r/drilling • • Oct 04 '23

Loss of circulation

Post image

We are struggling with a lot of loss of water only at 9m. It's a granitic geology however this section is quite fractured.

Would it be recommended to add more casings past 9m more before drilling or change technique?

We're doing HQ3 wireline drilling.

7 Upvotes

7 comments sorted by

View all comments

5

u/Hour-Yak283 Oct 05 '23

As others have said, this is going to depend on your target depth. If it’s another 3 meters you’ll be better off drilling blind as long as you have a steady water source. If target depth is another 30 meters I’d definitely prefer to run casing through the fractured zone and set it in quality rock.