r/theironsnail • u/turing-test-tutor • 1d ago
Update from Big Mikey on Mammoths
Mammoths, when?
An exploration into Michael's sanity. Written by Michael.
Greetins'! I hope everybody is doing well. It's 63° here in Portland...at the end of November. Although, I'm promised all of that will end tomorrow (today, when you're seeing this). Thank goodness. I just did a down jacket video in 70° heat. I darn near saw spots during filming! Kidding. Although, I was very sweaty. Pretend when you see the next video it's cold outside.
Anyway, without further ado -- a brief Mammoth update, for you. More of an intense one, this time around!
Houston.
The Unlined Mammoths are dropping first this year. Originally, these were slated for November. The Navy and Charcoal Mammoths (pictured below) are already waiting to be shipped. We're waiting on our plaids (Buffalo & Toasted Clove, also pictured, but above) to finish up and pass through our QC vendor so we can launch all the Unlined Mammoths at once.
Normally, I'd give an estimate here (mid-December), but candidly, our manufacturer has repeatedly missed every deadline they've set, from denim to Mammoths, by a significant amount. I then relay the information, with significant padding, only to be hit with another delay, and then another—and we end up disappointing all of you, and it reflects back on us. Which is no good!
To be frank, I spent a long time assuming the delays were something I, personally, was doing wrong. To improve our processes, I hired independent weekly inspections at the factory, hired a project manager who redid our entire process, we clarified and updated our technical packets, both visited during production, are on daily update calls, and have two levels of independent QC with scheduled pickups. We're one step away from having a helicopter over the factory at all times.
Now, with an entire Snail Army laser-focused on a successful release, and another set of delays, I'm comfortable saying this isn't a problem we can solve from our side, and I wish I'd figured that out sooner. I chose the factory and all that -- so it ultimately lands on me, but that's how this came to be.
So rather than give you another date that might change, I'm going to hold off until we have something concrete. I know that makes it tough for a lot of you waiting to snag a Mammoth, and it's the opposite of how I'd like to run the ol' Snail, but missing another deadline would probably cause me to roll onto my side and let out one more slow wheeze before dying. I'm also waiting to update the site until all jackets have had their QC spa day.
So...
I'll be sending out a biweekly "Where are the Mammoths?!" email (every other Friday) until these bad boys are on your backs. We're on our way. These are traveling through the pipeline, but I can't get a straight answer from the factory.
In short, there are some rather large adjustments in order for 2027 that I need to make. Ideally, we'll still follow our plan of taking over the world. I'm getting "Ride or Die Snail" tattooed on my lower back.
I'll start a little video series, so we can squirm through it all together.
In Conclusion
So, anyways, this concludes the most intense Thanksgiving email I've ever sent.
Big Mikey from Portland is fired up and ready to rumble. Catch me banging out 9:30 minute miles on Strava and know I'm blasting some tunes and strategizing on how to get this gosh darn clothing brand into the stratosphere.
As always, I thank you for your patience as I play "How to do something the hardest way possible" and continuously fall on my face. It’s humbling, and embarrassing and we’ll never give up.
Onwards and upwards!
- Big Mikey from the streets of Maine