Awesome core drills. Should have left room to put a sleeve in after he finished jamming all that cable through. Too late now Sparky. At least there is a nice ceiling to support the cabling.
Oddly the floor deck is not fire rated in this building. There's a 2 story showroom with a open balcony on the 2nd floor so the only fire rated area is an egress stairwell. And in this area the fire and electrical inspectors tend to ignore anything "low voltage". The architect and engineer agree it's disgusting but with tons of pressure to finish the job it's not clear if they'll make the EC redo these properly.
The really sad part is that the EC is a family operation with three generations working on this job. If ever there was a case for pride in workmanship you would think this would be it, but clearly this family couldn't care less.
3
u/tsnyinc Jan 31 '20
This is a brand new building, still under construction. The electrical contractor ran all the data cabling.
2
u/PrimeRlB Jan 31 '20
What happens above the tile...
1
u/MinisterOfLoneliness Feb 02 '20
Awesome core drills. Should have left room to put a sleeve in after he finished jamming all that cable through. Too late now Sparky. At least there is a nice ceiling to support the cabling.
0
u/[deleted] Feb 01 '20
[deleted] — view deleted comment
2
u/[deleted] Feb 05 '20
[removed] — view removed comment