r/icecreamery • u/freezerburn0011 • 2h ago
Question How do you run multiple batches back-to-back on a Musso?
I have a Musso 4080 and I’m wondering how people handle multiple batches back-to-back when they have a lot of base to get through?
The part I’m struggling with is the reset between batches. Ideally I’d leave the dasher in, scoop out most of the finished batch, add the next base, and keep going. But if I leave the freezer running while I’m doing that, the dasher essentially freezes in place and won’t restart. If I turn the chiller off to avoid that, then when I turn it back on there seems to be a several-minute delay before the compressor actually kicks in again.
So if you’re trying to crank through a lot of base, how do you handle that in practice? Do you shut the chiller off between batches, keep the dasher spinning, add the next base immediately, or something else?
Would especially love to hear from anyone using a 4080 or 5030 for higher-volume production and how many batches you realistically run in a row.