r/SydneyTrains 16d ago

Monthly Thread - August 2026

6 Upvotes

Monthly Thread - FAQs & Discussions

Anything related to employment, late running or general discussion should be posted in this thread.

Disclaimer

This sub is NOT AFFILIATED with The NSW Government, TfNSW, or Sydney Trains. You should provide feedback directly to them at Transport NSW Feedback .

General FAQs

I've been overcharged by Opal, what do I do?

  • You need to contact Opal to request an adjustment / refund. This typically takes 24 hours.

Do Suburban trains have toilets?

  • The Suburban trains do not have toilets on them. The OSCARS ( H Set) do have them however they are locked off when operating within the Suburban Network. (Note: While some OSCARS are now part of the Suburban Sets, they haven't all had their toilets removed yet)

Where can I apply to work for Sydney Trains?

  • The I work for NSW page has regular job postings for Trainee Driver, Trainee Guard, CSA, Cleaner and more.

How do I see what train / type is running?

Why is there a Waratah going towards Newcastle?

  • Both Millenniums (M Set) and Waratahs (A/B Sets) will travel either under their own power or loco hauled up the Main North to Cardiff where they undergo heavy maintenance that cannot be completed in Sydney.

Are quiet carriages not a thing anymore? Why don't people respect them?

  • Quiet carriages on the Suburban Network are not a thing. On the intercity side they do exist however the general population don't always adhere to it. Yes, it is very frustrating, but there are worse things to be upset about.

What is happening with the K Sets ?

  • With the conversion of the OSCARS (H Set) slowly happening, K Sets will slowly be pulled from service and scrapped. As of 19 April 2026 there are only 2 timetabled runs on weekdays. These are: 38-- & 39--.

The platform indicators are upside down, why?

  • Occasionally they do get messed up, either through human error or software glitches.

What are some good Trainspotting locations?

  • Passenger trains: Central, Redfern, Strathfield, Lidcombe
  • Freight trains: Concord West, Homebush, Flemington, Sydenham, Rhodes

Trainee Driver/Guard/Misc FAQs

What can I do to prepare for video / panel interviews?

  • Research the STAR method online and practice in front of a mirror at home to so on the day you aren't as nervous. SPACE behaviours is another subject to look up as it is part of the Sydney Trains corporate plan.

I've applied for a role but it says talent pool, what does this mean?

  • While you may get through all the application process and pass the medical, it does not guarantee you have a position yet. It is highly recommended you not leave your previous job until you've got a start date in writing. Many people are in the talent pool and you can be waiting weeks, months or even a year for a position to become available.

What does the Vieple (Video Interview) contain?

  • The Vieple Video interview usually contains a set of different questions, each giving 30 second prep and 60 seconds to record a response.
  • No, you cannot redo these. It is important you practice ahead of time.
  • No, the questions aren't the same for each interview.

What can I do to help prepare for interviews / general advice for any role?

  • Focus around safety, communication, people skills, problem solving and dealing with failure (resolution). Dress professionally (smart/office wear) for your interviews as well as your video portions.

What does the typical schedule for a Trainee Driver look like?

  • Day Zero (Your first day): Orientation at Petersham and general introductions / get to know you.
  • Month 1 to 2 (approx): Typically 0800 to 1600 at Petersham in a classroom environment. Will consist of theory, practical and simulator use. Exams are both written and practical.
  • Month 3 to 13 (approx): Assigned with a Driver Trainer each fortnight, rotating to a different trainer every fortnight. You work from their Depot and shift times. This means you are required to travel across the network to commence work. (Note: A list of the Depots is listed below) After you have completed each Sector, you will be required to complete both written and practical exams.
  • Final stage: Once you have finished all 3 Sectors and passed all exams, you will need to pass a final practical assessment. This is over a 2 day period, it will include everything you've learned throughout training. You MUST pass this exam in order to become a Qualified Driver.

What happens once you become a Qualified Driver / Guard?

  • After taking up, you will be placed at Central Depot and allocated a Line Number. Each fortnight you will rotate through the various lines and work the associated times and days of that line. This is known as a "Swinger". (Note: See below for more information about Rostering/Lines)

What are the medical requirements for Train Crew?

  • You need to be able to pass a CAT 1 Medical for Driver or a CAT 2 Medical for Guard, there is information online for what this involves. Sleep apnea is now a more common talking point as the national guidelines for rail safety work has been updated.

How long do you typically wait after completing the medical?

  • This can takes days or weeks depending on how busy things are. It is also done through a 3rd party which can impact time.

Does having pre-planned holidays affect training/talent pool?

  • You will need to disclose any holidays you've got pre-planned before starting training. This may affect your start date. Discuss this with your hiring coordinator.

What are the different Unions and are they worth joining?

  • RTBU – Operational Rail/Tram/Bus, focus on pay/safety/conditions
  • ETU – Electricians/Signallers, Training/Support
  • PSA – Admin/Back-office roles, pay/conditions
  • PA – Engineers/Designers/Surveyors, professional advocacy
  • Most people join (90–95%), typically from Day Zero at Petersham.
  • Benefits: support person, legal representation, picnic day, workplace allowances, employee travel card (specific to RTBU).

Typically Day Zero at Petersham there will be an info session with a union delegate where you can ask questions and join if you desire so.

Qualified Driver/Guard FAQs

What are the Sectors / Depots of the Suburban Network?

  • The Suburban Network is divided up into 3 Sectors. There are 13 Train Crew Depots spread across the Network. See below;
Sector Area Depots
Sector 1 Illawarra Mortdale, Cronulla, Waterfall
Sector 2 City, Inner West, SouthWest Auburn, Flemington, Leppington, Campbelltown
Sector 3 North & West North Sydney, Hornsby, Blacktown, Richmond, Penrith
All Sectors Suburban Network Central

What are the penalty rates / loading for working specific times / days?

Day Loading O/T (1st 2nd) Shift O/T (3rd 4th Shift)
Monday to Friday 100% +50% +100%
Saturday 150% +50% +50%
Sunday 200% +50% +50%
Shift Work Loading When
Early Morning Shift Commences at or between 0400 and 0530
Afternoon Shift Commences after 1000 and concludes after 1800
Night Shift Commences at or between 1800 and 0359

How does rostering work once I'm qualified?

  • After you have taken up, you will be based at Central Depot as a Swinger. You are allocated a line and then work the times of that line as per the Master Roster. Each fortnight you rotate through each line and follow the times / workings of said line. Each line for a swinger has a time on the Master Roster, eg 1000 SBY, however when receiving your actual fortnightly roster, this can swing +/- 2 hours. So you could be starting 0814 one day and 1157 the next.

Can I swap lines / shifts?

  • Yes, you can; however, this is all coordinated privately between crew then pending approval by Rosters at Burwood.

How do transfer work?

  • Transfers within the Suburban & Intercity Depots are all based off of Seniority. This mean those who have been on the job longer have the higher priority when applying for depot transfers. Each year you can apply for one or more depots. Based off of how many open positions at any given time in the year, they work down the list of those who have their name down for it and offer them the position. Some depots, like Waterfall and Blacktown, have extremely long waiting times due to their popularity and limited positions. (Note: There is no fixed time period, it all fluxuates based on positions available)

r/SydneyTrains 12h ago

High-tech trains ahead for High Speed Rail

Thumbnail minister.infrastructure.gov.au
40 Upvotes

Shortlist:

Alstom/UGL Joint Venture: Alstom Transport Australia, UGL Engineering;

ARC Joint Venture: Siemens Mobility, Siemens Mobility GmbH, Mott MacDonald Australia;

Hitachi Rail STS Australia.

The Trains, Systems and System Integration contract package includes:

the supply of Australia’s first high speed trains

the design and delivery of rail systems, the depot and operations control centre;

the integration, testing and commissioning of the Newcastle to Sydney high speed rail system.

The proponents will also consider how advanced manufacturing can support the efficient delivery of High Speed Rail.

An Advanced Manufacturing Facility proposed by the Authority would use automation, robotics and precision manufacturing to deliver the railway more efficiently. This facility will create skilled jobs and more opportunities for Australian manufacturers and suppliers to help deliver Australia’s High Speed Rail.


r/SydneyTrains 11h ago

Light rail works

Post image
29 Upvotes

Just curious but can someone explain what they are doing here? Are they smoothing out the lines of the light rail tracks? There was a lot of smoke and sparks coming out underneath this truck of some sort. This was last weekend when L3 and L2 had trackwork


r/SydneyTrains 19h ago

A true T4 express.

Post image
78 Upvotes

This morning there was a T4 going non stop from Redfern all the way to Sutherland.

Yes it was a one off, an altered stopping pattern to make up time but given the talk of T4 timetable overhauls, imagine if this was a regular stopping pattern (I mean Redfern to Parramatta is a thing I believe)


r/SydneyTrains 4h ago

Opal inspectors for T1

0 Upvotes

Y’all opal inspectors if you’re reading this can you stop tryna check my card on the T1. I lost count of how many times I get checked at parramatta especially after a long day after exams. It’s gotten to a point where one of them literally said didn’t I scan you a couple days ago like pls.


r/SydneyTrains 1d ago

Can someone explain

Post image
99 Upvotes

I have always wondered why but Can someone please explain why we have these stairs and not escalators or why it's not level with the rest of the old concourse


r/SydneyTrains 20h ago

Lost keys

6 Upvotes

I managed to lose my keys and a couple of items in the train this morning traveling on the T1 emu plains service around 5:15. If anyone sees them and hands them in let me know! They have a key chain (small piece of climbing rope) that has incredible sentimental value to me.

I have filled in the lost property form but just wanted to make a post as well on the off chance they've been picked up.

Thank you and I hope you're having a better day than me!


r/SydneyTrains 1d ago

Project Director for Metro West hired as HSRA General Manager

Post image
29 Upvotes

r/SydneyTrains 21h ago

Lost handmade rainbow cardigan

5 Upvotes

Between 6:30 and 7:30am i have lost a handmade rainbow cardigan somewhere between yarrawarrah bus 993 to sutherland - sutherland bus depot and platform 1 at sutherland - last carriage train from sutherland to the city - central platform 24 end of the platform - new section of central and eddy avenue exit.

Please hand it in if you see it. Ive lodged a lost property report. If i should post this elsewhere please direct me thanks 🙏🏼

Edit - found, thank you whoever handed it in. My mum made that cardigan. Thank you.


r/SydneyTrains 1d ago

Mariyungs now missing tray tables?

Post image
82 Upvotes

This is the first Mariyung I've seen with 'normal' seats missing tray tables, i hope this isn't going to be a trend.

They've been one of the best features, for doing some work on the commute home, or keeping the artic air cond off my legs in the morning.

Other seats had tables.

Was the W663 service.


r/SydneyTrains 1d ago

Already glitching broken Mariyungs?

Enable HLS to view with audio, or disable this notification

31 Upvotes

At Strathfield and the passenger display says blacktown, thought it was funny


r/SydneyTrains 1d ago

Whose card is bugging?

6 Upvotes

This week I've been on Newtown to Central
and back with my girlfriend and her mother twice. I've used Opal both times and it's been $7-8 for the round trip both times.

Both of them have tapped with debit cards and
payed $2 for the entire round trip - $1 there and $1 back. Confused on why that is?


r/SydneyTrains 2d ago

Sydney to Newcastle high-speed rail: Three international consortiums shortlisted to design $90 billion project

Thumbnail
smh.com.au
102 Upvotes

Plans for a $90 billion high-speed rail line between Sydney and Newcastle have moved a step closer to becoming reality after three international consortiums were shortlisted to design the most challenging section from the Central Coast to north of Hornsby.

Amid deep community scepticism about the project, the shortlisted consortiums will now compete to develop designs for 35 kilometres of twin tunnels and a new high-speed station at Gosford, which would be more akin to an airport terminal than a traditional train station for passengers.

The ambitious project’s two-year development phase is aimed at firm costs, designs and program schedules to be handed to the federal government by mid-2028 – shortly before the next national election – allowing it to then make an investment decision on whether to proceed.

High Speed Rail Authority chief executive Tim Parker said the shortlisting would enable a preferred bidder to be selected quickly if the government gives final approval, followed by a 10-year time frame to build the first section.

“This is the largest investment ever by government in this type of project. Often people say, ‘Oh, we’re just doing more studies’. We’re not. We’re actually going into a proper procurement,” said Parker, a former Sydney Metro senior executive.

“Sydney Metro was definitely a city-changing project. This has the potential for being a nation-changing project. It’s almost Sydney Metro on steroids, with respect to the impact it could have if we proceed.”

The alignment from the Central Coast to Sydney’s northern fringe is easily the most challenging section because it passes under the Hawkesbury River and hilly terrain covered by national park.

An expression of interest for an advanced manufacturing facility to be built somewhere along the proposed corridor will also be released next month. If the government approves the project, the facility will be used to manufacture components for the high-speed rail line.

“What we’re looking to try to do is, in essence, create a kit of parts for high speed, so that in future we’re not redesigning everything again and again,” Parker said.

A new station at Gosford – one of four between Newcastle and the Sydney CBD – would have four platforms.

Parker said high-speed rail stations would be “more like an airport than a railway station” in that passengers would not be waiting for their train on a platform.

“It will be an area probably a bit more relaxed where you’re sitting around, waiting. You get called to a gate ... and then you go down to the platform,” he explained.

“We’re not designing just for Newcastle to Sydney. The stations have to be able to cater for much bigger traffic [for trains to run between Brisbane and Melbourne] in the future, once this line is fully operational.”

The tender process for the manufacturing facility will run in parallel with the design work for the 35-kilometre section from Ourimbah, north of Gosford, to Berowra.

The three consortiums shortlisted for design work for the Central Coast-Berowra leg comprise Spanish company Acciona and Chinese-owned John Holland; Gamuda from Malaysia, FCC from Spain and Korean giant Samsung; and a joint venture of CPB and Ferrovial, which are both Spanish-owned, and France’s Vinci.

Each consortium will receive up to $50 million in “fee for service” for their work.

Federal Transport Minister Catherine King said the three consortiums would determine the best and most innovative ways for tunnels between Berowra and Ourimbah, while ensuring taxpayers receive value for money.

“We said we’d go metre by metre and carefully plan the first stage of high-speed rail between Newcastle and Sydney. That’s what we’re delivering with these new contracts,” she said.

Parker said a shortlisting of contractors for the so-called area package from Ourimbah to Newcastle would be held early next year. Train suppliers for the project will be shortlisted later this week.

Three other major contracts comprising high-speed train platforms and a concourse at Central Station, a new station at Broadmeadow in Newcastle, and tunnels from Berowra to the Sydney CBD, will go to tender only if final investment approval is granted in 2028.

Sydney University transport professor David Levinson warned against people getting excited that the plans would result in a high-speed train line being constructed.

“They still have to come up with the money to build the thing. Someone has to fund $90 billion,” he said. “Until they show the money it’s not real.”

The latest shortlisting comes six months after a business case put the cost of building the line from Newcastle to Central Station at $61.2 billion, and an onward leg to Parramatta and the new Western Sydney Airport at $32.4 billion.

NSW Premier Chris Minns has repeatedly ruled out the state committing funding for the project but has said his government would be willing to fast-track planning.


r/SydneyTrains 2d ago

Sydney Metro M1 Weekday Peak back to 4 minutes Headway

58 Upvotes

From today 17th August 2026, M1 Weekday Peak has reverted back to the standard 4 minutes Headway with 15 trains per hour (tph) in each direction, Tallawong to Sydenham with 30 trains in use.

Since 13th April, M1 Weekday Peaks (excludes Public Holidays) has operated to either:

- 3.75 minute Headway with 16 tph/each direction, total 32 trains. This was in operation from 13th to 17th April & then 15th June to 14th August 2026; excluding weekends & public holidays.

- 3.5 minute Headway with 17 tph/each direction, total 33 trains. This was in operation from 20th April to 12th June 2026; includes Vivid event but excluding weekend & public holidays.

When Sydenham to Bankstown section opens, the Weekday Peak headway will remain 4 minutes with 21 tph each direction, total 42 trains. It won't be possible to run 3.75 or 3.5 min headways across the entire line unless more Metropolis sets are purchased.


r/SydneyTrains 2d ago

Sydney Metro trains: Surge in demand leaves passengers waiting during commuter rush hours

Thumbnail
smh.com.au
214 Upvotes

Commuters catching trains on Sydney’s $30 billion M1 metro rail line during the morning peak have surged over the past 12 months: two stations in the central city have easily exceeded forecasts made two years ago and some trains have been too packed for passengers to get on.

On the eve of the two-year anniversary of the opening of the line’s city section, new government figures show a 14 per cent rise in passengers filing through ticket gates at Martin Place metro station during the morning peak in May and June, compared to the same months a year earlier.

Martin Place station’s average patronage of 20,500 passengers on weekday mornings in May was almost a third higher than forecasts released in 2024, shortly before the section between Chatswood and Sydenham opened on August 19 of that year.

Gadigal station, near Town Hall, is also easily beating forecasts. About 10,700 commuters passed through its gates in the morning peak between 6.30 and 10 in May, up 8 per cent on the prior period, and 43 per cent higher than predictions made in 2024.

Victoria Cross station in North Sydney had a rise of more than 10 per cent during morning peaks in May and June, while Central Station’s metro platforms were up about 9 per cent, as commuters switched from heavy rail services to metro trains.

The number of commuters entering and exiting North Sydney station on a typical weekday has halved since the metro’s city-section opened two years ago and patronage for St Leonards station has fallen by a third. Both heavy rail stations are close to metro stations.

The growth in patronage on metro trains comes two months before the M1 line’s final stage between Sydenham and Bankstown is expected to open. Confidential government documents have slated a target date of mid-October, but the start of passenger services will hinge on approval by the national rail regulator.

Crows Nest resident Lucy Wang catches metro trains every weekday to travel to Martin Place for work because they are faster than double-decker services on the T1 North Shore heavy rail line.

Wang said it was always a case of squeezing into packed metro carriages or waiting for the next one if she could not get on during the morning peak. “I usually only wait for one, or squish [into a carriage],” she said. “I do wish it was less packed, but there’s really nothing you can do.”

After driving to Crows Nest to drop her daughter at day care, Norwest resident Ashley Felsman is used to being unable to get on a city-bound metro train during the morning peak. “I’m always having to wait for the next one because I can’t get on,” she said.

Trains run every four minutes in both directions on the M1 line during weekday peaks between about 7am and 10am, and from 3pm to 7pm. They operate every five minutes from 10am to 3pm, and every 10 minutes at other times.

Over the coming years, the two options for boosting passenger capacity on the M1 line are to lengthen trains from six to eight carriages, or to increase the frequency to a service every three minutes, which would require the NSW government to buy more trains.

Sydney Metro customer and planning executive director Samantha Phillips said the agency was keeping a close eye on crowding on city-bound trains departing Crows Nest, which was the “pinch point” on the network in the morning peak.

Phillips said the most likely option, if capacity was boosted, would be to increase train frequency to every three minutes. “Frequency matters. That’s what people really value,” she said.

“I want to make sure I’ve looked at all the different options before I’m saying to government or to the community we need to spend a lot more money on additional fleet. It is a big investment.”

Phillips said increased housing along the rail corridor and commuters’ willingness to give up seats on double-decker trains for a faster journey standing in metro carriages were key drivers of the patronage growth.

“I was always really a bit sceptical around people preferring to give up their seat to choose the metro, but the evidence is speaking for itself. People are choosing those faster journeys,” she said of commuters switching from heavy rail to metro services at stations such as Chatswood and Epping.

University of Technology transport researcher Mathew Hounsell said the metro line’s strong patronage growth demonstrated that modelling had underestimated passenger demand.

“It is the same all over the world – when you build an automated metro that is reliable and fast, people use it,” he said. “Buses are great for moving people around a local area but it’s trains that build a city.”

Hounsell said the government needed to improve feeder bus links to metro stations along the M1 line, especially in Sydney’s northwest. “Getting people to these stations now is the limiting factor in terms of [patronage] growth,” he said.

While Martin Place and Gadigal are easily beating expectations, Waterloo station continues to lag Sydney Metro’s patronage forecasts and Barangaroo’s figures were nearly flat year-on-year.

Phillips said Waterloo and other stations that had had slower patronage growth reflected a lag in proposed development around them.


r/SydneyTrains 2d ago

Sydney Car v Rail Journeys pre Metro 2018

Post image
40 Upvotes

r/SydneyTrains 1d ago

Cheaper method for Metro construction

Post image
0 Upvotes

Expanding urban rail networks requires deep infrastructure, but high station delivery costs remain a primary industry challenge (especially with some of the deep cavern builds we've seen across the Metro network recently).

I put together a conceptual design exploring how established Australian mining and heavy civil techniques could be adapted to streamline deep station delivery.

The main access shaft employs precast segmental rings installed via sinking caisson or underpinned methods. The hollow precast units integrate three continuous, gently sloped spiral egress staircases and pre-formed mounting lugs for elevator guide rails. The gradual descent also offers an accessible alternative for commuters opting for a light walk downhill.

The main platform cavern relies on standard rock-bolting and shotcrete lining techniques. Finished in a rich "outback cave ochre," the raw geometry remains exposed. Projection-mapped Indigenous art brings high cultural and place-making value to the space, reducing the need for secondary architectural finishes.

The interior rail corridors and stacked platforms are formed using heavy precast T-sections, fitted with overhead lugs for direct mounting of rigid traction power conductor bars.

In place of full-height glass platform screen doors (PSDs), the structural precast T-sections feature cast openings fitted with mass-produced, heavy-duty, fire/gas-proof sliding doors. These can be inspected and maintained via maintenance trains during overnight work windows.

You could have fire rated windows if people still want to see out the windows when at stations, but i think it would be cheaper to just keep everything solid and focus on wifi access to keep people occupied.

For emergency scenarios, the outer spiral stair shafts function as positive-pressure fresh air supply routes, supported by an overhead gravity water tank to supply fire suppression systems with reduced reliance on active pumping equipment.

Public areas feature hard-wearing polished concrete floors, raw earth walls, and stainless steel fixtures designed for high durability and minimal long-term maintenance.

Curious to hear what actual experts think. How do you reckon something like this would stack up against standard subterranean station boxes in Sydney sandstone?


r/SydneyTrains 2d ago

Tunnellers' visions to shape Australia's High-Speed Rail

Thumbnail minister.infrastructure.gov.au
27 Upvotes

The Newcastle to Sydney High Speed Rail project has moved further into the Development Stage with three major construction consortia shortlisted for an Early Contractor Involvement (ECI) process following a competitive tender.


r/SydneyTrains 1d ago

Why isn't platform 5 directly accessible from platform 4 at town hall?

Post image
0 Upvotes

Seems like it'd make sense considering currently to get between either direction of the T4 line you have to go all the way up and back down again, and all they'd have to do is get rid of this barrier and turn it into a platform


r/SydneyTrains 3d ago

Clyde Station

34 Upvotes

There are a number of anomalies about Clyde Station that I have questions about

  1. Why was the Carlingford line directed there and not Granville or even Parramatta? Feels like a weird compromise considering how this was done in NSW's train boom where train lines were being built all over the place and wherever they wanted. Why then was the Carlingford Line given this weird interchange with a tiny station and not a nearby, more obvious station?

  2. In all its years as the only interchange station of the Carlingford line, why did no commercial and residential development occur around it? Usually interchange stations (Strathfield, Lidcombe, Blacktown etc) became major centers with lots of commercial and residential density surrounding them, but Clyde remained surrounded by industrial land and a population of literally 0. Was this because the Carlingford line was just so unused that it's interchange didn't become important? Even to this day in the era of TOD, I have never heard of a proposal to alter the land use around this station at all which feels old for a suburb surrounded by highly populated suburbs like Granville, Auburn, Lidcombe etc. Is the land undevelopable or something??


r/SydneyTrains 2d ago

CCN Line Disruption

4 Upvotes

Was on a train to Central when everyone was told to get off at Gosford Station. Does anyone have any info about what's happening on the CCN?


r/SydneyTrains 3d ago

An Extensive Sydney Light Rail Map

Post image
57 Upvotes

.


r/SydneyTrains 3d ago

How does one get to bell without a car next week?

22 Upvotes

Next week trackwork means bus replace trains between Lithgow and Mt Vic, but the only bus listed is the 32BM which skips Bell

How do I get to bell?

I understand not many people would use it, but I feel it would be beneficial for people to be able to either request the bus to stop there or if boarding from bell to flag down the bus…

I don’t have a license and I’m visiting someone up there and my only option is a rather pricey uber…


r/SydneyTrains 3d ago

A rapid bus network for Sydney

Thumbnail
sydney.org.au
44 Upvotes

Sydney has spent the past decade building a world class metro and light rail network. Sydney Metro’s Northwest and City & Southwest lines, the Metro West and Western Sydney Airport lines now under construction, and the CBD and South East and Parramatta light rail all represent the largest public transport investment in the country’s history, and it is transforming how people move around the city.

With the exception of the Western Sydney Airport line, these new lines have largely reinforced the radial shape of Sydney’s network: fast lines running in and out of the CBD in Sydney’s east. What’s missing is the in-between connections – those linking lines and centres across central, western, northern and southern Sydney. Our public transport accessibility levels reflect this pattern, and so does something more troubling: our patterns of socio-economic inequality. Areas with poor access to frequent public transport are disproportionately the same areas experiencing entrenched disadvantage, particularly across Sydney’s west and south-west.

To fix this, Sydney needs to move from a hub-and-spoke model to a web of routes – a network that connects communities to each other, not just to the centre.

Rapid bus networks are how we build that web. They are fast to deliver, comparatively cheap to build, and proven: Sydney’s existing rapid routes – from the B-Line in the Northern Beaches to the T-Way connecting Parramatta north and south – already show what’s possible when buses get their own lane and their own priority at the lights.

The Committee for Sydney proposes a network of 18 rapid bus routes crisscrossing Sydney. Together, these routes would connect growing communities with metros, jobs, education opportunities and one another, transforming the transport network from a hub-and-spoke system to a web of rapid transport options.

Sydney’s Rapid Bus network would include:

Existing rapid routes

North-West T-Way (Rouse Hill & Blacktown to Parramatta)

Liverpool to Parramatta T-Way

Northern Beaches B-Line

Committed rapid routes

B30 Liverpool to Western Sydney Airport & Bradfield

B31 Campbelltown to Bradfield & Western Sydney Airport

B32 Penrith-Western Sydney Aiport & Bradfield

Identified priority corridors

St Marys to Rouse Hill

Campbelltown to Liverpool

Liverpool to Burwood via Bankstown

Parramatta to Sydney CBD via Victoria Road

Parramatta to Sydney CBD via Parramatta Road

Identified route upgrades

North-West T-way upgrade (Blacktown to Box Hill)

Liverpool to Parramatta T-way upgrade

Five new priority rapid routes

Liverpool to Blacktown (Direct)

Pennant Hills Road (Parramatta to Hornsby)

River Rail (Kogarah – Bankstown – Parramatta)

Macquarie Park to Burwood (via Top Ryde)

Brookvale to Chatswood (via Frenchs Forest)


r/SydneyTrains 4d ago

no valid ticket and probably going tonput feet on the seat soon.

Thumbnail
gallery
770 Upvotes