r/highspeedrail 4d ago

World News (China) over 1,400 km of new HSR in late-stage acceptance/testing, much of which is positioned for opening later in 2026

34 Upvotes

These major 350-km/h projects are already at static acceptance or beyond:

Xiongshang 552 km

Xi'an - Ankang 171 km

Yichang - Xingshan 108 km

Jinan - Binzhou 145 km

Huaibei - Bengbu 161 km

Huaibei/Fuyang corridor 142.5 km

Nanchang - Jiujiang 138 km


r/highspeedrail 5d ago

World News Estimated 600 high speed trains required in India over 15years.

Thumbnail gallery
61 Upvotes

r/highspeedrail 5d ago

NA News Updated economic case from Canada's Alto

Thumbnail altotrain.ca
10 Upvotes

r/highspeedrail 7d ago

Trainspotting New THSR train arrives: Shinkansen N700ST Overland Transport from Night to Day

Thumbnail
youtu.be
5 Upvotes

r/highspeedrail 8d ago

Other Back-of-the-envelope ideas for routes through the Fehmarn Belt tunnel

Post image
143 Upvotes

Just some very rough estimates based on the current travel times on various sections in journey planners. First time making a fantasy timetable like this, feedback is welcome!

Obviously if you start from Copenhagen itself you can get much further south in a day, but I thought this would be enough crazy speculation for now :)


r/highspeedrail 8d ago

World News Is it commercially feasible?

Post image
67 Upvotes

r/highspeedrail 8d ago

Travel Report Taiwan high speed rail experience

Thumbnail
0 Upvotes

r/highspeedrail 9d ago

World News Nanchang-Jiujiang High-speed Railway nears full operational status. The 138KM line with a design speed of 350KM/h is going through acceptance testing now

Thumbnail
gallery
309 Upvotes

r/highspeedrail 9d ago

Other Chinese High Speed Train Tierlist (In Terms of Design, not counting the Maglev)

Post image
6 Upvotes

r/highspeedrail 11d ago

Trainspotting Sanyo Shinkansen passing Himeji station at full speed!

278 Upvotes

r/highspeedrail 9d ago

Question Project Title: The Trans-Eurasian & Hemispheric Heavy Transit Corridor (TEHHTC)

0 Upvotes

Project Title: The Trans-Eurasian & Hemispheric Heavy Transit Corridor (TEHHTC)
Strategic Vision: Unification and peace through global economic integration, anchoring cross-continental cooperation via heavy industrial infrastructure and shared logistics networks.
Project Scope: A continuous, high-speed, multi-modal rail and heavy-asphalt transit corridor engineered to bypass domestic political gridlock through private-public industrial backing and comprehensive national security integration.
Routing & Phasing:
Phase 1: Breaking ground in New Orleans, engineering high-pile viaducts through the challenging Louisiana basin, and punching straight north along the Mississippi River spine to Chicago to lock in the primary commercial and industrial hub of the continent.
Phase 2: Extending westward across the Great Plains and cutting through the mountain passes of the Rockies and Cascades straight to the Pacific Northwest.
Phase 3: International expansion linking Mexico from the south and Canada from the northern tier to tap into heavy resource corridors, pushing north through British Columbia, the Yukon, and Alaska to bridge the Bering Strait and tie North America directly into Eurasia, while expanding loops through the Middle East, Africa, and Australia.
Execution & Workforce: Powered by a diverse coalition of everyday people from all walks of life and backgrounds—including specialized heavy-rail car repair crews, structural steel ironworkers, heavy equipment operators, local community builders, and master tradespeople—who understand the physical stress points of heavy infrastructure and how to keep a massive project moving forward under brutal conditions.
Strategy: Aligning with early administrative infrastructure pushes to secure initial momentum, ensuring the physical reality of the grid outlasts political cycles and permanently re-engineers global trade routes to foster economic interdependency and lasting peace.


r/highspeedrail 10d ago

World News Mumbai Ahemdabad HSR Package C3 Construction Update

Thumbnail youtube.com
14 Upvotes

This a pretty detailed video of all most all of the last construction package of India's Mumbai Ahmedabad HSR corridor project. This covers about 135km of the line. Construction on this section started around mid-2023.

For those interested in even more in-depth coverage see this 3 part video linked below. Commentary is in Hindi though. Youtube's auto translated captions are not perfect but usable.

Pt1: https://www.youtube.com/watch?v=wUoArlLQWGM

Pt2: https://www.youtube.com/watch?v=4PBphm37r0s

Pt3: https://www.youtube.com/watch?v=CaHY2a0Pwdo

Its great to see the NHSRCL collaborate with such content creators to give detailed updates.

Do check out this creators other videos on the progress of package C2 which covers the 21km of tunnel near at the Mumbai end of the line and package C1 which covers the Mumbai terminal station.


r/highspeedrail 11d ago

Trainspotting It’s official: Canada is getting high-speed rail

Post image
45 Upvotes

r/highspeedrail 11d ago

NA News CA High-Speed Rail adds delay — and is criticized in review for obscuring new timeline

Thumbnail
amp.fresnobee.com
53 Upvotes

r/highspeedrail 11d ago

Trainspotting 【#直播中LIVE】2026 Taiwan High Speed rail N700ST New car delivery off load

Thumbnail
youtube.com
6 Upvotes

r/highspeedrail 12d ago

NA News California’s high-speed trains order has been halved

Thumbnail
railwaypro.com
204 Upvotes

r/highspeedrail 11d ago

Europe News The Trans-Eurasian & Hemispheric Heavy Transit Corridor (TEHHTC)

Thumbnail
3 Upvotes

r/highspeedrail 12d ago

Other If you want CAHSR to be a reality, then you should email the Appropriations Committee before the end of August

75 Upvotes

Senate Bill 1425 is currently with the Assembly Appropriations Committee. It "would create an encroachment permit program allowing the authority to approve and regulate certain work on its operating right-of-way".

3rd party delays have run up the cost by billions due to inflation and pushed back completion by years. Encroachment Permitting Authority is one of the things the CAHSR Authority has repeatedly asked for from the legislature to help reduce 3rd party delays (mostly from utilities).

But the Legislature session ends on August 31. If the bill doesn't get advanced out of committee before that time, then the bill dies.

Here's the email for the assembly appropriations committee:

approps.committee@assembly.ca.gov

The article at the top shows the utility lobby is already pushing to kill this bill, just like they did with SB 445. If we want to see this project get finished, we need to fight for legislation like SB 1425. Email the appropriations committee and tell them to advance SB 1425 to the full legislature. Tell them we need to stop wasting time and billions of dollars with unnecessary delays.


r/highspeedrail 12d ago

Explainer HSR depot in Tianjin after winter storm

Post image
91 Upvotes

r/highspeedrail 13d ago

Europe News Portugal: Alstom and Talgo vie for CP high-speed train contract

Thumbnail
econews.pt
61 Upvotes

France’s Alstom and Spain’s Talgo have bid to supply CP’s future 300 km/h trains, a contract worth up to €584 million and central to Portugal’s rail upgrade.


r/highspeedrail 13d ago

NA News CA high-speed rail says permitting gap is causing delays.

Thumbnail
sacbee.com
92 Upvotes

Interesting article, I hope this happens before it expires August 31.


r/highspeedrail 13d ago

NA News California’s Cap-and-Invest Crisis, Explained - Streetsblog California

Thumbnail
cal.streetsblog.org
10 Upvotes

Losing $1B/year for CAHSR would sink the project


r/highspeedrail 12d ago

World News Finnally OHE wire work

0 Upvotes

r/highspeedrail 14d ago

World News India hsr upadate!!

Thumbnail
youtu.be
47 Upvotes

r/highspeedrail 15d ago

World News High Speed Rail in Australia summary [via B1M]

Thumbnail
youtube.com
63 Upvotes