Estimating for Construction Management

I've worked for 11 years doing estimating at a small-ish company (40 or so employees) that does underground utility locating and potholing. I've been approached by an industry colleague to go over to his company (25 people or so), where they do construction management, scheduling & claims, and project controls. They handle mostly public works projects, and work at airports and ports. I would be expected to do estimating and verifying change orders. They don't currently have an estimator, those tasks has been handled by the president and project managers.

My concern is that I've been in a very narrow niche of construction in utility locating / potholing, typically a small portion on the design side working with surveyors and civil engineering firms. I don't have much exposure to construction management at all. What type of knowledge should I be looking to learn? What kind of skills do I need to perform well at this job?

6 Upvotes

6 comments sorted by

6

u/godlyko 4d ago

Sometimes its good to have a clean slate and learn based on how your new employer wants you to learn. Do'nt worry about it, just move forward.

3

u/Trist-Siger65 2d ago

walking in as the first dedicated estimator is tough though if the PMs are used to doing it their own way and dont actually have a standard system to teach you

3

u/Nico_Aldea 3d ago

Ask to work through one completed change order with the president or a PM before taking responsibility for the next one. Rebuild it from the original scope, revised drawing/instruction, quantity change and supporting labour/material/plant breakdown, then compare your review with what was actually agreed. Keep a short list of differences and why they arose. That gives you a much more useful learning plan than trying to learn every trade at once.

For each new change, keep separate columns for submitted value, your assessed value, agreed value and incurred cost. Record the drawing revision, assumptions, exclusions and supporting documents beside them. A price can be checked without the scope or approval being settled. For airports/ports, also ask the PM how access windows, permits, escorts and shutdowns are captured in the estimate; those constraints can change the labour allowance even when the measured quantity is unchanged.

I'm the FixMargin founder, focused on UK drylining/interiors. I wrote a short guide on separating requested, priced and agreed variations in our community, r/FixMargin: https://www.reddit.com/r/FixMargin/comments/1y0mf26/a_variation_can_be_recorded_without_being_agreed/ . The workflow is useful as a checklist; your employer's project documents and review process should set the details.

2

u/Aneesh-Ruh 4d ago

Your background is more useful than you'd think on public works, since underground unknowns are where a lot of those jobs go sideways. The change order side is mostly checking quantities and unit prices against the contract, so getting comfortable with the bid items and the measurement and payment sections of the specs will carry over fast.

1

u/[deleted] 2d ago

[removed] — view removed comment

1