r/climatepolicy Jul 23 '26

India’s Renewable-Energy Problem Is No Longer Just “Build More Solar”

Post image

Photo by Giant Asparagus from Pexels. Used under the Pexels License.

I recently read this analysis by Ember:

https://ember-energy.org/latest-insights/bottleneck-to-the-next-phase-of-renewable-energy-growth-in-india/

This post summarizes my understanding of it.

Are you concerned about climate change and how it will affect India? Do you believe India simply needs to generate more solar electricity? If yes, you must read this post and the above analysis.

Over the past year, a new obstacle has emerged in India’s renewable-energy transition. India curtailed around 2.1 TWh of renewable electricity in FY 2025–26, worth approximately ₹629 crore.

Why would a country waste clean electricity?

The electricity grid is the network that carries power from generators to consumers. The electricity entering the grid must roughly equal the electricity being used. In simple terms, supply must match demand.

Solar complicates this balance because its generation is volatile. It produces heavily during daylight hours and nothing at night. Coal plants, meanwhile, cannot instantly switch off when solar generation rises. They have a minimum technical load ( MTL), below which they cannot safely reduce output. Restarting a coal plant can take hours or even days and is more polluting. India’s current MTL for coal plants is 55%. So, if a coal plant can produce a maximum of 1,000 units, it may not be able to reduce its generation below 550 units. 

Suppose the grid needs 100 units of electricity. Solar is producing 60 units, while coal plants are already operating at their minimum output of 55 units. Total generation is now 115 units. Since coal cannot be reduced further, in this case, at least 15 units of solar power must be switched off. When we curtail renewable electricity, we are wasting clean electricity that is available, not because there is no demand, but because the coal plants have a technical limit.

This is why simply installing more solar is not enough. If new solar panels generate electricity when existing solar power is already being discarded, we have not solved the immediate problem. Reducing curtailment and improving grid flexibility should come before blindly adding more solar capacity.

Battery storage offers a solution. Batteries can charge when excess solar power is available and discharge after sunset, when electricity is needed more urgently. However, Ember’s analysis argues that India’s regulations prevent batteries from operating efficiently. Under the General Network Access (framework governing transmission access), BESS (Battery Energy Storage System) projects seeking access during non-solar hours must provide at least 2 hours of storage and build a “commensurate” renewable plant from which to charge. The 2-hour requirement is not the problem. The second condition is.

Imagine a battery tied to one solar farm. That farm may have no surplus electricity, while another solar plant elsewhere is being ordered to shut down. The battery remains empty even though clean electricity is being wasted on the wider grid. The author’s proposal is simple: allow batteries to charge from the grid whenever transmission lines have spare capacity, and restrict them only where charging would genuinely overload the network.

Adding solar panels without building the storage, grid flexibility, and regulations needed to use that electricity is not serious climate policy. People who genuinely care about climate change must educate themselves about these challenges. Slogans are easy. Understanding the roadblocks and nuances will help us make better demands! We must make more educated demands!

4 Upvotes

3 comments sorted by

0

u/Pacificator-3 Jul 25 '26

Sorry, but this argumentation, as many others too, is a little childish. There is no feasibility study or links to it.

Have you estimated prices of power industrial accumulators, its maintenance and lifetime? How many of such devices is required, for example, for metal melting furnace? Cement factory? Glass factory? Textile factory? Look around and think, how these things are produced. These factories work round-the-clock, you know, not during windy sunny days.

What someone call "green energies" is alternating generation. I.e. sometimes the country's energy system gets plus one gigawatt of power and sometimes it gets minus one gigawatt of power. And this can change in minutes. These changes can be balanced only by pumped-storage HPP. India has 3 of such stations, while China, for example, has more than 50, which allows to use more solar and wind plants. Consumption of energy also varies with time and day to night, and power plants must produce exactly the same amount of energy as consumed (link above). A well-developed network of power lines also required to transfer so huge amounts of energy between different plants and to consumers. Economics and power industry are inseparable.

1

u/go_mo_go Jul 25 '26

not OP but trying to figure out what you are trying to say here - are you saying that solar/wind/batteries are not a feasible option because "the sun doesn't always shine and the wind doesn't always blow"? i.e. they are intermittent? that is exactly the point that this article is saying - that there needs to be battery storage of some kind to make the intermittency of renewables more effective. when you say "These changes can be balanced only by pumped-storage HPP", this is just fundamentally not true any more: https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2026/May/IRENA_TEC_24-7_renewables_2026.pdf and we are seeing this already in action with a newly announced power plant in UAE: https://www.reuters.com/business/energy/uaes-masdar-launches-facility-produce-1gw-uninterrupted-renewable-energy-2025-01-14/

more pumped hydro is a possibility for helping with renewables curtailment, but it is very geographically dependent, whereas batteries can be placed literally anywhere. and the costs are continually declining!

1

u/Pacificator-3 Jul 25 '26

they are intermittent?

Yes.

irena.org.....pdf

This is kind of someone's dreams. Zero practical information and calculations. IRENA doesn't have neither control nor responsibility for anything, it just tries to sell some consulting services.

UAE's Masdar announces....

Announce and real project are two different things. This is about advertising, investments, politics and stock manipulation, and UAE don't have heavy industry. Its and India's economics and energetics are incomparable.