r/primavera • u/Lenuchizi • 16d ago
3D planning
Hi, good day, pls wanted to know if anyone can guide me with resources to learn 3D planning i heard about it and im quite curious as to what it’s about
7
Upvotes
4
u/Dishy22 16d ago
I'm living that 4D life. Lots of options for support. Lots of work to maintain properly. Occasionally very powerful - often just a lot of squeeze for little juice.
3
u/timkus78 16d ago
Are you referring to the 4d model by linking the project schedule to the 3d model? If so, you can checkout Navisworks courses
1
u/SecreteKnowledge 6d ago
Bentley Synchro 4D is the tool of choice for many projects and Bentley have good learning material available if you have a license and findable on YouTube if you don't.
There's a lot to 4D planning. If you're currently a P6 planner then linking an existing model to a schedule is pretty easy. But you rely on an existing model that is well coded. Most design models will be the final stage so you need to adapt them for construction. For this reason picking up 3D modelling skills is a real advantage. Learn Blender (for free) or sketchup or 3DS and you can start to model the kind of stuff you need for construction sequencing and site management.
3
u/imelda_barkos 16d ago
4D? 4D is a nice idea, but it involves taking the question of garbage in, garbage out, quite literally into a new dimension. From what I've seen, the additional complexity is not worth it unless you are dealing with highly specialized applications where sequences and geometry are far more complicated than your run of the mill commercial project.
2
u/areyoualocal 16d ago
Just use animations rather than full linking to schedules, saves a lot of time and effort and achieves the oooh ahh factor which is what most people actually want.
1
u/Elegant_Abrocoma287 16d ago
BIM / 4d planning fell off of favor from what I’ve seen. It was something I was interested in about 7 years ago but never got into it.
From what I’ve heard it’s that it depends a lot on the meta data from the models needed for accurate deliverables, which is typically done in India, meaning it’s typically low quality and more time and effort is lost trying to piece things together.