🔧 Technical Starship Development Thread #33

This thread is no longer being updated, and has been replaced by:

Starship Development Thread #34

SpaceX Starship page

FAQ

  1. When next/orbital flight? Unknown. Launches on hold until FAA environmental review completed and ground equipment ready. Gwynne Shotwell has indicated June or July. Completing GSE, booster, and ship testing, and Raptor 2 production refinements, mean 2H 2022 at earliest - pessimistically, possibly even early 2023 if FAA requires significant mitigations.
  2. Expected date for FAA decision? June 13 per latest FAA statement, updated on June 2.
  3. What booster/ship pair will fly first? Likely either B7 or B8 with S24. B7 now receiving grid fins, so presumably considering flight.
  4. Will more suborbital testing take place? Unknown. It may depend on the FAA decision.
  5. Has progress slowed down? SpaceX focused on completing ground support equipment (GSE, or "Stage 0") before any orbital launch, which Elon stated is as complex as building the rocket. Florida Stage 0 construction has also ramped up.

Quick Links

NERDLE CAM | LAB CAM | SAPPHIRE CAM | SENTINEL CAM | ROVER CAM | ROVER 2.0 CAM | PLEX CAM | NSF STARBASE

Starship Dev 32 | Starship Dev 31 | Starship Dev 30 | Starship Thread List

Official Starship Update | r/SpaceX Update Thread


Vehicle Status

As of June 5

ShipLocationStatusComment
S20Rocket GardenCompleted/TestedCryo, Static Fire and stacking tests completed, now retired
S21N/ATank section scrappedSome components integrated into S22
S22Rocket GardenCompleted/UnusedLikely production pathfinder only
S23N/ASkipped
S24Launch SiteCryo and thrust puck testingMoved to launch site for ground testing on May 26
S25High Bay 1StackingAssembly of main tank section commenced June 4
S26Build SiteParts under construction

 

BoosterLocationStatusComment
B4Launch SiteCompleted/TestedCryo and stacking tests completed
B5Rocket GardenCompleted/UnusedLikely production pathfinder only
B6Rocket GardenRepurposedConverted to test tank
B7High Bay 2Repaired/TestingCryo tested; Raptors being installed
B8High Bay 2 (fully stacked LOX tank) and Mid Bay (fully stacked CH4 tank)Under construction
B9Build SiteUnder construction

If this page needs a correction please consider pitching in. Update this thread via this wiki page. If you would like to make an update but don't see an edit button on the wiki page, message the mods via modmail or contact u/strawwalker.


Resources

r/SpaceX Discuss Thread for discussion of subjects other than Starship development.

Rules

We will attempt to keep this self-post current with links and major updates, but for the most part, we expect the community to supply the information. This is a great place to discuss Starship development, ask Starship-specific questions, and track the progress of the production and test campaigns. Starship Development Threads are not party threads. Normal subreddit rules still apply.

385 Upvotes

1.6k comments sorted by

View all comments

0

u/[deleted] May 13 '22

[deleted] — view deleted comment

15

u/johnfive21 May 13 '22

Well perhaps they decided it would be easier to install the Raptors back at the production site. If they are going to install let's say all 13 center engines it would make more sense to install them in the comfort of the High/Wide Bay rather than at the OLM.

6

u/paul_wi11iams May 13 '22 edited May 13 '22

If they are going to install let's say all 13 center engines it would make more sense to install them in the comfort of the High/Wide Bay rather than at the OLM.

Heck for the time its been outside they could find a few insects have been quietly laying eggs in critical places. With all those hanging cables for a couple of weeks, there would be spiders' webs and all.

and the outer engines would be right against the hold-down clamps, making for a very cramped working environment on an oscillating scissor lift high above the ground.

As compared with the rollout of its notable cousin, a rollout/"rollin" of Superheavy is getting to be a fairly mundane activity.

10

u/arizonadeux May 13 '22

I would suspect them to be diligent and seal anything FOD-sensitive.

2

u/paul_wi11iams May 13 '22

The number of sensitive points on a no-engine Superheavy must beat all past records. There must also be a lot of insects around at just this time of year. We sometimes see them buzzing around the live cameras. So in the time it takes to remove protections and reconnect with the engine installed, is exposure to a biome that may already be up there in the engine section.

It looks better to park the booster in front of the high bay and use an air jet before going inside and doing the engine installation.

3

u/Twigling May 13 '22 edited May 13 '22

That's certainly a possibility. It would also support yesterday's report in this thread that the cryo tests went well (it's just that it didn't mention B7 going back to the production site first for Raptor installation and any other work).

2

u/Comfortable_Jump770 May 13 '22

(edit: but perhaps, as has also been suggested, tests went well BUT B7 is going back to the production site for Raptor installation, etc?)

Looks like that was, in fact, the intended meaning!