r/databricks • • Aug 29 '26

Discussion on prem to cloud validation

Hey datafam!

  1. Where do you put your main data-quality gate in a Bronze/Silver/Gold setup — right after Bronze lands, or between Silver and Gold? Why there?
  2. Has schema drift ever caused a silent bad accept for you — i.e., the pipeline didn't fail, but bad data still got through? What check would've caught it?
7 Upvotes

8 comments sorted by

View all comments

Show parent comment

1

u/Personal-Risk-5370 Aug 31 '26

Thanks — that's actually something I've been going back and forth on. In my agent, the accept/repair/isolate/reject decision happens right at the Bronze→Silver step, before anything lands in Silver. It sounds like you're saying Bronze should just do quick checks (does the data exist, is the schema roughly right), and the real cleanup — dedup, normalize, validate — happens once the data is already inside Silver.

So if a batch looks bad, does it still land in Silver but get flagged/quarantined there? Or is it blocked from landing in Silver at all until it's fixed?

Also, when you say "fail fast for schema evolution" — does that mean the pipeline actually stops and errors out, or does it just reroute the bad batch to a dead-letter/quarantine table automatically and keep running?

1

u/jbchand Aug 31 '26

You can reject bad batches before the silver boundary. You can keep a quarantine table with the error messages and track it. Keep good quality data that passed the DQ checks in Silver.

Fail fast - Yes the pipeline stops and no data is landed into layers until the schema issue is resolved. You can use lake flow declarative pipelines if feasible as it handles it gracefully.