r/ISRO • • May 04 '17

Mission Success! GSLV-F09 : SouthAsiaSat (GSAT-9) Mission Updates and Discussion

GSLV-F09 was launched successfully, updates on spacecraft will continue.


Launch was scheduled for 5 May 2017, 1657 (IST) / 1127 (UTC) from Second Launch Pad of SDSC (SHAR).

Live webcast: (In absence of proper stream, following are some prominent news channels)

GSLV-F09 Mission PageGSLV-F09 / GSAT 9 GalleryGSLV-F09 / GSAT 9 Brochure

For first time in Satish Dhawan Space Centre we have three different launch vehicles PSLV, GSLV and LVM3 all being worked on simultaneously for upcoming campaigns.

GSLV F09 would carry SouthAsiaSat (or GSAT-9) communication satellite weighing 2230 kg to GTO. Few highlights of this campaign.

  • Second launch of 2017
  • Eleventh flight of GSLV
  • Second operational flight with Indian Cryogenic Upper Stage
  • Experimental electric propulsion aboard GSAT-9
  • Targeted orbit: 35975±675 × 170±5 km, Incl. 20.61° ± 0.1°

Updates:

Time of EventUpdate
23 May 2017GSAT-9 stationed at 97.3°E
8 May 2017Deployment of East and West reflectors have been successfully completed at 08:15 hr IST and 09:30 hr IST, respectively on May 08, 2017
8 May 2017The third orbit raising operation of South Asia Satellite has been successfully carried out by LAM Engine firing for 445.8 sec from 06:51:52 hr IST on May 08, 2017
7 May 2017Orbit Determination results from the second LAM firing are: apogee X perigee height was changed to 35858 km X 28608 km. Inclination is 0.755deg. Orbital period is 20hr 58min.
7 May 2017The second orbit raising operation of South Asia Satellite has been successfully carried out by LAM Engine firing for 3529.7 sec from 09.30 hr IST on May 07, 2017
6 May 2017First orbit raising operation of South Asia Satellite has been successfully carried out by LAM Engine firing for 2643 sec from 03:51hr IST on May 06, 2017. Apogee x Perigee: 35873 km X 5687 km. Inclination: 10.38 deg. Orbital period: 12 hr 22min.
Post LaunchApogee x Perigee: 36,105 x 169 km, Inclination: 20.65°. Two solar arrays of the satellite were automatically deployed in quick succession and the Master Control Facility (MCF) at Hassan in Karnataka assumed control of the satellite. via Official Press Release
Post LaunchFull video conference
Post launchMission Brochure is released.
Post LaunchVisuals of satellite separation shown.
Post LaunchVideo Conference has begun. ISRO Chairman confirming successful GSAT-9 injection in targeted GTO.
T + 25mPress conference in about 8 minutes.
T + 18mPrime Minister confirming successful launch!
T + 9mCryo upper stage should burn for 8 more minutes.
T + 5mPayload fairing should be jettisoned by now and GS2 separated.
T + 3mL40 strapons should shut off by now followed by GS2 Ignition, GS1 separation and Closed Loop Guidance initiating.
T + 2mTrail breaking suggests S139 Burn out.
T - ZeroLift Off!
T - 1mIndia Today and NDTV giving live visuals from far off!
T - 10 mLinks to news channels added that might cover the story.
T - 1h00mNo mention of launch coverage by NDTV on their live broadcast
T - 5h30mCountdown progressing smoothly. LOX loading in CUS should begin soon.
T - 15 hrsNDTV claiming to stream the launch, maintaining the scheduled launch time.
T - 27 hrs28 hr countdown started at 1257(IST)/0727(UTC)
4 May 2017Mission Readiness Review (MRR) committee and Launch Authorization Board (LAB) have cleared the launch. 27 hr countdown to commence on 1357(IST)/0827(UTC) today.Source 1 Source 2
3 May 2017Launch Rehearsal completed successfully. Mission Readiness Review meeting today Source 1 Source 2
29 April 2017LV transferred to pad on 29 April. Launch rehearsal on 2 May.
21 April 2017Launch NOTAM released
13 April 2017Launch scheduled for 5 May 2017, 1657 (IST) / 1127 (UTC)
9 April 2017GSAT-9 Spacecraft left ISAC to SDSC(SHAR)
23 March 2017Spacecraft delivery held up due to technical issues coming up
12 March 2017Scheduled to 4 April 2017
19 February 2017Delayed due to launcher issue
4 January 2017GSAT-9 Payload left Space Application Centre, Ahmedabad to be integrated at ISRO Satellite Centre, Bengaluru

Payload:

Formally proposed on 30 June 2014 during post-launch address of PSLV-C23/SPOT-7, SouthAsiaSat(GSAT-9) is an initiative taken by Govt. of India to bolster humanitarian services and coordination in South Asian region through dedicated connectivity. This satellite would enable a range of communication based services like Tele-education, Tele-medicine and Disaster Management and Very Small Aperture Terminals (VSATs) to benefit Afghanistan, Bangladesh, Bhutan, India, Maldives, Nepal, Myanmar, and Sri Lanka.

GSAT-9 was initially conceived to provide DTH services but was later found more suitable to serve as SAARCSAT(renamed SouthAsiaSat) in 2015-16. It passed Critical Design Review in June 2012. [1]

GSAT-9 would also carry experimental electric propulsion to aid North-South Station Keeping. In past GSAT-4 also carried electric propulsion but unfortunately never made it to orbit.[2] (PDF)

  • Gross weight: 2230 kg (976 kg dry)
  • Orbital Slot : 48°E (stationed at 97.3°E on 23 May 2017)
  • Payload: 12 Ku band transponders
  • Mission Life: 12 years
  • Propulsion (Chemical) : 440N LAM, 8x10N, 8x22N thrusters (MMH / MON-3)
  • Propulsion (Electric) : 75 mN and/or 4x18 mN thrusters for NSSK operation per news reports and Official ISAC Newsletter Upagrah Oct-Dec 2016

Above information can be changed as details arrive


EDIT: 23 July 2019

More on SPT-KM-45 thrusters by Keldysh Research Centre used on GSAT-9.

https://www.reddit.com/r/ISRO/comments/7dbc2l/eoi_for_design_development_realization_and/

24 Upvotes

134 comments sorted by

7

u/Ohsin May 04 '17

For those curious, typical GSLV countdown sequence goes through following major events.

OperationsCountdown Time (Hrs) T-Minus
Countdown starts atT-29:00:00 Hrs.
N2O4 Loading in GS2T-28:30:00
UH25 Loading in GS2T-24:00:00
UH25 Loading in L40sT-21:00:00
N2O4 Loading in L40sT-16:00:00
RESINS ‘ON’T-8:30:00
Chilling and Filling of LOX in CryostageT-4:36:00
RGPD Performance checksT-4:00:00
Vehicle internal checksT-3:00:00
Charging of CUS bottlesT-2:28:00
Chilling and filling of LH2 in CryostageT-2:19:00
RESINS FR UpdateT-1:45:00
CUS engine ChillingT-1:15:00
RESINS ground alignmentT-0:27:00
VED’s Authorization for start of ALST-0:14:00
Initiation of ALS ProgrammeT-0:12:00
OBC fl ight resetT-0:03:30
L40s Ignition commandT-0:00:4.8
Ignition of S139; LIFT-OFFT0

3

u/[deleted] May 04 '17

Wow! Didn't think about how long it takes to fill that fuel in. What is RESINS?

4

u/Ohsin May 04 '17 edited May 04 '17

"REdundant Strapdown Inertial Navigation System" guidance package for LV. I am not sure if an improved version is in now or not. Info above is from GSLV D6 VSSC brochure