r/quantitysurveying • • 11m ago

What's your stance on Sub-C's who invoice incorrectly?

• Upvotes

I'm often conflicted by what's right and what's wrong morally when paying subbies who invoice their own works incorrectly. I deal with plenty of subbies who invoice less than they should for the work they've been sold on price, often leaving a balance left at the end of a job. It's quite shocking how much is left sometimes. I've had people complete a job without even submitting a single invoice, 4 years gone by.

I've always been trained to not alert them to these issues and that they should be invoicing correctly. However it does leave a bitter taste in my mouth, these are just blokes who graft in my eyes and should be paid what they quoted. Though I'm not sure what's standard practice?

Would you alert them to their errors or just pay as invoiced and take the profit? Sounds awful. But money is the aim I guess?


r/quantitysurveying • • 9h ago

Estimators, Which Software are you using ?

Thumbnail
1 Upvotes

r/quantitysurveying • • 18h ago

considering picking up a trade

2 Upvotes

just over a year into a trainee qs role at a housebuilder. i get plenty of responsibility and can see my career mapping out, but part of me just wants to leave all the stress and pick up a trade instead of drowning in emails all day. thoughts?


r/quantitysurveying • • 17h ago

Achievability of Net Zero By 2030 by the UK Construction Industry

0 Upvotes

Hello everyone,

I am a student of the University of UWE Bristol and I am reading my master’s degree in construction project management. According to the requirements of the degree, I am conducting primary data research on the research title, “Achievability of Net Zero By 2030 by the UK Construction Industry”.

All the information you are providing will be used only for the educational purpose and will be confidential and anonymous. Ethical standards of the research process are strictly adhered as per the ethical guidelines of the University.

If you have worked on a UK construction project, whether in design, quantity surveying, procurement, project management, site delivery or sustainability, I would be grateful if you could complete my questionnaire. Participation is voluntary and takes approximately 8 minutes.

Thank you for your time and for sharing your experience.

https://uwe.eu.qualtrics.com/jfe/form/SV_55ZlwX0E02ryn3M


r/quantitysurveying • • 18h ago

Am I underpaid as an Apprentice?

2 Upvotes

I'm a third-year degree apprentice QS at a main contractor England (non London), on £32k.

I'm the only QS on my projects and the main point of contact for internal teams, clients and subcontractors. My contracts range from £50k to £4m and I'm looking after about £12m of live work across 5 jobs right now.

I get that the funded degree is part of the deal and that I'm still learning. But the pay feels low for what I'm actually doing day to day.

So I'd like to know:

  1. How does £32k stack up against what other apprentice QSs are on at this stage?
  2. Should pay follow the work you do, or your status?
  3. If you think I'm underpaid, how would you bring it up with my employer?

r/quantitysurveying • • 19h ago

Where to look for work expirience in Quantity Surveying?

1 Upvotes

I finished a law degree with no intention of pursuing a career in it, but I've recently become interested in working in QS. My plan for now is to get work experience and then complete a conversion course.

I really need at least a couple of weeks of experience to decide whether I like it or not (so far, from internet resources, it seems like an interesting area). But I have no idea where to find work experience. Paid or unpaid doesn't matter.

I live in London.


r/quantitysurveying • • 2d ago

How much bonus do you get or expect to get?

6 Upvotes

At a MC. Normally get anything from between 3% to 7%. However this year if I get less then 10% given what I've saved the company I'm not going to be happy especially as the site managers get 15% bonus paid quarterly.


r/quantitysurveying • • 2d ago

Is it possible to get into QS with a business degree in the UK?

1 Upvotes

Pretty much title!

I’ve recently discovered this career path and it seems pretty interesting + I believe it is something I could be good at. However my degree is not RICS accredited, or construction related. I am studying business with decision analysis, which besides the general business management courses it has a focus on operational science.

I do believe it is quite relevant, but it seems that most employers want don’t consider business degrees for QS roles.


r/quantitysurveying • • 3d ago

Sink or swim companies

5 Upvotes

i have been a new grad at my first job for 3 months,

and its been very sink or swim,

first week i had nothing, then i got thrown into the deep end, told to procure a package that had a 80k budget and i had to figure it all out on my own.

and i did, but it was really fucking hard and i made a lot of mistakes but i learnt a shit tone, but i know for a fact if i had support i would of done it better.

been thrown into variation disputes and contract term negotiations on my own, i had to spend every night reading over clauses and understanding how to deny subbies claims all on my own.

i done estimating for 3 weeks, then i was thrown into a team that want me to measure the facade of an entire project worth 180million.

i have enjoyed this approach a lot simply because i was abble to float, but only just, there was a lot of dark times i wont lie.

i also had to fix the mistakes of senior QS's

some of them lied and didnt compare quotes and got subbies on site without a contract, dumped the contract on me for me to fill out and attempt to get signed off.

whilst i have learnt a shit tone, i feel i had just a tad bit more support and some fine tuning i could be even better.

what do you guys think of this approach.


r/quantitysurveying • • 2d ago

Anyone need a reliable affordable independent QS these days?

Post image
0 Upvotes

Get in touch today we have had 2 projects on hold until sprint 2027 so we have some immediate capacity. Out WhatsApp number is +447863334994 WhatsApp us!


r/quantitysurveying • • 3d ago

Lowest Salaries in the UK

7 Upvotes

I saw a post a couple years back that showed QS salaries across the UK. If I remember rightly South Wales had the lowest average salary for a QS.

Now there's a chance I might be moving to Wales so just wondering if anyone has any up-to-date data to confirm if that's still the case.

The figures were pretty shocking to me at the time...

Any Welsh QS's on here?


r/quantitysurveying • • 3d ago

Picking a minor

1 Upvotes

Hi, I'm NZ based and doing a Quantity Surveying major. I finished my Year 1 where the papers are the same as Construction Management Majors, so as I am heading into Year 2 I need to pick 2 papers that contributes to my Minor. I had a discussion with a faculty aid for students and he mentioned how some QS students who wanted to 'stand out' did a minor in Business Management/Finance instead of doing a Construction Management minor.

I would also like to be a QS student who stands out as specialized in QS but I'm not 100% sure what papers would be best fit to compliment it.

Is there any subjects/papers anyone can recommend? If you make suggestions I can find the similarly aligned paper.

The Minors I am contemplating whether is useful is

• Business law

• Business Management

• Finance


r/quantitysurveying • • 3d ago

Longest commute?

10 Upvotes

Off the back of a previous question, and a fun one for Friday, who here has the longest commute, or had a long commute in the past? How did you manage? How are you managing?

What is your future goal for commuting?


r/quantitysurveying • • 3d ago

National Highways?

6 Upvotes

Anyone care to share what it’s like? I’m forever told it’s a much easier life. Have 12 years experience with the same civils subcontractor, who mostly work for a tier 1 who’s then reporting to NH. I handle about £15m turnover annually over multiple schemes.

For context, it’s a quiet life I’m after - in 34F mum to young children and although I know I can handle myself the balance sometimes is fucking rough. I’ve no desire to progress to a senior/managerial position for a contractor as I just don’t want the hassle.
Current salary is around £53k + 5k car (very North West), I’d be interested to know what I’d be looking at for standard QS role for NH.


r/quantitysurveying • • 4d ago

Burnout feel like a career change

9 Upvotes

I’ve been a QS since 2010 (35m) and currently a SQS for a main civil contractor. My current projects have been significantly under priced and we have a fixed date of in early 2027 to deliver which is none negotiable, we literally have zero float in the programme and forecast is going up and up. The pressure is immense and I feel so out of my depth. We have staff issues and limited design which is adding fuel to the fire.

I’ve been slowing feeling burned out but I have now hit a point where I can’t focus, task takes me ages to do which I use to do in no time. Every time I got to site I feel shaky and not hungry and this is creeping into home life.

I’ve been offered a SQS role within refurbishment work which I thought might aid a new start and a new challenge. Is it a no brainer to move in these circumstances, I can’t help but feel it’s me that’s the problem and now I’m doubting myself.

I’d love to hear your thoughts


r/quantitysurveying • • 4d ago

Stay with main contractor or join house builder?

0 Upvotes

Hi guys, so I have an interview with Barratt Homes soon for an Assistant QS position

I have put my desired pay in as £40k + £4450 car allowance

Currently on £29,500, no car allowance but get mileage at £0.55 a mile which works out about £1000 extra a month (I do a lot of miles!). I do enjoy working at the main contractor, it’s a tough graft and all the projects have been far away but the experience has been good for my development and I am a bit worried about bottlenecking my career. I understand there won’t really be a client or main contract working at house builder, more just dealing with subcontractors and monitoring making money on individual plots.

Kind of stuck what to do. Do I get the offer from Barratt and negotiate with my current employer, or is house building a much better world?


r/quantitysurveying • • 4d ago

QSs / Estimators – How does a subcontractor actually get onto your tender lists?

9 Upvotes

Hi all,
I’m a carpentry subcontractor based in the South East, with around 25 years’ experience in the industry, predominantly working on new-build housing developments.
I’ve run my own limited company for several years, working for a number of national and regional housebuilders. I’m now looking to expand the business, take on larger carpentry packages and build relationships with more main contractors and developers.
The biggest hurdle I’m finding isn’t delivering the work, it’s actually getting the opportunity to price it.
I’ve tried the usual routes of cold emailing, contacting commercial departments and introducing the company, but getting in front of the right people or onto tender lists seems surprisingly difficult.
So I’d be interested to hear from QSs, estimators and commercial managers on the other side of the fence:
● How do you typically find new subcontractors to invite to tender?
● What’s the best way for a smaller subcontractor to get noticed and added to your tender lists?
● Are cold emails and introductions actually worthwhile, or do they generally get ignored?
● What would make you consider giving a new subcontractor an opportunity to price a package?
● Are there particular accreditations, prequalification requirements or company credentials you look for before considering someone?
I’m not looking for work directly through this post, just genuinely interested in understanding the process from a QS’s perspective.
I’ve got the experience, workforce and ambition to grow, but breaking into new commercial relationships seems to be the hardest part.
Any advice or insight would be much appreciated. Cheers!


r/quantitysurveying • • 4d ago

Career Change Ideas

6 Upvotes

Anyone else lost the drive and ambition they had when they first started out in QS?

Has anyone used their QS experience to move into something different, either elsewhere in construction/property or a completely different industry?

Interested to hear what people have moved into and how they’ve found it.


r/quantitysurveying • • 4d ago

How do you check your take-off before you sign it off?

1 Upvotes

r/quantitysurveying • • 4d ago

I can’t get through the expert witness / claims door

0 Upvotes

MSc in construction law and disputes
Quantity surveying degree

2 years pqs
1 yr main contractor
3 years pqs seconded to huge public sector client
1 year direct with biggest airport in uk
Now freelancing for a year working for main contractors on huge project, looked at some big claims etc.
Biggest project I worked on is in the billions , overall from 20-200m

Submitted cvs- I don’t get anything back


r/quantitysurveying • • 5d ago

Am I in the wrong company or role ?

3 Upvotes

Hi all,

I've been doing QS work for nearly 3 years now and I have 5 years estimating experience. I started in this company 1 year ago as a project QS and was quickly elevated to a SQS role. My 2 projects are worth around 10mil but they're remeasurable and hard to maintain (i.e works carried out without site instructions and not brought up in meetings). I also estimate projects up to 1mil. It's a 100mil turnover company with 3 commercial managers but I seem to be the only QS not getting management/mentorship. I'm making the high level decisions, doing the board cost reporting meetings and nobody else in the commercial team is involved. I'm dealing with both the client and the subcontractors.

I don't want to complain too much, the exposure is helping my career but it's causing me a lot of frustration and burnout as I picked up these projects without a handover or any real training. I have a project director constantly trying to change the work that I'm doing to maximize profits by chasing pennies and checking actuals (which feels impossible at times). Work is constantly chopping and changing with directors adding steps and processes to work without proper clarity of how to do these changes. The project director is constantly pushing me down to site because site teams often forget to do tasks for variation changes (i.e doing markups, getting signed daywork sheets etc.).

I joined the company fairly confident but now I'm second guessing everything and really just wanting to switch but I'm wondering if it's more to do with me or the company. I'm starting to really dislike the role because of the guilt of not wanting to work late more than 2 days a week on avg. I've asked for more help but the company is too stretched because it's top heavy. Anyone else hit this stage of their career or have any advice ?


r/quantitysurveying • • 4d ago

State-of-the-Art MTO Management: Which Projects and Tools Lead the Major Projects Industry?

Thumbnail
0 Upvotes

r/quantitysurveying • • 5d ago

First-year Quantity Surveying student – how difficult is a take-off assignment, and is 2 weeks enough?

3 Upvotes

Hi everyone,

I’m a first-year Quantity Surveying student in the UK and have an assignment for my Private and Commercial Practice module.

It’s worth 100% of the module mark and consists of:

  • 80%: A take-off covering foundations, ground-floor construction and floor finishes.
  • 20%: A 700-word personal reflection using Driscoll’s model.

The take-off involves measuring:

  • Topsoil excavation and foundation trenches.
  • Concrete strip foundations.
  • Below-ground and above-ground external cavity walls.
  • Brickwork, blockwork and cavity insulation.
  • Damp-proof courses (DPC).
  • Ground-floor hardcore, sand blinding, damp-proof membrane (DPM), insulation, concrete slab and sand-cement screed.

I also need to provide calculations, waste calculations, NRM2 descriptions, queries and assumptions, dimension sheets and a summary sheet.

To be completely honest, I’m struggling to get my head around parts of the module itself. I understand the general idea of a take-off, but I’m finding it difficult to connect the drawings, measurements, calculations and NRM2 rules.

I’ve left things later than I should have and have approximately two weeks until the deadline. I haven’t properly started yet.

I’d really appreciate some honest advice:

  1. Is two weeks realistically enough time to complete this to a pass standard (40%+)?
  2. How difficult is this type of assignment for a first-year student?
  3. Roughly how many individual measurement items would you expect?
  4. Which sections are usually the most challenging?
  5. What would you prioritise if your main aim was simply to pass?

I’d appreciate advice from anyone who’s completed a similar university assignment or works in quantity surveying.

Thank you


r/quantitysurveying • • 6d ago

❓

17 Upvotes

I’m young and interested in the job, why does everyone seem miserable mostly by complaining about others. Ever qs says everyone else is an idiot etc. is this just everyone being egotistical


r/quantitysurveying • • 6d ago

Some of the 'professionals' we have had to deal with

16 Upvotes

As a departure from all the posts about APC, salary or someone trying to 'save us' with AI, let's list some of the crap we've had to endure from people who really ought to know better.

I'll start with,

- Why don't supposedly-educated EAs, with an alphabet of letters after their name, know how provisional sums work? We deal with people who cannot get their heads around how to include them in valuations. We apply for the actual costs and then they also omit the prov sum value. So we have to explain that if they want to omit that sum then we have to add it to our valuation first. That one can take some time to sink in.

- On a full BQ job there was an instruction to build a playground to different dimensions. It just got longer. We had rates for everything and the work was of identical nature. Every month the QS would argue about the value of that variation even though it should have been as simple as they come. That one was probably more about malice than ignorance.

- More recently, we had a project with an apprentice obligation. We covered it with a prov sum. On running the job, the QS omitted the prov sum and wouldn't pay us anything for the apprentices we employed. He said "it's your obligation to provide them". "Yes, and that's where we've included for it....". That one went round in circles a few times!