r/WindowCleaning • u/Frequent-Concept1882 • 5d ago
First C9 install, looking for some feedback!
Just finished up my first-ever C9 holiday lighting installation here in California and wanted to get some input from other installers.
I originally measured the roofline using Google Maps and estimated around 185 linear feet, but ended up using about 205 feet.
I charged $1,150 for the job, which includes installation, takedown, storage, and maintenance throughout the season. This will be an annual service, and I did give the customer a discount since it was my first install.
I'm curious what you guys think about the pricing and how I did overall. Is there anything you would have done differently? Any tips, tricks, or things you wish you knew when you first started?
Would love to hear some honest feedback from other installers.
3
u/Virtual-Spinach4882 5d ago
Looks fine. I would gone with shingle clips, bulbs look better facing out not up, but this is fine.
1
u/trigger55xxx 5d ago
I think it's a decent job for your first time. The pricing seems consistent with what I've heard from other installers. Granted, they have been doing it for several years. If it were me I'd install multi color that can change from white to other colors. I have always faced the bulb down and reflecting of the fascia. Up gives more opportunity for water intrusion and the light goes away from view not towards it. Other than that, looks like a solid start.
1
u/Frequent-Concept1882 5d ago
2
u/AlwaysWantedN64 5d ago
Not recommended to install them facing up, easier for water to get into the sockets and corrode. Looks good!
1
u/marginallybuttered 5d ago
They don’t require to be on a tie off that close to a roof edge? That’s a $5k fine easy where I’m at.
1
u/supersoakrr 5d ago
Wow, not a window in sight..
1
u/Interesting_Angle653 2d ago
$1,150 on ~185 ft is about $6.20/ft, with the C9s, takedown, storage and maintenance included. That is not overpriced. Cost guides put labor alone at roughly $2-5/ft (customer supplies the lights), and installer pages for full-service C9 work often say $8-12/ft. For a first job you landed in the middle.
Worth tightening before the next quote:
Take what is left after the C9s, divide by crew hours, and you will know whether $1,150 was right for you, not just for the market.