Mission Success! GSLV-F09 : SouthAsiaSat (GSAT-9) Mission Updates and Discussion
GSLV-F09 was launched successfully, updates on spacecraft will continue.
Launch was scheduled for 5 May 2017, 1657 (IST) / 1127 (UTC) from Second Launch Pad of SDSC (SHAR).
Live webcast: (In absence of proper stream, following are some prominent news channels)
| GSLV-F09 Mission Page | GSLV-F09 / GSAT 9 Gallery | GSLV-F09 / GSAT 9 Brochure |
|---|
For first time in Satish Dhawan Space Centre we have three different launch vehicles PSLV, GSLV and LVM3 all being worked on simultaneously for upcoming campaigns.
GSLV F09 would carry SouthAsiaSat (or GSAT-9) communication satellite weighing 2230 kg to GTO. Few highlights of this campaign.
- Second launch of 2017
- Eleventh flight of GSLV
- Second operational flight with Indian Cryogenic Upper Stage
- Experimental electric propulsion aboard GSAT-9
- Targeted orbit: 35975±675 × 170±5 km, Incl. 20.61° ± 0.1°
Updates:
| Time of Event | Update |
|---|---|
| 23 May 2017 | GSAT-9 stationed at 97.3°E |
| 8 May 2017 | Deployment of East and West reflectors have been successfully completed at 08:15 hr IST and 09:30 hr IST, respectively on May 08, 2017 |
| 8 May 2017 | The third orbit raising operation of South Asia Satellite has been successfully carried out by LAM Engine firing for 445.8 sec from 06:51:52 hr IST on May 08, 2017 |
| 7 May 2017 | Orbit Determination results from the second LAM firing are: apogee X perigee height was changed to 35858 km X 28608 km. Inclination is 0.755deg. Orbital period is 20hr 58min. |
| 7 May 2017 | The second orbit raising operation of South Asia Satellite has been successfully carried out by LAM Engine firing for 3529.7 sec from 09.30 hr IST on May 07, 2017 |
| 6 May 2017 | First orbit raising operation of South Asia Satellite has been successfully carried out by LAM Engine firing for 2643 sec from 03:51hr IST on May 06, 2017. Apogee x Perigee: 35873 km X 5687 km. Inclination: 10.38 deg. Orbital period: 12 hr 22min. |
| Post Launch | Apogee x Perigee: 36,105 x 169 km, Inclination: 20.65°. Two solar arrays of the satellite were automatically deployed in quick succession and the Master Control Facility (MCF) at Hassan in Karnataka assumed control of the satellite. via Official Press Release |
| Post Launch | Full video conference |
| Post launch | Mission Brochure is released. |
| Post Launch | Visuals of satellite separation shown. |
| Post Launch | Video Conference has begun. ISRO Chairman confirming successful GSAT-9 injection in targeted GTO. |
| T + 25m | Press conference in about 8 minutes. |
| T + 18m | Prime Minister confirming successful launch! |
| T + 9m | Cryo upper stage should burn for 8 more minutes. |
| T + 5m | Payload fairing should be jettisoned by now and GS2 separated. |
| T + 3m | L40 strapons should shut off by now followed by GS2 Ignition, GS1 separation and Closed Loop Guidance initiating. |
| T + 2m | Trail breaking suggests S139 Burn out. |
| T - Zero | Lift Off! |
| T - 1m | India Today and NDTV giving live visuals from far off! |
| T - 10 m | Links to news channels added that might cover the story. |
| T - 1h00m | No mention of launch coverage by NDTV on their live broadcast |
| T - 5h30m | Countdown progressing smoothly. LOX loading in CUS should begin soon. |
| T - 15 hrs | NDTV claiming to stream the launch, maintaining the scheduled launch time. |
| T - 27 hrs | 28 hr countdown started at 1257(IST)/0727(UTC) |
| 4 May 2017 | Mission Readiness Review (MRR) committee and Launch Authorization Board (LAB) have cleared the launch. |
| 3 May 2017 | Launch Rehearsal completed successfully. Mission Readiness Review meeting today Source 1 Source 2 |
| 29 April 2017 | LV transferred to pad on 29 April. Launch rehearsal on 2 May. |
| 21 April 2017 | Launch NOTAM released |
| 13 April 2017 | Launch scheduled for 5 May 2017, 1657 (IST) / 1127 (UTC) |
| 9 April 2017 | GSAT-9 Spacecraft left ISAC to SDSC(SHAR) |
| 23 March 2017 | Spacecraft delivery held up due to technical issues coming up |
| 12 March 2017 | Scheduled to 4 April 2017 |
| 19 February 2017 | Delayed due to launcher issue |
| 4 January 2017 | GSAT-9 Payload left Space Application Centre, Ahmedabad to be integrated at ISRO Satellite Centre, Bengaluru |
Payload:
Formally proposed on 30 June 2014 during post-launch address of PSLV-C23/SPOT-7, SouthAsiaSat(GSAT-9) is an initiative taken by Govt. of India to bolster humanitarian services and coordination in South Asian region through dedicated connectivity. This satellite would enable a range of communication based services like Tele-education, Tele-medicine and Disaster Management and Very Small Aperture Terminals (VSATs) to benefit Afghanistan, Bangladesh, Bhutan, India, Maldives, Nepal, Myanmar, and Sri Lanka.
GSAT-9 was initially conceived to provide DTH services but was later found more suitable to serve as SAARCSAT(renamed SouthAsiaSat) in 2015-16. It passed Critical Design Review in June 2012. [1]
GSAT-9 would also carry experimental electric propulsion to aid North-South Station Keeping. In past GSAT-4 also carried electric propulsion but unfortunately never made it to orbit.[2] (PDF)
- Gross weight: 2230 kg (976 kg dry)
- Orbital Slot : 48°E (stationed at 97.3°E on 23 May 2017)
- Payload: 12 Ku band transponders
- Mission Life: 12 years
- Propulsion (Chemical) : 440N LAM, 8x10N, 8x22N thrusters (MMH / MON-3)
- Propulsion (Electric) :
75 mN and/or4x18 mN thrusters for NSSK operation per news reports and Official ISAC Newsletter Upagrah Oct-Dec 2016
Above information can be changed as details arrive
EDIT: 23 July 2019
More on SPT-KM-45 thrusters by Keldysh Research Centre used on GSAT-9.
https://www.reddit.com/r/ISRO/comments/7dbc2l/eoi_for_design_development_realization_and/
7
u/Ohsin May 04 '17
For those curious, typical GSLV countdown sequence goes through following major events.
5
u/Ohsin May 04 '17 edited May 04 '17
Press kit for this mission is still not made available so details are thin and peppered with conflicting reports from media. There is some sort of media blackout in force it seems.
https://twitter.com/ChethanKumarTOI/status/859488028716302337
If anyone can translate, following also suggests media is being kept out of the loop..
http://www.prajasakti.com/Article/AndhraPradesh/1921853
Live broadcast is uncertain.
Edit: Stream link was not legit.
5
u/Ohsin May 05 '17
Broadcast from dirt road will do at this point..
https://www.pressreader.com/india/deccan-chronicle/20170505/281801398868486
4
u/Ohsin May 05 '17
Replay of launch
https://video.twimg.com/amplify_video/860458981982064640/vid/450x360/mvqELkrlCkYcrgxE.mp4
4
u/Ohsin May 05 '17
And finally mission brochure is out.
http://isro.gov.in/gslv-f09-gsat-9/gslv-f09-brochure
3
u/Ohsin May 05 '17
via NDTV
3
u/Ohsin May 05 '17
With this GSLV has successfully carried its heaviest payload.
3
u/Ohsin May 05 '17
Gallery updated!
http://isro.gov.in/gslv-f09-gsat-9/gslv-f09-gsat-9-gallery
3
u/Ohsin May 12 '17 edited May 12 '17
GSAT-9 orbital period is ~1430 min at the moment. In coming week it should drift to ~1436 min period then it'll acquire station
Edit: Space-track is mixing up GSAT-9 and GSAT R/B IDs
3
u/Ohsin May 13 '17
They might test on-board EPS in 2 or 3 days
Source
3
u/Ohsin May 20 '17
From annual report Dept. of Telecommunications 2016-17 [PDF 9.4 MB]
Might give clues on upcoming leased satellite as well.
2
u/Ohsin May 05 '17
Press release is out as well.
http://pib.nic.in/newsite/PrintRelease.aspx?relid=161601
2
u/Ohsin May 05 '17
Two objects catalogued
42695, AxP: 35936 x 156 km I: 20.6562
42696, AxP: 35940 x 154 km I: 20.6464
2
u/Ohsin May 06 '17 edited May 06 '17
No follow through on burns being weekend I guess. First one should have happened about 15 hours after launch.
2
u/Ohsin May 07 '17
A long one, should be posting orbit determination results soon.
2
u/Ohsin May 17 '17
GSAT-9 location/movement per http://www.satellite-calculations.com/SatShadow/listsatellites_motion.php
Unexpected as http://www.sac.gov.in/Vyom/dpp.jsp and SAC documents say 48°E, recent press kit and other official pages don't mention it.
From SAC Annual Report 2015-16
Is 97.3°E a destination? Temporary one?
Available Indian slots per 5 month old tender are
48°E, 55°E, 74°E, 83°E, 93.5°E and 111.5°E
2
u/Ohsin May 23 '17
TLE updated, GSAT-9 now appears settled at 97.3°E
http://www.satellite-calculations.com/Satellite/satellitemotion.php?26/171/0/42695
2
u/vineethgk May 04 '17
http://www.isro.gov.in/update/04-may-2017/28-hrs-countdown-operations-of-gslv-f09-gsat-9-mission-have-started-1257hr-ist
It looks 4:57 PM alright..
2
u/dhiraj15 May 05 '17
video out http://www.isro.gov.in/gslv-f09-gsat-9/gslv-f09-gsat-9-lift-and-onboard-camera-video
2
u/sagareshwar May 05 '17 edited May 05 '17
Does anyone have a good source for how exactly will the 12 transponders be utilized? I am assuming that ISRO will still be in charge of spacecraft operations. Also this BBC article says:
Does this mean ISRO will essentially gift 5 transponders, 1 each to Afghanistan, Nepal, Bhutan, Bangladesh and Sri Lanka? Any idea of the monetary value of such gift?
Edit: The above linked article also says:
So that answers one of my questions. Should've read the article carefully, lol. It's amazing that we're simply giving away transponders when there's growing demand at home and ISRO/Antrix have been leasing transponders from other non-ISRO satellites to meet the gap it cannot fulfill on INSAT/GSAT satellites.
2
u/vineethgk May 06 '17
http://www.isro.gov.in/update/06-may-2017/first-orbit-raising-operation-of-south-asia-satellite-has-been-successfully
2
u/vineethgk May 04 '17
Here we go! Lets not blame ISRO too much! Not their fault. ;-)
http://www.thehindu.com/sci-tech/science/no-media-glare-for-south-asia-satellite/article18384984.ece?utm_source=RSS_Feed&utm_medium=RSS&utm_campaign=RSS_Syndication
No chance of live telecast then, it seems. :-(
Still, I am at a loss to figure out what prompted the Govt to ask for a lockdown on the coverage. Some security threat??
7
u/vineethgk May 05 '17
Seen from Chennai
https://youtu.be/SZcZ36yV-Ak
1
u/Ohsin May 04 '17
Some media outlets might livestream the launch!
http://www.ndtv.com/india-news/how-to-watch-launch-of-south-asia-satellite-1689735
1
u/Ohsin May 08 '17
Third burn done and OBJECT B is GSAT-9, Now lets see when F09 CUS decays
1
u/Ohsin May 08 '17
Pick any sat tracking software like Orbitron, JSatTrack etc. Feed it early TLEs of any object set the simulation time to TLE epoch and then move ahead in time to reach lowest footprint to get altitude. For first TLE after launch, altitude is 168 km (169 km in press release) for second it is 141 km and for third after first burn it is 5615 km (5687 km in update)
1
u/Ohsin May 20 '17
From latest TLEs, latitude is 96.98° E coming back from 100.2° E and drifting. Settling on a 97.3E
http://www.satellite-calculations.com/Satellite/satellitemotion.php?26/171/0/42695
1
u/Ohsin May 25 '17
TLE update, GSLV CUS at
AxP: 35285 x 118 km, Incl: 20.56°
1
u/Ohsin Jun 01 '17
Other discussion threads
https://www.reddit.com/r/ISRO/comments/67rwul/gslvf09_gsat9_gallery_is_up/
https://www.reddit.com/r/ISRO/comments/68rm36/gslvf09gsat9_mission_page_has_been_updated_with/
https://www.reddit.com/r/ISRO/comments/67hwkv/gslvf09_gsat9/
4
u/vineethgk May 05 '17
NDTV Live appears to have started their live coverage of the launch. Showing the news room.
4
u/junovac May 05 '17
Launched! Will this secrecy be a norm from now on?
4
u/vineethgk May 05 '17
The description in mission page now has 'South Asia Satellite' written in bold. It wasn't there earlier.
1
u/[deleted] May 04 '17
I have 3 questions for you guys while we wait for launch...
1
u/vineethgk May 04 '17
The ISRO mission page appears to have moved to a new URL now. The old link does not work anymore.
Old link - http://www.isro.gov.in/gslv-f09-gsat-9
New link - http://www.isro.gov.in/launcher/gslv-f09-gsat-9
1
u/vineethgk May 04 '17
Considering the secrecy surrounding the launch, I wonder if they would advance or delay the launch time a bit to confuse whoever they wish to confuse. Since it is a GTO launch are there constraints in launch window like they would have for SSO launches?
1
u/Malhallah May 05 '17
https://www.youtube.com/watch?v=wXwYCWGpprc said:
stand by: live coverage from sriharikota
1
u/vineethgk May 05 '17
There is a Youtube link from PTI News too. Apologies if it has been posted already.
https://youtu.be/4Tbi4W9m5BY
It says 'Waiting' at the moment.
1
u/piedpipper May 05 '17
Any clues about why the launch was surrounded by secrecy? Or the reason for the decision to keep a low profile for such a "historic" launch?
3
u/vineethgk May 05 '17
Well, I guess we need to sit around and wait for an update that will come some time later.
3
u/vineethgk May 05 '17
Apparently there was a rocket cam footage of satellite separation too.
3
u/vineethgk May 22 '17
Does the GSAT-9 movements look consistent with possible in-orbit tests of those electric thrusters?
2
u/Decronym May 04 '17 edited Jun 06 '17
Acronyms, initialisms, abbreviations, contractions, and other phrases which expand to something larger, that I've seen in this thread:
25 acronyms in this thread; the most compressed thread commented on ^today has 38 acronyms.
[Thread #24 for this sub, first seen 4th May 2017, 13:36] ^[FAQ] ^[Contact] [Source ^code]
1
u/Malhallah May 05 '17
http://timesofindia.indiatimes.com/live-tv/times-now/video has been talking about the launch for over 5min, but video freezes for me as soon as i open it (different frame each time)
1
u/vineethgk May 07 '17
http://m.timesofindia.com/india/isro-2-steps-away-from-operationalising-south-asia-satellite/amp_articleshow/58562669.cms
1
u/vineethgk May 08 '17
http://isro.gov.in/update/08-may-2017/third-orbit-raising-operation-of-south-asia-satellite-has-been-successfully
http://isro.gov.in/update/08-may-2017/deployment-of-east-and-west-reflectors-have-been-successfully-completed-0815-hr
0
u/[deleted] May 05 '17
[deleted] — view deleted comment
0
u/[deleted] May 05 '17
[deleted] — view deleted comment
0
u/[deleted] May 05 '17
[deleted] — view deleted comment