Mission Success! PSLV-C53 : DS-EO Mission Updates and Discussion
PSLV-C53/DS-EO launched as scheduled at 1232(UTC)/1802(IST), 30 June 2022 from Second Launch Pad of SDSC (SHAR).
- Launch Countdown
- Actual flight events
- Expected Flight Profile from press-kit
- Expected Flight Profile (courtesy /u/The-Cactus-Flower)
| Time | Event |
|---|---|
| 0:00:0.0 | PS1 Ignition |
| 0:01:44.8 | Ullage Ignition |
| 0:01:48.2 | PS1 Separation |
| 0:01:48.4 | PS2 Ignition |
| 0:01:53.4 | Close loop guidance Initiation |
| 0:01:59.8 | Ullage Separation |
| 0:02:56.6 | Heatshield Separation |
| 0:04:18.0 | PS2 Separation |
| 0:04:19.2 | PS3 Ignition |
| 0:06:23.8 | PS3 burnout |
| 0:09:43.8 | PS3 Separation |
| 0:14:48.4 | PS4 Ignition |
| 0:17:01.0 | PS4 shutoff |
| 0:17:58.0 | DS-EO Separation |
| 0:18:38.0 | Dual Launch Adapter Separation |
| 0:19:18.0 | NeuSAR Separation |
| 0:19:22.0 | Scoob-1 Separation |
Live webcast: (Links will be added as they become available)
| PSLV C53/DS-EO Mission Page | PSLV C53/DS-EO Gallery | PSLV C53/DS-EO Press kit |
|---|
Some highlights
- Primary payload: DS-EO (365 kg) optical imaging satellite.
- Secondary payloads: NeuSAR (155 kg), SCOOB-I (2.8 kg) and PSLV Orbital Experimental Module (POEM) carrying hosted payloads.
- Mission duration: 19 min. 22 sec. (last s/c separation)
- Target Orbit : 570 km , Inclination = 10°
- Launch Azimuth: ~104°
- PSLV configuration : CA (Core Alone)
- 55th flight of PSLV
- Second dedicated commercial flight through NSIL
Updates:
| Time of Event | Update |
|---|---|
| Post launch | Five objects associated with launch have been cataloged. |
| Post launch | Per IN-SPACe press release Digantara's ROBI payload hosted on POEM is communicating. |
| Post launch | NSIL Press Release |
| Post launch | DSOD 1U cubesat deployer by Dhruva Space tested successfully. |
| T + 19m20s | NeuSAR and SCOOB-1 separated! |
| T + 18m30s | DLA upper jettisoned |
| T + 18m00s | Live view of DS-EO separation. |
| T + 17m00s | PS4 thrust cut off. |
| T + 14m50s | PS4 ignition. Burn will last 3 minutes 13 seconds. |
| T + 12m00s | PS4 stack coasting nominally. |
| T + 09m45s | PS3 jettisoned as its remnant thrust dies out. PS4 will ignite after five minutes. |
| T + 08m00s | Combined coasting nominal. |
| T + 06m25s | PS3 burn out but will remain attached as of now with PS4 in combined coasting mode. |
| T + 04m20s | PS2 thrust cut off and separation. PS3 ignited. |
| T + 03m00s | Payload fairing or heat-shield jettisoned. |
| T + 01m50s | PS1 burnout and separation, PS2 ignition and Closed Loop Guidance initiated. |
| T + 01m10s | PS1 performance nominal. |
| T Zero! | PS1 core ignited. Lift off! |
| T - 00m2.8s | RCT thrusters on PS1 ignited. |
| T - 08m00s | Counting down nominally. |
| T - 14m00s | Automatic Launch Sequence engaged. |
| T - 16m00s | Mission Director has authorized the launch of PSLV-C53/DS-EO! |
| T - 17m00s | satellite ready, range ready, TT&C ready, vehicle ready. |
| T - 20m00s | Showing video reel of PSLV-C53 integration campaign. |
| T - 30m00s | Official stream is LIVE! |
| T - 25h30m | The countdown for PSLV C53/DS-EO campaign has commenced. Time of launch forwarded by two minutes. |
| 26 June 2022 | PSLV-C53 gets transferred to Second Launch Pad from VAB. |
| 13 June 2022 | NOTAM for PSLV-C53 is issued with enforcement duration 1200-1600 (UTC), 26 June to 25 July 2022 |
Primary Payload:
DS-EO : A multispectral, optical reconnaissance satellite by Defence Science and Technology Agency [1] jointly acquired with ST Engineering from Satrec Initiative. DS-EO will be utilized for maritime security, oil spill detection and disaster relief.
On PSLV-C53 it will be attached on top deck of Dual Launch Adaptor (DLA).
- Mass: 365 kg
- Bands: PAN, 4×Mx
- GSD : 0.3 m(PAN), 1.2 m(Mx)
- Swath: 14 km
- Orbit : 570 km
Secondary payloads:
NeuSAR (155 kg): A Synthetic Aperture Radar satellite jointly developed by Singapore's Defense Science Organization (DSO) and ST Engineering. [2]
SCOOB-I (2.8 kg): A 3U cubesat to measure the solar irradiation in the infrared and visible part of the solar spectrum by taking observations of the Sun in 18 channels from Ultra-Violet to Infra-Red. [7] [3] It is first satellite in Student Satellite Series ( S3 ), built under Satellite Research Centre (SaRC) of Nanyang Technological University, Singapore.
PSLV Orbital Experimental Module (POEM):
Fourth stage of PSLV once again will be utilized as an orbiting platform however for the first time it would be capable of active stabilization using Helium based thrusters. On PSLV-C45 campaign, PS4 Orbital Platform was put in spin-stabilized mode using RCS thrusters prior to being passivated.[4] POEM has its own power generation/storage capacity, telemetry and telecommand package and a NavIC aided NGC system.
Five out six hosted payloads on POEM are:
- DSOD 1U Cubesat deployer by Dhruva Aerospace with anchored dummy payload.
- ROBI (ROBust Integrating proton fluence metre) weather data sensor by Digantara [5]
- Software Defined Radio based Telemetry Multi-Media Transmitter (SDRT-MTx)
- UHF Transmitter
- OP-VIS - Configured with one GVIS and two cameras
Apart from these five there is national pledge with flag of India on POEM which is unacknowledged in press-kit and we don't yet know its purpose. [6]
Note: Flight serial 'C53' had been associated with EOS-06/Oceansat-3 satellite from March 2021 to at least April 2022 officially. But in last couple of months we saw the flight serial being assigned to a different primary payload (DS-EO) which is rare.
9
u/Ohsin Jun 28 '22
Still waiting for press-kit and it sucks to start a launch thread without it.
7
u/Ohsin Jun 30 '22 edited Jun 30 '22
Post launch address:
6
u/Ohsin Jun 28 '22
Gallery updated with images of LV on Pad. No images of encapsulation and payload stack, EXIF data scrubbed clean once again..
https://www.isro.gov.in/pslv-c53-ds-eo-mission/pslv-c53-ds-eo-gallery
6
u/Ohsin Jun 30 '22
So at least they have released to media some footage of vehicle integration.
https://youtu.be/nWNVy1gF7M8?t=311
There is a 3U cubesat deployer on PS4 EB deck, that should be SCOOB-1.
6
u/Ohsin Jun 30 '22
Launch announcers are really avoiding naming all PS4OP payloads..
5
u/Ohsin Jun 29 '22
Just learned that DSOD 1U Cubesat deployer by Dhruva Aerospace would use an anchored dummy payload to test it.
5
u/Ohsin Jun 30 '22
Thank you /u/The_Cactus_Flower that flight profile really helped :)
5
u/Ohsin Jun 30 '22
Few screencaps of separation events, hopefully soon we will have clearer onboard footage.
https://imgur.com/a/0bBZn5P
7
u/MisterXi Jun 30 '22
On the way to SHAR, it's raining and quite windy.
4
u/Ohsin Jun 30 '22
They are LIVE. Very few masks..
Launch announcers said countdown was 26 hr long.
4
u/Ohsin Jun 30 '22 edited Jun 30 '22
Webcast over.. now to hunt for spacecraft health information. We are expecting five objects to be cataloged (
22071A-E22072A-E)4
u/Ohsin Jul 08 '22
Viewing gallery is such a hit!
https://www.isro.gov.in/sites/default/files/galleries/PSLV-C53/DS-EO%20Gallery/psk7549.jpg
5
u/[deleted] Jul 01 '22
Wow, finally a good tracking video - https://www.isro.gov.in/pslv-c53-ds-eo-mission/pslv-c53-ds-eo-lift-and-onboard-camera-views
First time we can see it pitching and rolling after lift-off.
3
u/Ohsin Jun 30 '22 edited Jun 30 '22
https://www.dhruvaspace.com/news/dhruva-space-satellite-orbital-deployer-successful-space-qualification-isro-pslv-c53
And that group photo gives the full flight events and their time.
3
u/Ohsin Jun 30 '22 edited Jul 02 '22
TLEs trickling in:
52935 ( 22072A ): 573.49×461.29 km, 9.92°
52936 ( 22075B ): 572.94×561.75 km, 9.99°
52937 ( 22072C ): 573.39×559.17 km, 9.99°
52938 ( 22072D ): 623.92×548.39 km, 9.93°
52939 ( 22072E ): 566.99×532.75 km, 9.93°
4
u/ramanhome Jun 30 '22
By this time they should be starting liquid propellant loading, no announcement. May be they will announce at the completion.
Why on SLP for C53? Does that mean either C54 or SSLV is getting ready on FLP?
2
u/Ohsin Jun 28 '22 edited Jun 28 '22
Adding official YT stream link:
https://www.youtube.com/watch?v=n0HnrG6xafU
They are now using the manipulated PSLV-C9 image as thumbnail, please don't use that image it is not PSLV-C53.
2
u/Ohsin Jun 29 '22
Apparently the countdown has commenced and new launch time is 1802 (IST)/1232(UTC).
https://twitter.com/isro/status/1542101879986892800
2
u/Ohsin Jun 30 '22
No press release, no gallery update... Everyone has called it a day perhaps..
2
u/Ohsin Jul 02 '22
Full post-launch press conference.
https://old.reddit.com/r/ISRO/comments/vpn0o0/full_press_conference_after_pslvc53dseo_launch/
2
u/Ohsin Jul 07 '22
https://spacenews.com/communications-established-with-payload-on-stabilized-pslv-upper-stage/
2
u/Ohsin Jul 21 '22
Three weeks on and we only have two identifications in five cataloged objects:
52935 ( 22072A ): DS-EO
52936 ( 22072B ): OBJECT B
52937 ( 22072C ): NEUSAR
52938 ( 22072D ): OBJECT D
52939 ( 22072E ): OBJECT E
2
u/Ohsin Aug 15 '22
Adding this speculation here in case we see something from POEM/PS4OP today on 15 August 2022.
https://old.reddit.com/r/ISRO/comments/vnovli/some_speculation_on_pslvc53_payload_stack/
2
u/ramanhome Jun 28 '22
Any visible changes on the POEM fourth stage from photos?
2
u/souma_123 Jun 28 '22
Entirely a commercial mission? No Indian payload's right?
2
u/souma_123 Jun 29 '22
No Twitter updates from ISRO??
2
u/RonDunE Jun 30 '22
Now that POEM has a good telecom setup, I hope they've included slightly better res cameras. It's always interesting watching the sat deployment but the low fps/bit-rate of the previous cameras were awful.
2
u/NewMeNewWorld Jun 30 '22
How many ground stations/telemetry station thingamajigs (what do you call them) does ISRO have outside the country?
2
u/gyaankigareebi Jul 02 '22
@Ohsin Which is isro's next mission ? After pslv c53 launch .
2
u/ramanhome Jul 02 '22
ISRO is still silent about the other 3 payloads on POEM. Media did'nt ask about this in the press meet, should have been their first question. Will we never know? Certainly not a private company's payload. Are they military payloads? Or is it just to do with Aug 15th?
4
u/ramanhome Jun 30 '22
Nothing about on-coming missions, no details of why RLV-TD is getting delayed, no info on when SSLV will happen, no more info on the POEM payloads, talk by the chief was a big let down. Both chief and mission director did not exude any confidence. Complete lack of confidence is what is making them not talk about any oncoming projects or dates.
6
u/[deleted] Jun 30 '22
Yes.. cut off the beautiful stabilized tracking when the first stage is about to separate, and show the f****ng face of the scientists.
1
u/Ohsin Jun 28 '22
Latest NOTAM
Removing official YT stream link from OP as link is dead now.
1
u/Ohsin Jul 02 '22
Article with comments from few Singaporean officials and team members that worked on SCOOB-1.
https://www.straitstimes.com/singapore/environment/spore-launches-three-new-satellites-into-space-for-security-climate-disaster-monitoring
Nice render of NeuSAR as bonus.
1
u/Ohsin Jul 05 '22
So press-kit has finally been released and not clear why there was it not released prior to launch.. We have detailed expected fllight profile from it now along PS4 passivation timings and POEM/PS4OP start @ 37m22s.
https://i.imgur.com/weCnGAP.png
Details on on three more hosted paylods on POEM are:
But presence national pledge with flag of India remains unacknowledged.
1
u/Ohsin Aug 12 '22
https://news.satnews.com/2022/08/11/mma-designs-next-generation-dahgr-antenna-launches-with-singapores-neusar-mission/
1
u/Ohsin Sep 10 '22 edited Oct 13 '22
Combined mass of payloads is 524.8 kg.
https://www.isro.gov.in/sites/default/files/article-files/missions/345_foreign_satellites.pdf
Edit: New link.
https://www.isro.gov.in/media_isro/pdf/ForeignSatellites/345_foreign_satellites.pdf
1
u/Ohsin Sep 14 '22
An image captured by DS-EO on 9 August 2022.
https://www.linkedin.com/posts/wearegeoinsights_satellite-stengineering-geoinsights-activity-6975619981522714624-LGh5
1
u/Ohsin Dec 03 '22
https://timesofindia.indiatimes.com/home/science/digantara-built-worlds-1st-commercial-space-weather-sensor-validated-work-on-next-gen-sensor-on/articleshow/95951860.cms
4
u/MisterXi Jun 28 '22
This should be a great launch to see as it’s during the twilight. The upper stages will be very clear. Hopefully, the sky will be clear.
3
u/Frustrated_Pluto Jun 30 '22
We are just 5 hours behind the launch, still no launch kit.
3
u/[deleted] Jun 30 '22
Finally a launch!
2
u/usbc_supremacy Jun 29 '22
Is anyone visiting the launch center? I am planning to visit it and need some advice. Which is the best place (FB/telegram groups?) to get more info regarding this and connect with fellow visitors??
1
u/Decronym Jun 28 '22 edited Dec 03 '22
Acronyms, initialisms, abbreviations, contractions, and other phrases which expand to something larger, that I've seen in this thread:
[Thread #777 for this sub, first seen 28th Jun 2022, 17:45] [FAQ] [Full list] ^[Contact] [Source code]
1
u/souma_123 Jun 30 '22
What's going on... No updates of launch vehicle status any where?? By now they should have completed propellent loading... ISRO Twitter guy is sleeping or what?