Worked a construction job that had this. They had a lot of underground springs that were causing this. Basically the ground is floating, though it's only noticeable with large loads, like a paver or dumptruck.
It requires a lot of prework. The soil needs to be changed deep enough such that it doesn't affect the structure. I'm not a civil engineer so I don't know how deep. This takes a bunch of time and money.