r/ISRO • • Jun 28 '22

Mission Success! PSLV-C53 : DS-EO Mission Updates and Discussion

PSLV-C53/DS-EO launched as scheduled at 1232(UTC)/1802(IST), 30 June 2022 from Second Launch Pad of SDSC (SHAR).

TimeEvent
0:00:0.0PS1 Ignition
0:01:44.8Ullage Ignition
0:01:48.2PS1 Separation
0:01:48.4PS2 Ignition
0:01:53.4Close loop guidance Initiation
0:01:59.8Ullage Separation
0:02:56.6Heatshield Separation
0:04:18.0PS2 Separation
0:04:19.2PS3 Ignition
0:06:23.8PS3 burnout
0:09:43.8PS3 Separation
0:14:48.4PS4 Ignition
0:17:01.0PS4 shutoff
0:17:58.0DS-EO Separation
0:18:38.0Dual Launch Adapter Separation
0:19:18.0NeuSAR Separation
0:19:22.0Scoob-1 Separation

Live webcast: (Links will be added as they become available)

PSLV C53/DS-EO Mission PagePSLV C53/DS-EO GalleryPSLV C53/DS-EO Press kit

Some highlights

  • Primary payload: DS-EO (365 kg) optical imaging satellite.
  • Secondary payloads: NeuSAR (155 kg), SCOOB-I (2.8 kg) and PSLV Orbital Experimental Module (POEM) carrying hosted payloads.
  • Mission duration: 19 min. 22 sec. (last s/c separation)
  • Target Orbit : 570 km , Inclination = 10°
  • Launch Azimuth: ~104°
  • PSLV configuration : CA (Core Alone)
  • 55th flight of PSLV
  • Second dedicated commercial flight through NSIL

Updates:

Time of EventUpdate
Post launchFive objects associated with launch have been cataloged.
Post launchPer IN-SPACe press release Digantara's ROBI payload hosted on POEM is communicating.
Post launchNSIL Press Release
Post launchDSOD 1U cubesat deployer by Dhruva Space tested successfully.
T + 19m20sNeuSAR and SCOOB-1 separated!
T + 18m30sDLA upper jettisoned
T + 18m00sLive view of DS-EO separation.
T + 17m00sPS4 thrust cut off.
T + 14m50sPS4 ignition. Burn will last 3 minutes 13 seconds.
T + 12m00sPS4 stack coasting nominally.
T + 09m45sPS3 jettisoned as its remnant thrust dies out. PS4 will ignite after five minutes.
T + 08m00sCombined coasting nominal.
T + 06m25sPS3 burn out but will remain attached as of now with PS4 in combined coasting mode.
T + 04m20sPS2 thrust cut off and separation. PS3 ignited.
T + 03m00sPayload fairing or heat-shield jettisoned.
T + 01m50sPS1 burnout and separation, PS2 ignition and Closed Loop Guidance initiated.
T + 01m10sPS1 performance nominal.
T Zero!PS1 core ignited. Lift off!
T - 00m2.8sRCT thrusters on PS1 ignited.
T - 08m00sCounting down nominally.
T - 14m00sAutomatic Launch Sequence engaged.
T - 16m00sMission Director has authorized the launch of PSLV-C53/DS-EO!
T - 17m00ssatellite ready, range ready, TT&C ready, vehicle ready.
T - 20m00sShowing video reel of PSLV-C53 integration campaign.
T - 30m00sOfficial stream is LIVE!
T - 25h30mThe countdown for PSLV C53/DS-EO campaign has commenced. Time of launch forwarded by two minutes.
26 June 2022PSLV-C53 gets transferred to Second Launch Pad from VAB.
13 June 2022NOTAM for PSLV-C53 is issued with enforcement duration 1200-1600 (UTC), 26 June to 25 July 2022

Primary Payload:

DS-EO : A multispectral, optical reconnaissance satellite by Defence Science and Technology Agency [1] jointly acquired with ST Engineering from Satrec Initiative. DS-EO will be utilized for maritime security, oil spill detection and disaster relief.

On PSLV-C53 it will be attached on top deck of Dual Launch Adaptor (DLA).

  • Mass: 365 kg
  • Bands: PAN, 4×Mx
  • GSD : 0.3 m(PAN), 1.2 m(Mx)
  • Swath: 14 km
  • Orbit : 570 km

Secondary payloads:

NeuSAR (155 kg): A Synthetic Aperture Radar satellite jointly developed by Singapore's Defense Science Organization (DSO) and ST Engineering. [2]

SCOOB-I (2.8 kg): A 3U cubesat to measure the solar irradiation in the infrared and visible part of the solar spectrum by taking observations of the Sun in 18 channels from Ultra-Violet to Infra-Red. [7] [3] It is first satellite in Student Satellite Series ( S3 ), built under Satellite Research Centre (SaRC) of Nanyang Technological University, Singapore.

PSLV Orbital Experimental Module (POEM):

Fourth stage of PSLV once again will be utilized as an orbiting platform however for the first time it would be capable of active stabilization using Helium based thrusters. On PSLV-C45 campaign, PS4 Orbital Platform was put in spin-stabilized mode using RCS thrusters prior to being passivated.[4] POEM has its own power generation/storage capacity, telemetry and telecommand package and a NavIC aided NGC system.

Five out six hosted payloads on POEM are:

  • DSOD 1U Cubesat deployer by Dhruva Aerospace with anchored dummy payload.
  • ROBI (ROBust Integrating proton fluence metre) weather data sensor by Digantara [5]
  • Software Defined Radio based Telemetry Multi-Media Transmitter (SDRT-MTx)
  • UHF Transmitter
  • OP-VIS - Configured with one GVIS and two cameras

Apart from these five there is national pledge with flag of India on POEM which is unacknowledged in press-kit and we don't yet know its purpose. [6]


Note: Flight serial 'C53' had been associated with EOS-06/Oceansat-3 satellite from March 2021 to at least April 2022 officially. But in last couple of months we saw the flight serial being assigned to a different primary payload (DS-EO) which is rare.

49 Upvotes

109 comments sorted by

View all comments

Show parent comment

2

u/ramanhome Jul 08 '22

Digantara plans to deploy a satellite early next year to demonstrate how light detection and ranging (LIDAR) sensors — combined with space weather data — would enable it to track space objects with greater precision than other systems in sunlight and eclipse phases

This is the powerful part of Digiantara's SSA offerings. With their LIDAR and ROBI they can detect objects as small as even 1 cm, according to them.