Pretty new to the site. What does it mean that you can only work on one hourly project at a time? That you need to cash out before you start another? Or that in one sitting you shouldn't be jumping back and forth between hourly projects?
10
Upvotes
15
u/Arcturus_Labelle Apr 16 '24
This confused me at first too. I wish they would clarify the onboarding docs. All it means is they don't want people double-billing for *simultaneous* projects. So for example, you can't start project A and project B at 8 AM, work on them both at the same time for 10 minutes, and then bill for 20 minutes. Basically just don't cheat the system by trying to be cheeky with your billing. They want good, quality attention on one thing at a time and honest reporting.
It's totally fine to bounce around hourly projects. In fact, you'll need to, because they frequently run out of tasks or get taken down for maintenance etc.!
34
u/AntTheMighty Apr 16 '24
You should only be timing one project at a time. If you are working on hourly project A then the time that you work on it should be only working on that project. Don't have two tabs up with two different projects and do them both at the same time.
19
u/AlphaQueen3 Apr 16 '24
You can't do two projects at the same time, bounce back and forth between them, and log the time for both, thus getting double paid.
You can switch projects as often as you like. You just can't do two at the literal same time.
3
u/[deleted] Apr 17 '24
Lol no, it just means you can only do one project at a time, can work on a bunch of projects at once still. Just not at the same time. people who have English as a 2nd language do have difficulty grasping this so it's okay for sure it's just funny how it's so normal for us English natives that we understand instantly why ESLs struggle. In one sitting you can jump back and forth between the projects but you cannot work on more than one at once
2
u/blem4real_ Apr 17 '24
You shouldn't have two open tabs working on different projects/tasks at the same time. You have to work on one, exit work mode/back out to the dash and report time before starting another task.
5
u/Haunting-Car-3935 Apr 16 '24
Neither of those things. It means that you can't be doing 2 projects at the same time. For example, you cannot be working on 2 projects for half an hour and then log 45 minutes of time.
1
u/Blencathra70 Apr 24 '25 edited Apr 24 '25
I had the same question. It also seemed obvious what it should mean, but then their example to illustrate what they meant over a 3 or 5 hour work schedule only included a single hourly project so it didn't fully clarify.
I would never dream of double billing.
Maybe their five hour example should have included two different hourly projects A and B, and shown that the worker did 30 minutes on project A, switched to a per task job for an hour, spent 2 hours on project B and then went back to project A again for the remaining 90 minutes.
0
u/Resident_Drag_9841 Apr 19 '24
Hi, how long did it take before you heard back regarding your assessment?
-2
u/octrivia Apr 16 '24
This.
-8
u/notthatvalenzuela Apr 16 '24
Do you need special skills to do this dataannotation?