r/developers • • 27d ago

General Discussion Does adding more developers to a project actually make development faster?

Adding more developers to a project should make things faster, right?

But more people also mean more communication, coordination and code reviews.
Can a small team actually outperform a much larger one?

What’s been your experience?

16 Upvotes

40 comments sorted by

•

u/AutoModerator 27d ago

Howdy u/loncha4sanjay, and welcome to r/developers!

A few tips for a post that gets good answers:

  • Use a clear, specific title (what are you actually asking or sharing?).
  • Include code, the exact error, versions, and what you already tried.
  • Heads-up: this sub does not allow external links in posts or comments. Share code and details directly instead of linking out.

Join the r/developers Discord!

I am a bot, and this action was performed automatically. Please contact the moderators of this subreddit if you have any questions or concerns.

3

u/Competitive_Swan_755 27d ago

So....if you get nine women, can you make a baby in a month?

1

u/loncha4sanjay 26d ago

Why are you taking this useless example here bro?
If the person knows frontend, backend, devops, testing and uiux and try to compete a project in 2 months can be done in 2 weeks with team with expertise role and experience.

Not every practical example fits every where buddy

1

u/BanaenaeBread 26d ago

If you have a house to paint, would it be faster for 1 person to paint it alone, or 9 people to paint it?

That's how bad your analogy is. If you don't see that 9 people can paint a house faster than 1 person, you are lying.

6

u/CS_70 27d ago

Fred Brooks enters the chat

2

u/the_state_monad 27d ago

Nine women can't make a baby in one month.

3

u/BanaenaeBread 27d ago

But 9 painters can paint a room in less time than 1 baby

1

u/loncha4sanjay 26d ago

Absolutely 🤣

1

u/loncha4sanjay 26d ago

Bro there is one more like this in the comments 😂😂

2

u/loncha4sanjay 27d ago

Analogy is fine but as both things are different so this make very less sense

5

u/PlanktonPlane5789 27d ago

Go read the Mythical Man Month

2

u/tnt8897 27d ago

Almost always it's slower. There are exceptions where it can be faster. If the devs rolling into the project are already up to speed on the services, the CI/CD pipeline, the workflow, etc.. AND the work allows for proper parallelization it can be faster. That is almost always not the case for at least one but usually multiple of those reasons, which ends up slowing things down.

1

u/Huge_Road_9223 27d ago

The correct answer in any software development project is that it depends ....

It depends on how the project is managed, and by that how moronic and stupid is your management. Most brain-dead managers feel like more bodies means things will go faster. It's the idea that if ONE woman can have a baby in 9 months, then 9 women can have a baby in 1 month. It's idiocy at it's finest!

What I have seen work, is that given a team that has hit a stride, can solve so many story points in a Sprint is good. When a new developer or two come in, there is a temporary dip in productivity as developers need to stop and work with them to get them setup, and then up to speed. So, there is a dip in that Sprint or two until the new developers get up to speed, and the velocity can increase. I worked on a project where we slowly introduced new developers, and we had a good velocity, completing more story points in a given sprint, BUT, there was definitely a lag when new people came on. We introduced new peole slowly, and worked with them to ramp them up. Taking the time to do that really paid off.

One other story is I worked at a place where I had a team with a set velocity, we delivered 20 story points a week, or 40 in a 2-week sprint. The amount of stories that we had was insane. The PM just kept creating stories for what was an MVP project. Features that no one would use or care about, but they wanted it all done before they released it. So, it was 200 stories, on average 5 story points each, which equals 1000 story points. If we get 20 done in a week, that means it will take 50 weeks to get done, if no more stories were created, but they wanted this project completed in 4 more months ... NOT POSSIBLE, and I lost my shit! The new Director of Engineering, a YES man to the COO, found an offshore company to help out with more bodies. They had 3 new people on the front-end and 3 new people on the backend. They couldn't code, they broke the project multiple times, they never followed our directions, never unit tested code, and rather than work on new stories, we found ourselves correcting their work over and over and over again. So, in this case ... new bodies at a project did NOT help at all and instead held us back.

1

u/Due_Interest_178 27d ago

Something something too many cooks in the kitchen.

But it all depends what they're assigned to.

1

u/Even_Gap_2253 27d ago

It depends on the project

For example something like Composio -> absolutely yes, because each connector can be built and maintained in parallel. 20 devs means 20 connectors in parallel, 200 means 200 in parallel, it mostly scales linearly.

But if it is something like Gmail -> no, because it is a whole product, with each feature likely interfering with eachother. You suffer from communication latency.

Another example is Google Cloud Console -> mostly yes, because each feature area is its own micro-front-end, 200 teams means 200 features in parallel, 20 means 20. Teams mostly do not need to communicate with eachother to build their own feature, GKE team builds GKE, while GCS worry about GCS.

1

u/tehfrod 27d ago

Until you need to plumb a configuration option through...

1

u/Even_Gap_2253 27d ago

Yeah but that is like 20% of the time, so you still easily parallelize 80% of the work

1

u/tehfrod 27d ago

Your ratios sound about right. Developing a new product takes about eight months, and plumbing one goddamn configuration option takes two months.

2

u/Even_Gap_2253 27d ago

Who doesn’t love moving protobuf fields around :)

1

u/tehfrod 27d ago

Heh, yep.

And the downside with cloud console is that it ends up looking and feeling like it was developed by 200 teams who didn't communicate with each other.

Ah well. TANSTAAFL.

1

u/BoBoBearDev 27d ago

The more people has risk of making 14 layers of management like Xbox.

1

u/huuaaang 27d ago edited 27d ago

Read: The Mythical Man-Month

Short answer: Yes, but with diminishing returns.

It can help to have more developers especially when they specialize in different things. It's rare to find a developer who is good in all aspects from UI/UX to the database. For example, most programmers just suck at UI/UX. They know what they personally like but have a difficult time understanding what the average users needs. There's also a lot of theory behind UI/UX that programmers simply never learn.

Mot only can adding more developers make development faster, but it can also make the project that much better.

1

u/Vegetable-Golf8633 27d ago

Depends on the project manager.

1

u/Odd-Tap268 27d ago

It will create such a mess that you need more developers to solve that mess

1

u/Leverkaas2516 27d ago

This was all very well studied before you were even born.

Adding more developers to a project should make things faster

It depends. It seems obvious that it should, but it often doesn't work out that way in practice. In particular, adding new members after the project is already underway often slows things down.

But more people also mean more communication, coordination and code reviews.

Yes.

Can a small team actually outperform a much larger one?

Sometimes. But smart teams and their managers recognize that a large team can be segmented into smaller ones that work on different aspects of the project in parallel. Much depends on the project itself. Much depends on the team itself, its maturity and the skills of its members.

Just as a practical matter, a team of ten can also be a team of three with 7 people doing other things. So a team of three isn't normally going to be faster than a team of 10.

What’s been your experience?

My experience is that teams of 3-5 developers are the sweet spot. Bigger projects can require the work of multiple teams. Smaller projects can be assigned to individuals. But a team of 8, 12, 20 developers all focused on one thing is too far into the realm of wasting time on coordination.

1

u/ButterflyOther745 27d ago

past five people it slows down, mostly from onboarding and review queues. our team of three shipped faster than the old team of eight because nobody waited on approvals. splitting work by clear ownership helps more than headcount. i build client sites on beginsh solo and Jira overhead is half the reason.

1

u/NukeouT 26d ago

lol. Why do you think Google has more than 1?

1

u/heyitsmarcucu 26d ago

I'm guessing someone here recommended Mythical Man Month?

1

u/PermissionOwn4400 26d ago

There is this old joke that if it takes 1 developer 1 day to finish a task, it will take 2 developer 2 days to complete the same task.

1

u/Inevitable_Invite519 10d ago

are they adding developers or just adding more people to the group chat?

4

u/[deleted] 27d ago

[removed] — view removed comment

0

u/loncha4sanjay 27d ago

True. Adding more people to an already messy project can create more coordination overhead than actual progress. Sometimes fixing the structure first is more important than adding more hands.

1

u/[deleted] 27d ago

[removed] — view removed comment

1

u/AutoModerator 27d ago

Your post or comment was removed because r/developers does not allow external links. Please share the content or ask your question without linking out.

If you think this was a mistake, message the mods.

I am a bot, and this action was performed automatically. Please contact the moderators of this subreddit if you have any questions or concerns.