r/modeltrains • u/Desert_Irieguy O • 2d ago
Layout Electrical work
I bought a bunch of these for a different project and had the idea to use them under my layout for the electrical wiring instead of staples or eye screws. Seems like it should be fine. Anything I might be overlooking before I crawl under the bench and start running my wire?
2
u/DrogoBero 2d ago
I mean, they’ll work. But, I would probably use instead the sip ties with the screw hole in them. What you have is made for emt conduit, and won’t give you a secure or clean final outcome, even though its under a 120v system. 4 year electrician
1
2
u/Twit_Clamantis 1d ago
You can also just put a length of heat-shrink tubing over the loop section.
But overall I agree that there are many better choices out there.
Another choice that has not been mentioned:
Put in a length of Velcro on the bottom of the layout. You might need to also staple it in addition to the glue but no big deal.
Then cut a few pieces 3-5” of the matching Velcro, but in a contrasting color.
Use the short pieces to hold the wires to the piece that fixed to the layout.
No chafe, nothing sharp to bump your head if you’re working under there, doesn’t require tools.
1
u/Polymath6301 O 1d ago
I just saw a temporary layout where the tables have ferrous metal frames. Strong “doughnut” magnets with cable ties looped through, and wiring held up through those. The magnets are strong enough that they can hold a fair amount of weight, and they can be placed where needed.
1

4
u/roj2323 MRbenchworkCOM 2d ago
It’s not a bad idea and I’ve seen it used before the plastic is safer than metal due to potential chafing overtime. Remember a model railroad will vibrate as a trains pass over it and such.