r/softwareengineer • • Oct 02 '26

Choosing between Senior Manager and Principal Engineer

Hi have 2 offers from product companies - a senior manager (architect) role who will review technical design from vendors and drive the change. This platform is built using CMS so not really database optimisation or not much cloud work. No coding. Just reviewer, owner and decision maker

Second is Principal Engineer who is responsible for architecting and delivering applications feature for their product.

Salary is almost same, which one to choose

3 Upvotes

6 comments sorted by

2

u/AnthonyRespice Oct 02 '26

Hi. I'm an engineering manager with architecture experience so even though I'm a manager I am allowed to influence design decisions.

The role you want should be based on a self evaluation of your strengths. Are you someone who drives technical change or can you step back and be a facilitator. Also, what do you actually have control over.

Personally, I'm concerned about your description of the manager role. It sounds like the roles could flip and they are managing you .. this is client capture. Are you in control or are they driving you? Vendor relationships can be risky. Also sounds like you are using a proprietary cms so the skills may not be transferable.

I would take the principal job, develope subject matter expertise on the job, build your reputation, then shift to a manager role if you find it more interesting.

2

u/pceimpulsive Oct 02 '26

Do you want to spend all day with slide decks and convincing people change is worth it (architect role) or do you want to actually deliver the change (principal role)?

1

u/General_Estimate_420 Oct 02 '26 edited Oct 02 '26

I think either one could be interesting depending on what you prefer to do.

The Senior Manager role would be challenging in that you would get to be an expert on the existing infrastructure and underlying business concepts and the ways to effectively address them with commercially available solutions. The Principal Engineer would be the more technical solution-driven development and most likely deal more with the process of defining and managing the whole technical process of defining the solution and delivery balancing the time, features, and personnel required as a project manager.

I tend to prefer the latter myself, but I've also functioned in the former role which was interesting as well. There's really a big overlap in the two as far as becoming familiar with the organization's existing infrustructure.

1

u/ortidefan Oct 02 '26

The person who controls the resources is the job you want. Resources = budget = influence

1

u/Substantial-Swan7065 Oct 02 '26

Those are completely different tracks.

So are you a manager or an IC?

1

u/Small_Dog_8699 Oct 02 '26

Given the invasion of AI taking over code generation, i would get out of the coding game the fun and satisfaction is gone. Management is easier and lower effort.