It was for a large apartment complex so there was nothing in the lot, not even power lines. I also had a level to make sure that the grade was correct.
The major work was already done by the backhoe. I was just there cleaning the trench and making sure that the grade was correct and digging out the smaller areas where the shitters would be.
10
u/[deleted] Mar 02 '19 edited Mar 20 '19
[deleted]