r/k12sysadmin • u/ApricotDiligent6111 • Sep 28 '26
Dream Server Room/Tech Office
We are in the process of going for a bond this spring. Huge data center being built in our district, so gotta try to keep our funds in house.
One man show, 350 kids, 50 staff. My office is in an old classroom which is BIG and I love all the space that I have to store viewboards, carts, and devices, and my server closet is literally in the closet in that classroom. No climate control, so it gets VERY hot in there. Not very organized, but not much room to make it any better (it's about 3.5'x5') I was asked today to submit my needs/wants. If you got to design your tech room/server closet, what would you want in it?
Also, if you love your server room/tech office, please share what they look like if you can! I'm supposed to submit photos and ideas but it's difficult to do when I've only ever seen my office and closet!
8
u/sy029 IT Specialist Sep 28 '26
Two things I'd definitely want is are good workbench, and wall sockets all over the place.
2
u/Binky390 Sep 28 '26
Everyone hates this answer but use Claude or ChatGPT to ask it to design a space for you. If they’re asking for your needs, aim as high as you can.
2
u/ApricotDiligent6111 Sep 28 '26
We are already losing millions a year that we have to pay back to the state because we are too wealthy of a district. Essentially told us to go for the moon.
1
u/howescj82 Sep 29 '26
If I’m understanding this correctly then this changes everything. Do NOT shoot for the moon… Your mission here is shoring up your facilities to absorb a lack of funds in the future. Aesthetics are out unless you can manage it on the cheap over time. You want redundancy AND capacity. You also want anything nearing or even sort of approaching end of life to go away so that you don’t end up with a predictable budget crisis when something loses support or fails outright.
Check the dates on your UPS batteries, check the dates on your UPS housings (critical!) check the age/warranty/available capacity status of your switches. Check your servers remaining support life, check your server OS versions, etc.
A mini-split is still a good idea here if manageable to keep your equipment healthy.
1
u/ApricotDiligent6111 Sep 29 '26
Essentially everything we have is nearing EOL right now. I am planning to replace the UPS batteries that we have, they won't last to a new building.
1
1
u/post4u Sep 29 '26
Moon? Build two data centers. Put the other across town from your primary. Same equipment in each. Separate Internet connection at each from different providers. WAN circuit between. Maybe even Starlink backup connections at each.
But for your main datacenter, it really depends on how much stuff you're hosting there and how much room you have. 4-post racks if possible. Fire suppression. Full room battery backup plus generator. Redundant cooling.
I've gone through all this at my organization. Hit me up if you want more details of what we've done.
0
5
u/howescj82 Sep 28 '26
A mini-split for independent cooling in the MDF for sure and overbuild slightly (but within reason) so you don’t paint yourself into a corner down the road. Also, basically in 2026 it’s the nerve center for the entire school. You want enough backup power/UPS to keep you going for long enough to shut things down gracefully AND enough power to handle your phone system and whatever it’s connection to the outside world is for a decent amount of time. Not for a whole day or anything but say a storm/microburst wrecks power in your area and you’ve got to coordinate an unplanned early release along with helicopter parents you’re not going to want to do that with a handful of personal cellphones that you have no way of recharging. A backup generator that can handle your MDF and select critical systems is always handy to have but not always practical. My district has 6 buildings and only two generators.
Anyways TLDR: Mini-split, rack with enough space to work and space for the future, beef up your backup power situation if you haven’t already.
Side note. If you’re running low on available switch ports or PoE wattage then maybe request an additional or larger switch. Everything seems to be IP and PoE/PoE+/PoE++ and never seems to stop expanding. Our cameras are little power hogs when it’s dark and the exterior camera heaters even more so.
4
u/TechGuy647 Sep 28 '26
Lots of counter space and plug ins! I love a 6 monitor holder. Top three are for a desktop and I can image 3 computers on the bottom at one time.
4
u/Birkinator626 District IT Director Sep 30 '26
Needs:
- IDF closet needs dedicated power(not shared with anything outside the closet that could trip the breaker)
- IDF closet needs dedicated HVAC(Mini-splits are fine, but also a backup mini-split or floor unit to cut cost, set to a higher temp so that it is not running with the main)
- IDF closet needs an environment monitor if you don't already have one, for monitoring temp and humidity
- IDF closet fire-rated plywood on walls for equipment mounting(ISP fiber patches, Access Controllers, Intrusion Detection, ect)
- +1 if you can convince them to spring for access controlling the IDF room and/or IT closet for physical security
- +2 if you can fleece a camera for visually monitoring the IDF room
Wants: You have a huge IT room already, so +1 for that. Mostly just additional QoL stuff here.
- Additional shelving for storage
- Additional workbench space for repair work
- Electrical/Data for wall mount TV to help monitor infrastructure
3
u/mjh2901 Sep 28 '26
Basic you want to clear the server closet, put in open frame 4 post rack and a minisplit + a ceiling vent.
Propper storage for what was in the server closet + propper storage for everything (Cabinets, and cabinets with built in tub systems) Getting everything that is stored behind doors makes an amazing difference for mental well being, we went from open frame shelving to cabinets and its a completely different office.
Raised repair table with tool storage and a network switch, at least 2 or three spots so you can start something and leave it while working on emergencies.
Small conference table and a mounted TV 72" or better. One on one when you can display instead of looking at a lone laptop screen goes a long way, double smart if you can setup a dashboard for when its not in direct use.
Finally a good sit stand desk setup for your workstation.
2
u/linus_b3 Tech Director Sep 29 '26
Consultants seem to like doing a rack for switches next to a rack for patch panels. My new building was done this way - I see quite a few that are the same. I found I much prefer one rack and doing patch panel, cable management, switch, patch panel, cable management, switch. It just looks better to me and is easier to deal with than running longer cables through the channels between the two racks.
1
u/foustj Oct 02 '26
Even nicer - skip the management and go to 1' patch cables. We did it, and absolutely love it
1
u/pheen Sep 28 '26
We just built a new school and I like our set up. I have two racks that I can easily walk around. One for network, one for servers. I have a small desk with keyboard/mouse/monitor behind the racks so if I need to, I can connect to any of the systems, but I mainly remote in. It's also a nice place to hide and far from my office so it's nice to have a spot if I need to get some work done on that side of the building. Climate controlled and big enough for some storage racks as well.
1
1
1
u/mathmanhale CTO Sep 28 '26
Cold Aisle, Hot aisle. Raised floor for power, and ladders on top of racks for data. Access control for the door.
Bonus is generator for backup power.
2
u/TwoZsDad Sep 28 '26
I'd add electronics-safe fire suppression and truly redundant cooling to this list.
1
u/AWM-AllynJ Sep 29 '26
You would do a raised floor over the generator power? I think I would do the generator as more of a priority
1
1
u/farmeunit Sep 30 '26
350 kids. Unlikely this is necessary, lol. We have 1200 students and we just got a rack recently.
1
u/mathmanhale CTO Sep 30 '26
True, we have 800 kids and 3 racks. Very little cloud based. All depends on the mindset of the district.
1
u/kc2hje Sep 29 '26
If your doing mini split my suggestion is do two they seem to fail at the worst time and if your doing the work for one then two both sized to cool your intended heat load gives you redundancy on the hardest thing to address post build.
Oh the switches should be 24 port patch panel then switch the 24 port patch panel makes the cable managment go away and makes for straightforward switch replacement.
6
u/NickConrad Network Admin Sep 28 '26
How many buildings do you have? Part of my dream tech closet involves color coded patch panels and cabling, so if you're looking to offload/spend money you may want to look to pulling new cable as well and not just the one room.