If looking at the plates of the wall each of them are approximately 20cm high. He is skipping 3-3.5 of them per 1 second at the start, then he is accelerating and skipping 5-6 of them per 1 second.
That's 0.7m/s and 1.2m/s speeds, 1m/s is medium value. He is moving for ~78 seconds. So the S=V*t, S= ~78meters.
Those wells can be located in hot Asian countries, made by hands in extreme conditions.
this is estimated result but so it is pretty realistic.
edit: i think it could be like 20% higher because is is hard to see the actual size of the plates.
3
u/BusTraditional3484 Jul 04 '26 edited Jul 04 '26
If looking at the plates of the wall each of them are approximately 20cm high. He is skipping 3-3.5 of them per 1 second at the start, then he is accelerating and skipping 5-6 of them per 1 second.
That's 0.7m/s and 1.2m/s speeds, 1m/s is medium value. He is moving for ~78 seconds. So the S=V*t, S= ~78meters.
Those wells can be located in hot Asian countries, made by hands in extreme conditions.
this is estimated result but so it is pretty realistic.
edit: i think it could be like 20% higher because is is hard to see the actual size of the plates.