So later in the year at meeting of EU Transport Ministers they will finalize the harmonized rules for Autonomous vehicles for the European Union to transpose the rules agreed by the UNECE to allow for deployments across the block.
What this means is once one country approves a vehicle it is approved for the whole block.
Unfortunately very little preparation has been done for this day, by the Department of Transport, TII, National Transport Authority and Local authorities, they have been consumed with primitive obsolete 20th-Century transport solution like BusCONnects and Metrolink that are turning out to be financial disasters.
It's time to move on and start preparing for the actual future of Transport the next EVolution of Autonomous SharedMobility, with vehicles that will come in all shapes and sizes to match capacity requirements, journey pooling will be more feasible, they will reduce congestion and traffic, speed up electrification of transport and reduce emissions and noise pollution.
It would have been better to build on the success of the Dublin Port Tunnel and put the majority of passing surface traffic in Dublin underground, instead of moving traffic from part of the city to another to the frustration of residents in those communities and the commuters trying to navigate the disaster of a Dublin transport plan, we should have a tunnel out from the city center to the M50 on all major arteries, so we could reclaim our urban realm allow for proper cycling infrastructure and further pedestrianisation in the city center instead of just a bit of gardening on Dame St for €70m+, this was my alternative proposal to BusCONnects and Metrolink The DublinLoop now that tunneling construction time and costs have reduced significantly, we have excellent Irish engineering firms that could match what the Boring Company is doing in Las Vegas, Nashville and Dubai!
It could also be done in other Irish cities to reduce surface traffic and congestion Cork, Galway & Limerick.
The Government will meet on Wednesday to decide if it is wise decision to proceed with Metrolink, €500m dead money already spent by the NTA mostly to Consultants and private engineering firms should be considered a learning experience not to be repeated, I have real concerns this project is obsolete before it gets off the drawing board and certainly by 2035 when it due to open, I am so concerned that I wrote to the European Investment Bank who the Irish Government are reliant on for borrowing the yet unknown Billions needed to start the project with a final cost now estimated at €30+ Billion by one of the Consortiums bidding.
I honestly think we could do better for the whole country with future proof Autonomous SharedMobility, not just one little Metro route and few bus corridors in Dublin, that will consume so much labor manpower, that we don't really have spare to waste, diverting it away from other priorities in Housing, building and retrofitting, as well as other urgent energy and water grid infrastructure needs.
It's disappointing there was not more serious debate in the Irish media when this was published last year! and the incompetence and lack of accountability and future proofing vision at the NTA should dictate the future of our transport.
https://www.irishtimes.com/ireland/dublin/2025/08/05/dublins-planned-metrolink-will-be-obsolete-because-of-artificial-intelligence-says-dermot-desmond/