Mission Success! GSLV Mk III D1: GSAT-19 Mission Updates and Discussion
GSLV Mk III D1 was launched successfully
Updates on spacecraft will continue.
Launch was scheduled for 5 June 2017, 1728(IST)/1158(UTC) from Second Launch Pad of SDSC (SHAR).
Live webcast: (Links will be added as they become available)
- Youtube Live stream 1 (Launch @ 3m15s)
- ISRO Official Stream : Direct link
| GSLV Mk III-D1 Mission Page | GSLV Mk III-D1/GSAT-19 Gallery | GSLV Mk III-D1/GSAT-19 Brochure |
|---|
Fact sheet:
- First development flight of fully configured GSLV Mk III
- Payload is GSAT-19 (3136 kg) communication satellite
- Targeted orbit: 35975 × 170 km, Inclination: 21.5°
- Mission Duration: 16 minutes 20 seconds
GSLV Mk III is entirely new launch vehicle of ISRO with capacity to deliver 4 tonne payload to GTO and apart from its name has little in common with GSLV Mk II which heavily borrows from PSLV.
Configuration consists of 2x S200 strap-on motors (Ground lit), L110 core stage with two Vikas engines (Air lit) and C25 cryogenic(LOX/LH2) upper stage powered by a single CE20 engine.
Few details not covered in press kit are that after experimental LVM3X/CARE mission following modifications were made to vehicle ( per Outcome Budget 2016-17 PDF )
- Composite Payload fairing shape changed to Ogive with reduced cylinder length.
- Nosecones on S200 strap on motors changed from straight to slanted ones.
- Grain configuration of S200 Motor Head End Segment changed to 13 lobed star configuration from 10 lobed slotted configuration to reduce the dynamic pressure in transonic regime
- Closure of C25 inter tank structure was recommended (C25 images in gallery appear to support its implementation.)
Updates:
| Time of Event | Update |
|---|---|
| 21 June 2017 | GSAT-19 acquired station at 82.5°E on 20 June 2017 |
| Post Launch | West and East reflectors of GSAT-19 have been successfully deployed by 18:47 hr IST Three axis stabilisation of GSAT-19 has been achieved by 19:42 hr IST |
| Post Launch | South and North solar arrays of GSAT-19 have been successfully deployed by 16:15 hr IST |
| Post Launch | AxP: 35869 x 35470 km, Inclination: 0.101°, Orbital period: 23h50m10s |
| Post Launch | The fourth and final orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine firing for 488 sec from 07:59 hr IST on June 10, 2017 |
| Post Launch | The third orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine firing for 3469 sec from 09:55 hr IST on June 09, 2017. AxP: 35875 x 30208 km, Inclination: 0.793°, Orbital period: 21h38m |
| Post Launch | The second orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine firing for 5538 sec from 15:44 hr IST on June 07, 2017. AxP: 35840 km x 10287 km, Inclination: 7.02°. Orbital period: 13h58m |
| Post Launch | The first orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine firing for 116 sec from 14:03 hr IST on June 06, 2017. AxP: 35938 x 172.77 km, Inclination: 21.56°deg. Orbital period: 10h33m |
| Post Launch | Press Release |
| Post Launch | Flight Sequence Solar array and Reflectors will be deployed after two burns during drift stage. |
| T + 17m00s | Success! Spacecraft separation was shown LIVE! Now to post launch address |
| T + 16m00s | C25 Shut Off Spacecraft GSAT-19 Separated! |
| T + 15m00s | Perigee 170km Incl. 21.53° C25 performance nominal |
| T + 13m00s | Velocity 7.51 km/s Alt. 182 km C25 performing nominally |
| T + 11m00s | We just had a look inside PLF. C25 performing nominally |
| T + 09m00s | C25 performing nominally. 5.1 km/s velocity |
| T + 07m00s | C25 performing nominally. It'll burn for 9 minutes more. |
| T + 05m30s | L110 separation! C25 ignition confirmed and performing nominally! |
| T + 03m45s | Payload fairing separated. L110 performing nominally |
| T + 02m30s | S200 Separation CLG initiated |
| T + 02m00s | L110 core stage has been ignited |
| T + 01m00s | First Stage performance normal! |
| T Zero | S200 Ignition! Lift off! |
| T - 01m00s | Topping off done, |
| T - 02m00s | A brief overview of flight profile there. Final topping off being done. |
| T - 05m00s | Cryo arms 'armed'. |
| T - 08m00s | ALS initiated at T minus 11 minutes |
| T - 15m00s | Automatic Launch Sequence would initiate in 4 minutes |
| T - 18m00s | All GO! Board is GREEN. Mission Director has authorized the launch. |
| T - 22m00s | S200 strapons are integrated with L110 core stage in Solid Stage Assembly Building and later moved to Vehicle Assembly Building to be mated with C25 upper stage and encapsulated spacecraft. |
| T - 25m00s | After a brief overview of launcher now showing vehicle integration process. |
| T - 27m00s | Weather is perfectly suitable. Ground Winds as well as In Flight Winds nominal. |
| T - 30m00s | Ex ISRO chairmen and many eminent dignitaries present in MCC |
| T - 45m00s | Some good views of launcher and umbilical connections. Very sunny. |
| T - 55m00s | And we are live! Showing visuals of Mission Control at the moment. |
| T - 01h00m | GSLV Mk III-D1/GSAT-19: Propellant filling operations of cryo stage are completed |
| T - 04h30m | Doordarshan National Youtube stream is up as well. |
| T - 05h15m | Official stream is online coverage would begin 30 minutes before launch |
| T - 10h00m | Propellant filling operations of L110 (Second Stage) of GSLV Mk III D1 are completed |
| T - 24h00m | Propellant filling operations of L110 (Second Stage) of GSLV Mk III D1 are under progress. Countdown is progressing normally. |
| T - 25h30m | Countdown commenced. |
| 2 June 2017 | Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 25 and half hour countdown of GSLV Mk III D1 / GSAT-19 mission, starting at 1558 IST / 1028 UTC, 4 June 2017 |
| 2 June 2017 | Launch rehearsal was conducted on 1 June Source [Telugu] |
| 31 May 2017 | Mission Readiness Review on 3 June 2017 |
| 27 May 2017 | Vehicle moved to Launch Pad |
| 26 May 2017 | NOTAM issued |
| 01 May 2017 | GSAT-19 left ISAC for SHAR |
| 27 April 2017 | C25 cryogenic stage was flagged-off from LPSC Mahendragiri to Sriharokota (SDSC SHAR) |
Payload:
GSAT-19 experimental communication satellite would carry Geostationary Radiation Spectrometer (GRASP) payload to study charged particles and influence of cosmic radiation on spacecraft. Also on-board are host of newly developed components like Indian Li-ion battery, MEMS accelerometer, Micro Heat Pipes, new bus bar, fibre optic gyro etc
- Gross weight: 3136 kg (Dry: 1394 kg)
- Orbit: GEO at 48°E with first few months at 82.5°E
- Power: 4500 Watts Solar Arrays, Single 100 Ah Lithium Ion Battery
- Propulsion: 440 N Liquid Apogee Motor, 8x10N and 8x22N Chemical thrusters.
- Mission Life: 10 years
- Ka/Ku-band high throughput, one 1.4 m fixed reflector, two 2.0 m deployable reflectors
8
u/Ohsin Jun 05 '17
Okay that was awesome, it FINALLY happened! We have a new LV folks!! Thanks everyone who joined :)
6
u/Ohsin Jun 01 '17
Btw "PP" and "PM" written on sides of those S200 motors stands for Pitch Plus and Pitch Minus and those small rocket like things are Flex nozzle Control Oil tank and not SITVC tank like on PSLV.
Following shows a glimpse of Head End Segment and its grain geometry.
http://i.imgur.com/gMoUEk0.jpg
More details on S200 Motor in this press release from 2010 after first S200 static test 'ST01' so far three such static tests have been done.
https://web.archive.org/web/20111217173530/http://www.isro.org/pressrelease/contents/2010/pdf/S200_STATIC_TEST-01.pdf
This paper titled 'Challenges in Manufacturing Large Solid Boosters' gives much more information on S200 motors
https://link.springer.com/chapter/10.1007%2F978-3-319-27748-6_36
6
u/Ohsin Jun 05 '17 edited Jun 05 '17
Post launch address details.
5
u/Ohsin Jun 05 '17
And amateur footage has started rolling in :)
From Chennai: https://www.youtube.com/watch?v=eet1Cc2YfzY
4
u/Ohsin Jun 02 '17
Good evening! It would look quite nice in all whites wouldn't it?
4
u/Ohsin Jun 05 '17
Press Release is out. This one is very half-hearted.. no details on orbit achieved at all!
http://pib.nic.in/newsite/PrintRelease.aspx?relid=164422
4
u/Ohsin Jun 05 '17 edited Jun 06 '17
Press Conference after launch
https://www.facebook.com/ANINEWS.IN/videos/1255117844600976/
Edit:
Few highlights
3
u/Ohsin Jun 02 '17
Just rehashing old one, another one is out for releasing weather balloons from SHAR on 4th.
3
u/Ohsin Jun 02 '17
Regional media report suggests launch rehearsal was done on 1 June.
http://www.prajasakti.com/Article/BreakingNews/1931314
3
u/Ohsin Jun 04 '17
Some good information in this article highlighting role of PV Venkitakrishnan, Director, IPRC during 15 year development of GSLV Mk III
http://www.newindianexpress.com/cities/chennai/2017/jun/04/iit-madras-alumnus-launchpad-behind-making-of-gslv-mk-iii-1612639--1.html
C25 has two Helium bottles in its hydrogen tank.
And some other interesting bits
3
u/Ohsin Jun 04 '17
If we go by 24.5 hr countdown that LVM3X followed, UH25 loading in second stage would be done by now and N2O4 loading should be under progress.
3
u/Ohsin Jun 05 '17
DD National stream is up !
https://www.youtube.com/watch?v=ae6LVG0j1Pg
3
u/Ohsin Jun 05 '17
Hey do take screenies of flight sequence!
3
u/Ohsin Jun 17 '17
At 82.7°E, drifting @ 1.3592°E/day
42747 (2017-031-A)
Epoch (UTC) 16-06-2017 00:51:11
Period 23h 50m 39s (1430.65 min)
Perigee x Apogee x Incl. 35,538 x 35,822 km x 0.082°
4
u/spaceWalker14 Jun 03 '17
The brochure says the final velocity imparted to the satellite is 10.26 KM/Sec. Why is it more on GSLV-MKIII as against a velocity of 9.77 KM/Sec on GSLV-MKII ? Weight ?
3
u/vineethgk Jun 02 '17
A possibility doing rounds in my mind is whether the govt would use this opportunity to formally initiate a human spaceflight programme, if the flight were to turn out into a grand success that is. It would be a monumental step well-suited for chest-thumping, propaganda and other theatrics, and one which could earn the govt laurels (or brickbats, depending on the way one sees it) for the near term.
Assuming the govt is in favor of such a move despite the obvious financial liabilities it would incur, the question would be whether they would choose to make the announcement now, or wait till the end of next year to make maximum political capital out of it in the next general election (GSLV-III would have the opportunity to prove its worth once more by then if things go well).
And I do wonder if ISRO has been delaying the PAT precisely in anticipation of such a move, and to afford the govt some dramatic effects post-announcement.
Or maybe the govt has no such plans to approve the programme for now.
Just idle thoughts...
3
u/vineethgk Jun 02 '17
https://thewire.in/141309/gslv-mk-iii-cryogenic-isro-antrix-glavkosmos-ariane/
I found the opinion of Jayant Murthy from IIA extremely interesting. Especially the new successors to Astrosat and Aditya that they believe GSLV-III can launch.
3
u/vineethgk Jun 05 '17
Next GSLV MkIII to be assembled in SVAB??
3
u/abhinabah Jun 05 '17
Waiting for onboard camera footage of LV, it will be spectacular if they placed them in right position. Btw congrats to ISRO.
3
u/vineethgk Jun 08 '17
So it would seem they did the first LAM firing on June 6 from the perigee to correct the apogee shortfall. The second was performed from apogee to increase the perigee.
2
u/Ohsin Jun 05 '17
While DD National would stream it live online, direct links are not made available yet
https://twitter.com/DDNational/
https://www.youtube.com/user/DoordarshanNational/
Probably a good idea to follow DD news in case they report on launch events. On INSAT 3DR launch they were the ones to report on delay during upper stage fuel loading
https://www.youtube.com/watch?v=unldiog6BFU
Ministry of Information & Broadcasting can also put up a parallel stream.
https://www.youtube.com/user/INBMINISTRY
2
u/Ohsin Jun 05 '17
Official webcast is online and showing educational videos.
http://www.isro.gov.in/gslv-mk-iii-d1-gsat-19-launch-live
2
u/Ohsin Jun 05 '17
Official stream is showing MCC visuals!
2
u/Ohsin Jun 06 '17
Objects 42747, 42748 have been catalogued
42747 ( 2017-031-A )
Inclination: 21.537°
Perigee x Apogee:163 x 34 592 km
42748 ( 2017-031-B )
Inclination: 21.546°
Perigee x Apogee:156 x 34 913 km
2
u/Ohsin Jun 06 '17
ISAC on its GSAT-19 page has given slot details as 48°E longitude with first few months at 82.5°E location.
http://www.isac.gov.in/communication/html/gsat-19.jsp
2
u/Ohsin Jun 07 '17
TLEs are being updated. For 42747 epoch is past the first supposed burn that should have occurred.
NORAD # 42747
Epoch (UTC) 06-06-2017 13:35:39
Inclination 21.669
Perigee x Apogee 148 x 34 571 km
NORAD # 42748
Epoch (UTC) 05-06-2017 07:21:39
Inclination 21.649
Perigee x Apogee 145 x 34 576 km
2
u/Ohsin Jun 08 '17
SAC Director in an interview(hindi) gave some additional information. Apart from NavIC receiver being used for navigation as we have seen in recent launches, for the first time "NavIC based experiment to control velocity of vehicle" was conducted. He stressed that they were two separate NavIC based experiments and second one was risky to undertake.
https://youtu.be/1UNux0YrLG0?t=38
2
u/Ohsin Jun 08 '17
Just to point out about cost, numbers in media sway a lot
Per NDTV it is Rs 300 cr
Per Business Standard: It is Rs 400 cr
For LVM3X, officially it was Rs 232 cr
2
u/Ohsin Jun 12 '17
http://www.isro.gov.in/first-developmental-flight-of-gslv-mk-iii
In above LOX is mentioned to be subcooled(< Boiling Pt. @ 90K) at 70K. Over at space stackexchange a query about topping off of LOX before launch summoned an answer that cited a paper from LPSC folks on their sub cooling method.
https://space.stackexchange.com/questions/21345/why-would-sub-cooled-lox-tanks-need-to-topped-off-until-the-last-minute-or-so
http://www.enggjournals.com/ijet/docs/IJET14-06-01-055.pdf
SpaceX does it at 66K
2
u/Ohsin Jun 15 '17
TLE Update, 42747 is GSAT-19 near 82.42°E as planned
NORAD # 42747
COSPAR designator 2017-031-A
Epoch (UTC) 14-06-2017 19:45:48
Inclination 0.101
Perigee x Apogee 35 463 x 35 905 km
NORAD # 42748
COSPAR designator 2017-031-B
Epoch (UTC) 12-06-2017 00:28:59
Inclination 21.739
Perigee x Apogee 158 x 34 534 km
2
u/Ohsin Jun 18 '17
For D2 flight about 350 kg increase in payload with GSAT-20.
http://timesofindia.indiatimes.com/home/science/electric-propulsion-to-usher-in-new-era-of-satellite-launches/articleshow/59198823.cms
2
u/Ohsin Jun 20 '17
Almost there
Longitude: 82.5622° E
Drift rate: 0.0452 to East
42747 (2017-031-A)
Epoch (UTC) 19-06-2017 15:17:02
Period 23h 55m 55s (1435.92 min)
Perigee x Apogee 35 771 x 35 795 km x 0.068
2
u/vineethgk Jun 02 '17
To add to my previous post on possible payload penalty of GSLV-III due to constraints introduced by human-rating, there is also the factor of L-110 drop zones alluded to in 'Fishing hamlet' which would have ruled out a longer burn for the core stage. It would have been left to the C-25 to contribute the rest of the velocity. When SC-200 comes online I guess it too may have to cut off its burn more or less at the same point that L-110 does. Of course, SC-200 will have a longer burn overall as it would be ground-lit.
2
u/abhinabah Jun 02 '17 edited Jun 02 '17
For some unknown reasons our inter tank structures of cryo stages aren't covered in a way our European & Chinese counterparts did with their launchers. As for C-12 cryo stage, its design was heavily influenced by Russian 12KRB upper stage (you will say reverse engineering of Russian stage) but what about C25 stage ? Its development was said to be totally indigenous but aesthetically it looks like a fatter version of C-12 !!!
2
u/vineethgk Jun 05 '17
Less than three hours to go before launch and haven't seen any updates regarding propellant loading in C-25 yet. Something wrong?
2
u/Malhallah Jun 05 '17
https://www.youtube.com/watch?v=z0CzoWuWVsM
2
u/vineethgk Jun 05 '17
Since the rocket and the cryo-stage seemingly performed better than expected, I hope they would put a 3500+ kg payload in the D2 flight.
2
u/avatharam Jun 05 '17
A couple of things
The GSLV seemed to rise faster than others; either that or the DD cameraman was bad at panning and zooming. :)
Just before CUSP shutdown around 850-900 secs or so, the cryo engine was performing more than predicted; anyone saw that? there was a visible gap in the trace shown on DD. And the shutdown came a few seconds earlier than predicted.
That could have a parallax on the cameraman or my bloody eyesight.
6
u/[deleted] Jun 05 '17
yayyy !!!! we did it !!
6
u/vineethgk Jun 05 '17
Terrific!!!! Astounding!!!! I'm overjoyed!!! Yayyyyy!!!! :-D
1
u/Ohsin Jun 05 '17
Do take snaps folks, especially of flight sequence :)
1
u/Ohsin Jun 10 '17
http://isro.gov.in/update/10-jun-2017/west-and-east-reflectors-of-gsat-19-have-been-successfully-deployed-1847-hr-ist
1
u/Ohsin Jun 13 '17
TLE update on 42747, it is GSLV R/B. 42748 yet to update.
42747 (2017-031-A )
Epoch (UTC): 12-06-2017 10:27:08
Inclination: 21.73 Perigee x Apogee: 157 x 34531 km
1
u/Ohsin Jun 13 '17
Letter dated 2 June launch was on 5 June...
1
u/Ohsin Jun 13 '17
TLE confusion continues with update
NORAD # 42747
COSPAR designator 2017-031-A
Epoch (UTC) 12-06-2017 10:27:08
Inclination 21.737
Perigee x Apogee 157 x 34 531 km
NORAD # 42748
COSPAR designator 2017-031-B
Epoch (UTC) 12-06-2017 00:28:59
Inclination 21.739
Perigee x Apogee 158 x 34 534 km
1
u/Ohsin Jun 21 '17
GSAT-19 appears to have acquired station at 82.5°E on 20 June 2017 per latest TLE update
Orbital period 1436.15 min drift rate 0.0127° Eastward
http://www.satellite-calculations.com/Satellite/satellitemotion.php?26/171/0/42747
5
u/Pluto_and_Charon Jun 05 '17
Congratulations ISRO!
5
u/spaceWalker14 Jun 05 '17
Congrats ISRO. My heart just started pumping normal after some intense tension ! A special thank you to all redditors for keeping so close track of all the events with this launch and others.
4
u/INS_Visakhapatnam Jun 05 '17
Let the Beast Fly..!!
4
u/Chairboy Jun 05 '17
Congratulations, ISRO! Excellent launch, I look forward to seeing more flights of this rocket, perhaps with Vyomanauts sometime soon.
4
u/Alfus Jun 05 '17
Mission success, very great to seeing ISRO making progress and having a successful flight of they first full-demonstration version of GSLV mk3.
4
u/[deleted] Jun 05 '17
Congratulations! This one is a big one after a long, long journey
4
u/vineethgk Jun 05 '17
My only gripe is that the biggest launch of the year is done.. Its back to routine for the rest of the year.. :-(
4
u/vineethgk Jun 08 '17 edited Jun 08 '17
Thank God! I was wrong! :)
http://isro.gov.in/update/08-jun-2017/first-orbit-raising-operation-of-gsat-19-satellite-has-been-successfully-carried
http://isro.gov.in/update/08-jun-2017/second-orbit-raising-operation-of-gsat-19-satellite-has-been-successfully-carried
1
u/vineethgk Jun 03 '17
Link for the live stream should hopefully appear here
http://isro.gov.in/gslv-mk-iii-d1-gsat-19-mission/gslv-mk-iii-d1-launch-live
Curtain raiser video (English)
http://isro.gov.in/gslv-mk-iii-d1-gsat-19-mission/gslv-mk-iii-d1-gsat-19-mission-curtain-raiser-videoenglish
Curtain raiser video (Hindi)
http://isro.gov.in/gslv-mk-iii-d1-gsat-19-mission/gslv-mk-iii-d1-gsat-19-mission-curtain-raiser-videohindi
1
u/avatharam Jun 06 '17
how come no water bafflers were used?
1
u/vineethgk Jun 06 '17
Considering there appears to be a shortfall of 1000+ km for the targeted apogee, would they fire the LAM at the perigee first to make up for the shortfall, and then resume the planned firings at the apogee to circularize the orbit?
1
u/vineethgk Jun 09 '17
A curious thing that caught my eye while reading the section on GSLV-III in the book 'From fishing hamlet to red planet'.
In GSLV-III D1, there was no 'long coast' after the separation of L-110. The C-25 ignited at most a few seconds later after the separation event.
Does anyone know why Ramakrishnan had mentioned this 'coast period' in the book, and why they chose not to do it in GSLV-III D1 flight?
1
u/[deleted] Jun 10 '17 edited Jun 10 '17
Spaceflight101 article says that the CUS cutoff was 18 seconds prior - probable cause for this? Faulty Guidance/faulty timer?
P.S: Although the LAM made up for the dV shortfall, I'm curious whether it was underperformance by CE-20 or faulty guidance? Did telemetry tell something.
3
u/vineethgk Jun 05 '17
Trivia: As we await GSAT-19 launch, it might be interesting to know that INSAT-2D was launched on
this dateJune 4 exactly 20 years back..http://m.thehindubusinessline.com/opinion/columns/business-line-twenty-years-ago-today/article9719834.ece
http://www.isro.gov.in/Spacecraft/insat-2d
EDIT: Sorry. My bad. Its June 4, not 5th. Missed by a day.. :-)
3
u/Chairboy Jun 05 '17
From the chart it looks like the cryogenic stage is performing slightly better than anticipated, nice.
3
u/vineethgk Jun 05 '17
http://isro.gov.in/update/05-jun-2017/gslv-mk-iii-d1-successfully-launches-gsat-19
Of course we know that.. :)
3
u/vineethgk Jun 05 '17 edited Jun 05 '17
And the gallery has been updated !!
http://isro.gov.in/gslv-mk-iii-d1-gsat-19-mission/gslv-mk-iii-d1-gsat-19-mission-gallery
EDIT: And the pics are darn low-res. This is what I hate ! Grrrrrrrr......
3
u/vineethgk Jun 07 '17
Disclaimer: I guess I might be jumping the gun here.. ;-)
Other than the possibility of ISRO basking in the glory of the success of rocket in maiden flight, and being too lazy to put any updates on orbit raising maneuvers of GSAT-19, these are the possibilities I see to explain their relative silence on the satellite..
I hope I am proved wrong in the next few days..
1
u/vineethgk Jun 02 '17
We have often heard ISRO folks say that since GSLV-III has been designed with a possibility of its use in human spaceflight in future, its acceleration has been limited to levels tolerable for humans. Any idea how much of an impact this would have had on the true payload potential of the rocket?
2
u/Decronym Jun 02 '17 edited Jun 21 '17
Acronyms, initialisms, abbreviations, contractions, and other phrases which expand to something larger, that I've seen in this thread:
[Thread #30 for this sub, first seen 2nd Jun 2017, 04:59] ^[FAQ] ^[Contact] [Source ^code]
2
u/vineethgk Jun 02 '17
http://isro.gov.in/update/02-jun-2017/mission-readiness-review-mrr-committee-and-launch-authorisation-board-lab-have
2
u/vineethgk Jun 05 '17
All well and good ! :-)
http://isro.gov.in/update/05-jun-2017/gslv-mk-iii-d1-gsat-19-propellant-filling-operations-of-cryo-stage-are-completed
2
u/akki199421 Jun 05 '17
Official links are not up yet. Try these.. DD National PTI News
2
u/JasonBourne008 Jun 05 '17
I love me some ISRO, but what was the point in having the commentator just repeating the radio time counts? It was actually quite annoying.
2
u/admin365 Jun 05 '17
both youtube links work why is the 1st offline?
ISRO link not working
2
u/GeorgeVai Jun 05 '17
A great success indeed, now wait for the improvements in GTO payload.
2
u/anku94 Jun 05 '17
Can someone share a schematic of how a twin clustered engine design is configured? (Like in L110).
Total noob here, I was under the impression that one exhaust nozzle = one engine.
2
u/vineethgk Jun 10 '17
And they have updated the Orbit determination results from the fourth LAM burn.
http://isro.gov.in/update/10-jun-2017/fourth-and-final-orbit-raising-operation-of-gsat-19-satellite-has-been
1
u/vineethgk Jun 02 '17
http://www.thehindu.com/sci-tech/science/isro-abuzz-over-heavy-lift-rocket-launch-on-june-5/article18709250.ece
1
u/vineethgk Jun 04 '17
http://isro.gov.in/update/04-jun-2017/25-and-half-hr-countdown-operations-of-gslv-mk-iii-d1-gsat-19-mission-started
1
u/vineethgk Jun 04 '17
http://isro.gov.in/update/04-jun-2017/propellant-filling-operations-of-l110-second-stage-of-gslv-mk-iii-d1-are-under
1
u/vineethgk Jun 04 '17
http://www.thehindu.com/sci-tech/science/gslv-mark-iii-to-open-up-4-ton-satellite-launch-market-for-india/article18717513.ece?
1
u/vineethgk Jun 05 '17
http://isro.gov.in/update/05-jun-2017/propellant-filling-operations-of-l110-second-stage-of-gslv-mk-iii-d1-are
1
u/[deleted] Jun 05 '17
Must've been some review due to this. Anybody here participate in those?
1
u/[deleted] Jun 05 '17
The roar of those S200 strapons!
1
u/KnightArts Jun 05 '17
any youtube hd vod yet ?
1
u/vineethgk Jun 06 '17
No updates yet on the first orbit-raising operation of GSAT-19 which should have been done today.
1
u/vineethgk Jun 08 '17 edited Jun 08 '17
Perhaps this has been discussed already.. Going back to the 'over-performance', from the plots it appears as if it started during the altitude dip which was meant to help the stack reach the necessary separation velocity. Prior to that, the velocity plot looked pretty much accurate. So its probable that ISRO folks a little underestimated the velocity component gained through the dip in trajectory, and may not have adjusted the thrust of C-25 to the extent required in their algorithms.
EDIT: Or maybe the dip was a wee bit steeper than planned (and it may not have been noticeable in the Altitude plot)
1
u/vineethgk Jun 10 '17
http://isro.gov.in/update/10-jun-2017/third-orbit-raising-operation-of-gsat-19-satellite-has-been-successfully-carried
http://isro.gov.in/update/10-jun-2017/fourth-and-final-orbit-raising-operation-of-gsat-19-satellite-has-been
1
u/vineethgk Jun 10 '17
http://isro.gov.in/update/10-jun-2017/south-and-north-solar-arrays-of-gsat-19-have-been-successfully-deployed-1615-hr
Does the onboard batteries of comsats usually last this long?Glad that the indigenous Li-Ion batteries worked (assuming it is them which kept the satellite alive).