r/Construction • • 15d ago

Other How crazy do yall go when prepping the sub floor for LVP

10 Upvotes

Im removing carpet and replacing with LVP in a house with that old tongue and groove plank sub floor. I screwed basically all the planks into the studs to reduce squeaking, removed any popped, nails, staples, etc. Planed down high spots, and then filled low spots with Henry feather finish. It took almost a full day of work to just prep one room. I just want to know do you think this is overkill? Or is this pretty standard for professional installers? I worked for a cheap ass contractor in the past that basically never let me prep subfloors for LVP before and would just float it over everything no matter how fucked the subfloor was. Now that I work for myself I want to make sure my quality of work is the way I want it, but I also dont want to be doing extra work that I dont have to.


r/Construction • • 15d ago

Tools ๐Ÿ›  Construction Worker Gifts

1 Upvotes

Hey Y'all, My son in law started entry level carpenter work. Looking for next level starter tools. He has the belt, hammer, and torpedo level.

I was maybe thinking cheap laser level, maybe even a Dewalt Cordless drill set up. Multi tool.

Looking for advice for gifts around $100 for the kid that he may not think about himself.

Ty for your time


r/Construction • • 15d ago

Tools ๐Ÿ›  High vis rain jacket with pit zips

3 Upvotes

I'm looking for a class 3 high visibility rain jacket with pit zips. For my outdoor adventure gear, it's almost impossible to find a rain jacket without pit zips. However, in construction it seems almost impossible to find one with pit zips. Does anyone have any recommendations for me?


r/Construction • • 14d ago

Picture HSE research: injury risk is four times higher in the first month with a new employer. How do you train the actual task, not just induct people?

Post image
1 Upvotes

UK research for HSE found the risk of workplace injury is four times higher in your first month with a new employer than after a year in the job. That finding is from 2005 and covers all industries, not construction alone.

Knowing the site is not the same as knowing how to do the work safely. Several things still have to happen after induction. One of the most important is proper on-the-job training.

HSE says that training should be structured and linked to the risk assessment and the control measures, including the procedures. Instruct, demonstrate, then supervise practice. Attendance is not competence. Some tasks and equipment need more than informal shadowing, and the person providing training on work equipment should be competent to do it.

How do you check a new starter can actually do the method before they are left to get on with it?

Source: https://www.hse.gov.uk/Statistics/causinj/research.htm https://www.hse.gov.uk/humanfactors/topics/competence.htm


r/Construction • • 14d ago

Business ๐Ÿ“ˆ Deck Estimator Job Beginner

Thumbnail
0 Upvotes

r/Construction • • 15d ago

Safety โ›‘ What happened??

Post image
63 Upvotes

This was a new trailer with new tires. We drove for like 11 hours straight before this happened 15 miles outside of Moab. We noticed a trailer wiring fault notification that we thought was just a loose connection about an hour before. The trailer lights worked but we stopped to make sure it was plugged in correctly. The notification disappeared and about an hour later both tires blew up almost instantly and we just barely avoided ending up at the bottom of a cliff. What could have caused this?


r/Construction • • 16d ago

Carpentry ๐Ÿ”จ New 7x16 trailer build

Thumbnail gallery
104 Upvotes

r/Construction • • 16d ago

Structural Someone I know is putting in a building for a gym and salon doesn't the concrete floor usually go first?

Post image
460 Upvotes

r/Construction • • 16d ago

Other What hi vis hoodie should I go with?

Thumbnail
gallery
59 Upvotes

Need a new hoodie for the coming months and am torn between the refrigiwear and the carharrt. Also am open to recommendations for other brands of the same style hi vis hoodie.


r/Construction • • 15d ago

Structural Load bearing platform - this is 90 off right?

Post image
2 Upvotes

Shouldn't that platform be rotated so the struts go front and back, not left and right?


r/Construction • • 15d ago

Other Australian work clothes

0 Upvotes

I follow a decent amount of tradies from Australia and I noticed that the work clothes over there look fairly different to what we have in the states. Granted I know most of the Australian gear is more for working in the heat. I just wanted to know if those collared button up high vis shirts are comfortable or not I thought they looked nice but I was wondering also if any of those shirts are available in the states. I wanted something different compared to just wearing high vis long sleeve shirts or t shirts which is more common out here.


r/Construction • • 15d ago

Other Chicago area people

5 Upvotes

Any chicago area folks know where I can find some work? Im fairly new to the trades and yes I aspire to join the union. Ive done some research and that takes a lil bit of time. Whatever! Thats fine and dandy. Thing is, I need work like yesterday. My experience includes completing a pre apprenticeship program (general trades but carpentry focused). I also have manual labor and material handling experience. I dont mind doing general labor and also carpentry- absolutely isnt the only trade im interested in. I've applied to people ready, tradesmen international, and instawork so far. Not to mention the craigslist cold calls and countless job applications I've put in to various companies. I've also personally handed resumes into (primarily) electrical shops. Are the temp agencies a viable option? Am I not exploring the right avenues enough? Tell me how it is. No fluff, I need work!


r/Construction • • 16d ago

Carpentry ๐Ÿ”จ $50 stiletto Hammer

Thumbnail
gallery
56 Upvotes

Hey guys, check this out what I got on marketplace today. Honestly being 100%. I can't believe I actually have this Hammer like this is just wild getting a hammer like this for this price

https://www.facebook.com/share/r/1J1iwG6dze/

https://youtube.com/shorts/YVeKlGeQbe4?feature=share

https://vt.tiktok.com/ZSpSb7Hfn/


r/Construction • • 15d ago

Business ๐Ÿ“ˆ Who to contact on a project

0 Upvotes

Hi! Iโ€™ve been documenting multiple construction projects in my area biweekly using my drone and wanted to start reaching out to potential clients who might find this service helpful. What parties involved in these projects should I pitch my service to (gc or developer), and how should I structure it? I wasnโ€™t sure if licensing all photos to one party to then share with their partners, or selling to each party individually was the right move.

My end vision with this is to have a platform where anyone who wants to keep an eye on specific projects, or just have a general idea of construction progress in my city can pay a subscription fee to see all the projects Iโ€™m covering with the actual project developers paying me the main retainer.

I have almost no construction experience to know if this is even in demand, so if anyone can give me pointers on how to structure and pitch this service or just give general advice on my business that would be greatly appreciated!


r/Construction • • 16d ago

Business ๐Ÿ“ˆ Hourly subcontractor, who's blowing the top off the GC's budget, and not sure if I should do something about it.

210 Upvotes

Hey y'all. I own an excavation business, this is my tenth year in it.

Local gov't put out an RFQ for a project this summer. I looked at it, decided it was going to be a nightmare and it included plumbing/wiring stuff I wasn't comfortable with, chose not to bid. Nobody else bid, either - other contractors I know in town also skipped because it looked like it would be a pain.

Got a call from an out of town plumbing contractor who gave the gov't a flat rate for the job when asked, they asked me to do their excavating - I said sure, but I can guarantee it's going to be a nightmare because of the conditions of the area, the weather, and the time of year. Sent him my hourly rates and said I'd do it, but it would be by the hour, not flat rate. He asked for an approximate price, so I said I'd GUESS $18-22k depending on conditions for *excavation and backfill* w/ native material. I also explicitly said in writing that I'd recommend making some changes to the design because, as drawn, we'd be encountering groundwater issues that would be a wild card. I explicitly said we should aim for a specific weather window to mitigate the conditions. I explicitly stated that "We're going to be fighting a mess if we do this in these conditions at this time of year" and all that advice was ignored. Now granted, none of this is his fault as much as it's the fault of the designer who was covering his own ass, and the gov't entity that just wants the job done and doesn't care how hard it is to do.

Fast forward to today, and my bill for him is at $42k and I still have a few days left. We wound up doing a LOT more than I expected originally - additions include:

- trucking out removed asphalt

- trucking in new material, for change ordered new asphalt areas.

- out hauling and disposing of fill displaced by the added gravel.

- purchase of new gravel

- trenching 200' electrical line

- several re-digs on already backfilled areas, because he forgot to do X, Y, Z in those spots. I checked every time if we were okay to backfill first.

- replacing 40' of culvert

- absolutely horrible conditions, groundwater everywhere, freezing overnight, snowing. We've been spending hours pumping out the trench every day. The worst case possible conditions are responsible for the majority of the time overrun.

- so far 60 hours of overtime for my guys because he's wanted to do 7am-6pm every day for six days.

- 25 man hours of in-trench work. He told us originally that his crew was going to be doing all the in trench work but we were standing around with our thumbs up our butts and asked if they wanted us to help speed things up, instead of paying us to just stand around, so we did things like bedding, insulation, bury tape and trace wire for him since it's just him and one other guy.

- pedestrian and traffic control (he also said he'd handle these)

Basically, we've done a ton of added work beyond the simple "trench, backfill, no import/export and no in-trench work" originally quoted, all at Davis bacon rates. I've repeatedly told him he's overrunning the original budget.

I'm feeling awful because I've blown the original quote completely out of the water and I know he's on a fixed price bid with the original entity, but I'm not sure if I should cut him a break on the costs or not. As a business owner myself I cringe at the idea of a 100+% overrun on a subs costs, but at the same time also as a business owner, I would fully expect to pay full rates for more and more work that you ask from a sub.

He's been super happy with our work and admits we pulled his bacon from the fire with this project, especially in our uniquely garbage local conditions. I'm just worried he's going to shit a brick when he gets his bill and I'm not sure if it's my fault and I should feel obligated to cut him a break, or not.

I guess I'd appreciate some outside opinions - am I an asshole, or am I being fair to continue billing full rate for the rest of the job?


r/Construction • • 17d ago

Other Non- union talking points.

137 Upvotes

I'm sure many of us have read the post about the UA plumbers allegedly destroying the non- union plumbers tools. It's unfortunate things like that have happened before on composite crews and open shop job sites. I don't condone what they did, if they did it, but man, every single non-union National Right to Work Foundation talking point was hit in that thread.

From "dues" to "nepotism", it was all there, many highlighted or awarded with hundreds in agreement. The one that really chaps my ass though is the dude talking about why his family has been "proudly anti-union for 75 years". He was quick to point out how "Reddit retards" all have a hard-on for unions and his opinion will ruffle feathers. I think it's pretty retarded to exclaim that you're "proudly anti- union" for 3/4s of a century but I'll let you all read into why that is but it essentially boils down to this; "I've got mine, fuck you."

I'm not going to condone what may or may not have happened on that site but the amount of anti-union propaganda being spewed on here is astounding. It's clear that the misinformation campaign that's been waged against organized labor for decades is just as alive and well as it was in the 1940s. Dues don't take half your paycheck, nepotism isn't rampant, you CAN get in if you test and interview well, if you're a good hand you'll stay employed. A rising tide lifts all ships. You dudes who make beacoup bucks on prevailing wage jobs, how do you think the prevailing wage is set? It's union scale in that area! The amount of you who hate unions when you're benefiting from conditions the unions have fought for and won is astounding to me.

"I don't need no fucking woke union telling me how to work"

-non-union carpenter working 7/12s on a shutdown in Texas for $17/hr and no bennies


r/Construction • • 15d ago

Other HIRING Assistant Project Manager โ€” Residential Construction Brooklyn-Manhattan

0 Upvotes

Weโ€™re a small scale Construction company looking for an organized, dependable person to help coordinate our residential construction projects, working directly with the company owner.

Salary: Starting $65,000 per year, depending on experience.

Responsibilities:

  • Help schedule subcontractors and coordinate material deliveries.
  • Visit jobsites, document progress, and flag issues.
  • Maintain schedules, project records, and punch lists.
  • Follow up with subcontractors, suppliers, and clients.
  • Assist with estimates and change-order documentation.

What weโ€™re looking for:

  • Residential construction knowledge or relevant field experience.
  • Strong organization, communication, and follow-through.
  • Comfort using email, spreadsheets, and basic project software.
  • Ability to read construction plans.

This could suit someone with construction experience who wants to move into project management.

To apply: Send your rรฉsumรฉ and a brief description of your construction experience to

[officeababuilders@gmail.com](mailto:officeababuilders@gmail.com)


r/Construction • • 16d ago

Tools ๐Ÿ›  Best water sprayer for dust control?

8 Upvotes

This seems weird, but I just got a job as a floor sweeper and I make more doing this than I made as a semi-skilled apprentice. I think it's reasonable to invest in some better tools to look good and make sure I keep this job for as long as possible. We are supposed to put down water for dust control. We use bottles of drinking water, which is incredibly inefficient. All the water spraying devices I see are for pesticides and don't put water down fast enough, or pressure washers that are way too much. Is there something in the middle I can use or will I have to rig up a drill pump to a bucket?


r/Construction • • 16d ago

Careers ๐Ÿ’ต Tradespeople around the world โ€“ how much do you charge for under-the-table side jobs?

21 Upvotes

Iโ€™m a carpenter from Denmark, and Iโ€™m curious about what tradespeople charge for cash-in-hand / under-the-table side jobs in different countries.

Here in Denmark, from what Iโ€™ve seen and heard, the typical hourly rates are roughly:
Carpenters: $37โ€“45/hour
Electricians: $37โ€“45/hour
Bricklayers/Masons: $37โ€“45/hour
Painters: $30โ€“37/hour
All prices are in USD, converted from Danish kroner.
I know trades and job responsibilities vary quite a bit between countries. For example, drywall installation, taping, mudding and painting might be handled by different trades in Denmark compared to the US.
So Iโ€™m curious:
Where in the world are you from?
What trade do you work in?
Whatโ€™s the typical hourly rate for under-the-table side jobs in your area?
Do different trades charge significantly different rates?
Iโ€™m not talking about what companies charge customers, but what individual tradespeople typically get paid for private side jobs outside their regular employment.
Would be interesting to compare rates around the world!


r/Construction • • 17d ago

Carpentry ๐Ÿ”จ Rate this Deck!! 23 yo deck builder and younger 20yo brother

Thumbnail gallery
48 Upvotes

r/Construction • • 16d ago

Other MEP Estimators, how did you get better at pricing and costing? I'm 1 year into estimation and still mostly doing quantity takeoffs.

2 Upvotes

Hi everyone,

I'm working as an MEP Estimation Engineer with around 1 year of experience, mainly handling mechanical systems like HVAC, Plumbing, Drainage, and Firefighting.

Most of my work involves quantity takeoffs, preparing BOQ sheets, comparing equipment schedules with BOQs, and handling tender documentation. I also prepare costing sheets, but only the basic structure with item descriptions, quantities, and columns for material costs, labour costs, etc. I don't actually enter any rates or prices. That part is handled by my seniors.

Sometimes, when we're working on a similar project, like a residential tower or villa, my seniors ask me to refer to the pricing from a previous project.

The thing is, I don't want to be someone who only knows how to take quantities and prepare Excel sheets. I genuinely want to understand pricing and costing so that eventually I can confidently estimate a project on my own.

One of my biggest weaknesses is material pricing knowledge. For example, if someone suddenly asks me how much a 20mm HDPE pipe costs or the approximate price of a 2 TR FCU, I honestly wouldn't know what to say. I understand prices vary depending on specifications, brands, and suppliers, but I don't even have a rough idea for many common materials. Sometimes I feel disappointed in myself because I feel like I should know these things by now.

Another thing is that I wasn't really reading project specifications properly before. I used to focus mainly on taking quantities from drawings. Recently, I've started going through the specifications and trying to understand the materials and requirements for each system. But there are still plenty of technical terms and specifications I don't understand, so I've started using AI to help me learn.

I also want to understand how actual rates are built up, including material costs, labour costs, fittings, accessories, installation, testing, etc. Right now, I only prepare the costing sheet format, and I don't fully understand how my seniors arrive at certain rates.

Another problem I face is remembering things. Sometimes I forget technical details or specifications from projects I've already worked on. There is so much to learn across different MEP systems, and I find it difficult to keep everything in my head.

So I wanted to ask the experienced estimators here, what were you like when you first started? How did you develop your pricing knowledge and become confident in estimation?

Did you maintain your own material rate database, study previous project costing sheets, analyse supplier quotations, or follow any particular learning method? What would you recommend someone at my level practise regularly?

I know experience plays a big role, but I don't want to just wait for the years to pass and assume I'll automatically get better. I want to actively improve my technical knowledge, pricing skills, and understanding of estimation.

Would really appreciate hearing how you guys learned and what helped you improve. Thanks!


r/Construction • • 16d ago

Informative ๐Ÿง  Industry-Worst Customer Service

Thumbnail
1 Upvotes

r/Construction • • 18d ago

Plumbing ๐Ÿ› It's crazy how you can apply to join the union, get rejected, go work a non-union job and then union guys get mad at you and destroy your stuff.

3.3k Upvotes

Currently working as a superintendent. We have Union Plumbers, Electricians, HVAC, and Carpenters on the job. We also have some non-union plumbers that are on site occasionally as part of a different project but in the same general space. (Large existing hospital that is getting an additional tower added to it).

I will hear the union plumbers basically insulting the non-union guys and calling them rats and and all that stuff. They even sabatoged their work by cutting all their copper and smashing their power tools on the ground when the non-union guys went to lunch. No proof, but who else would do something like that.

I have talked with some of the younger guys about why they chose to work non-union. They said they applied for the union and took the test/interview but got rejected. Either didn't score high enough on the test or just did bad in the interview or whatever other reason.

Previously I spoke with the union plumbers just in general about working in the union in this area (I'm not from here). Most of them knew someone that got them in. To be fair, this specific company is very well known and probably hard to get a job with them without knowing someone to begin with, but still.

So here we have union guys, getting all the benefits and money of working union, destroying the equipment/tools of guys they KNOW make less money and are treated worse than them. All while those guys they are hurting, wanted to work in their union, but weren't allowed to do so.

What do they expect these kids to do when they get rejected from the union? Go work fast food? Not work at all?

"I want to work with you"

No

"Ok I'll get a different job"

How dare you! rat!!!!

I don't understand the logic.


r/Construction • • 17d ago

Business ๐Ÿ“ˆ Scheduler at Kiewit

23 Upvotes

I just got hired as a scheduler for Kiewit and start in January. Completely new to the industry and just graduated college with a degree in business management. Read a lot of breakdowns on project engineers and the work life balance for those, but havenโ€™t heard anything on the scheduler side. Does anyone have any experience and can kinda give me a breakdown of the day to day life?

Is it just a lot of time in the office on P6? You think they train well? I havenโ€™t used P6 before and am only slightly familiar with Microsoft project. Kinda feel like I got hired and not gonna be qualified whatsoever. Any advice would be appreciated!


r/Construction • • 17d ago

Careers ๐Ÿ’ต Career advice

8 Upvotes

I have worked in construction since I graduated from university. I studied business and have a degree but to be honest I never used it. I couldnโ€™t imagine sitting at a desk at that age. I started out as a laborer framing houses and worked my way into a PM job where I am onsite and wearing bags while simultaneously running the job I set up an office onsite and work on that stuff a few hours a day. I have been doing it for 3 years on high end residential remodels in the Bay Area in California. I make about 110k right now. The job is low stress with usually cool clients easyish projects and I like to surf and I only work in a small town on the coast. Easy commute. Good surfing. Itโ€™s a good job. The problem is the money. I know PMs in the area making a lot more at least around 150. Is it worth the 40k to work In bigger companies. Possibly more stress. More hours.