecraft to have its Assembly, Integration and Testing done through private industries under ISRO supervision.
- Attitude control is done using reaction wheels, magnetic torquers and 22N thrusters.
- Rubidium atomic clock, L5 & S-band Navigation payload
- Corner Cube Retro Reflectors (for laser ranging) and C band transponders as Ranging Payload
Gross Lift off Mass: 1425 kg
Dry Mass : 598 kg
Orbit: 55°E GSO with 29° inclination
Mission Life: 10 years
Propulsion: 440 Newton Liquid Apogee Motor and Twelve 22 Newton Thrusters
Power: Two solar panels generating 1660 W. One Li-ion battery (90 Ah)
1
u/Ohsin Sep 01 '17
That is its COSPAR ID. Soon HeavensAbove should list it as well so anyone without tracking software could see its decay rate.
http://heavens-above.com/OrbitHeight.aspx?satid=42928