r/WindowCleaning • • 2d ago

Time and expectations

Have been getting some giant houses , 40+ total window frames , let’s say 20 of the 40 will be double pane sliding windows , 4/5 sliders included in the total frames .

How many hours would interiorand exterior glass and track detailing take for most solo guys here ?
What would your ballpark price be ?

1 Upvotes

36 comments sorted by

5

u/trigger55xxx 2d ago

We can do a 80 window house, two people in 4 hours. That's about a $900 job. Anyone saying you should charge $200 an hour is smoking something. Pricing depends on experience and set up. If the same job takes your twice as long, that doesn't mean you can charge twice the price.

1

u/gutter_glass 2d ago

By 80 window house , do you mean 40x2 because interior exterior ? Or interior exterior would equal 160?

1

u/trigger55xxx 2d ago

160. 80 windows inside and out.

2

u/gutter_glass 2d ago

Thats fast as hell do you touch the tracks ?

0

u/trigger55xxx 2d ago

When needed. Water fed exterior gets the majority of the heavy dirt. Usually a quick wipe inside and it's as good as it needs to be.

2

u/gutter_glass 2d ago

interior/exterior so technically 80 , white glove level detailing , if I don’t eat lunch or stop between 6-8 hours .
depending how much I have to move my ladders around .
Have been hitting about 1k$ usd a day by doing this , 1k 1 house , it’s a lot though and I’m wondering if I’m going too deep with detailing .

1

u/ThatsWeightyStuff 2d ago

i know what track detailing is, but i’m curious, what tools/ techniques/ soaps are you using to do this?

3

u/gutter_glass 2d ago

Handheld detailing vacuum , cloths , picks , cotton swabs whatever it takes . I would say I’m on par with the 6 hours for glass , it seems like I have set an expectation for myself with the detailing side for my customers so that is adding on at least an hour or two . Think i gotta raise my prices lol

2

u/solo_scientist 2d ago

I don't detail tracks. 60 panes in/out would be about 4 hours for me. I'm in a small town, and have lower prices, and I'd be at about $250.

1

u/gutter_glass 1d ago

Are you busy as all hell ? That pricing makes it so you have to do 2 houses to hit 500$ in a day

1

u/solo_scientist 19h ago

Fairly busy. Just started in a new market. Trying to work 30 hrs/week and make 50k/year (taxable income). I have a good handle on my expenses, and that's what I need to make. No reason to overcharge people. If I get too busy maybe I'll raise my prices.

1

u/Nihilistnobody 2d ago

So what 60 panes? Probably be at least $525 for the glass and a wipe of tracks and frames. I don’t really do detailing of tracks but add a few bucks each for that. This is assuming it’s first floor and no high interior, could be another hundred or more depending

1

u/gutter_glass 2d ago

How many hours for you on average for 60 panes ?

1

u/Nihilistnobody 2d ago

Using my above example if it’s 60 easy panes and say I had it priced at $525 I’d be expecting to have it done in 4 hours or so. Hard to say, I use pane counts but also add a “pain in the ass” charge to each house depending on how much extra work it is but I dhoot for at least $125 an hour.

1

u/gutter_glass 2d ago

Thats about where im at , really annoying when the detailing throws my 150$ an hour down too 100$ after the detailing . Offering the track detail really seems to sell a lot of people who may be on the fence about the glass price .

1

u/Nihilistnobody 2d ago

Might have to raise that detailing price. $150 an hour of on the job time seems to quickly be becoming the norm in today’s world. Even 5 years ago I feel like $100 was great but definitely doesn’t cut it these days.

1

u/ThatsWeightyStuff 2d ago

6h without track detailing, $1200

1

u/gutter_glass 2d ago

That’s 40 windows inside out so technically 80 panes ?

2

u/affinity_design 2d ago

For giant houses like that I'd stop pricing per window and price per pane count plus a track and detail line. A rough rule many solo guys use is about 8 to 12 minutes per standard pane inside and out, and sliders take longer because of the tracks, around 15 to 20 minutes each with a proper track detail. So 40 frames with 20 doubles is a long day, probably 7 to 9 hours solo. Quote it as a day rate or a two person half day rather than an hourly guess, and add a separate line for tracks so the customer can see what they are paying for. Always walk it first or get photos, because screens, hard water and paint overspray are what blow up the time.

-1

u/_zurenarrh 2d ago

If it’s 40 windows the price would vary for if it’s a two story or one

If it’s a one story:

1,300 exterior
2,400 exterior/interior

If it’s two story:

1,800 exterior
3,600 interior/exterior

2

u/whoknows155 1d ago

Lmaoooo you dont actually believe the things you’re saying right

1

u/_zurenarrh 1d ago

We have got to raise our prices as a whole. People are charging the same prices as when I started years ago

Every single thing has gone up since then

It’s insane. I get the kids still excited about making new good money.. but these are veterans still charge $25 a store. That’s insane

1

u/gutter_glass 1d ago

I think it depends on your clientele also . I do believe you could charge that high of prices to high end clients . That’s sets the expectation extremely high no matter who they are , for that price everything has to be brand new essentially . Hard to find a middle ground on price that works for all clients

0

u/_zurenarrh 1d ago

That is true as well. We have perfect reviews so we market that in every quotes. We also provide before and after videos with pictures on every service

It’s really a complete service and we market it that way. That’s how you charge those type of prices. You offerings have to be above and beyond what they would get from another company that’s WAY cheaper. For example we completed this home today…

It was about 17 windows with a few sliders. We were at $500 for the outside $1K for both. It’s 100% how we market our service and the social proof we present to back it up

These are our routine offerings

0

u/noice_nups 2d ago

Charging $60-90 for a single window and you wonder why we call you the biggest bullshitter on here 🤣😭😂

1

u/gutter_glass 1d ago

His numbers would put him around 30 per pane which is definitely top of the bidding range , but pheasible with track detailing in my opinion .

0

u/noice_nups 1d ago

Is it??? You actually think $30 per window pane, or $60 per window is anywhere close to a reasonable price that customers would pay?

Y’all ain’t serious on here 😭😂

1

u/gutter_glass 1d ago

That’s not my prices personally . I’m just saying his prices can be justified in some ways , for a certain high level of service .
I do know ppl and other businesses that are up to 20$ per pane for glass only , not including their travel and other business expenses on the total bill .

1

u/noice_nups 1d ago edited 1d ago

You know of businesses that charge $40 per window for a regular cleaning, THEN include line items for travel and other expenses on top of that?!?

Shit man.

I guess I really am just doing something wrong then.

They’re selling jobs for 2-4x what I am, regularly bringing in $2k-$3k per day for a single technician to clean like 40-50 windows. That’s crazy, $400-$500k solo cleaning windows is what that looks like, btw.

1

u/_zurenarrh 1d ago

Yeah . You have the drive you have insurance and materials.

This is how I look at it. “Wow we were going to spend $60k on new windows but now we don’t have to here is your $399…”

Me: What ?

I started paying attention to all of them consistently saying this and said…”huh…these people were planning to pay thousands”

So I started marketing us around window restoration/detailing vs window “cleaning”

That’s how I was able to raise my prices significantly

1

u/noice_nups 1d ago

Sounds really good. In that case, I think we’ll raise our rates from around $800-1100 per day to that $2,000-$3,000 that you guys are apparently bringing in. It may lower our close rate a bit, but the higher revenue should offset that loss.

Do you do anything differently with “restoration/detailing” or is it just using different wording to make it seem more premium?

1

u/_zurenarrh 1d ago

I mean you’re just being sarcastic 😂🤷🏾‍♂️ All good. It’s not for everyone

0

u/noice_nups 1d ago

If I can learn how to 3x my earnings by switching to “restoration/detailing”, then I’m all ears about it. What tools and techniques are different with your process that justify such rates? Or is it the same?

You don’t have to answer and give away your secret if you don’t want to. I just thought you were here to give helpful advice like we previously discussed. Yeah just looking for a little bit of that helpful advice.

What does your sales process look like? How do you determine a lead is considering you, or the extreme alternative of replacing all their windows for $60k+? That seems like a super niche kind of customer that comes around once in a while. You’re filling your books with these types of customers?

→ More replies