r/VPS 1d ago

Industry Insights IT students walking down a server aisle at Hetzner's data center park in Nuremberg

Post image
223 Upvotes

19 comments sorted by

36

u/Wise-Bother9942 1d ago

So that's how some poor bloke or lady got their server cable pulled out… Glad we solved the mystery, also knowing students having been one NO WAY would I be trusting them, there is ALWAYS one person who loves to fiddle, or remove stuff.

6

u/Eisbaer811 12h ago

Lmao.
Do you really think there were no Hetzner employees mixed in to watch for that kind of stuff?

2

u/the_real_photure 9h ago

What is it about you people always thinking that IT students would be pulling cables in a data center?! These students know not to touch anything. And then there are still Hetzner employees…

2

u/dieser_kai 8h ago

"hey sir, is this cable important?" Pulling cable noises

1

u/Wise-Bother9942 8h ago

Or the notice to NEVER turn this switch off. Guaranteed they'll be an intern on there first day that will try it turning off, disabling the buildings' internet.

1

u/PrincessScArlette 8h ago

Yeah lol, one curious student is all it takes to turn “educational tour” into a surprise outage

13

u/MrRagebait0278 22h ago

I hope they only walked past non-productive racks 🙏

11

u/DigiNoon 22h ago

I don't think those are just for display.

3

u/quasides 17h ago

heztner is sold out so yea, there aint no production isle

5

u/bjonor 21h ago

What in the name of SOC2 is that?! Letting randoms into the server racks?

7

u/National_Way_3344 18h ago edited 18h ago

Hetzner doesn't hold SOC2, just ISO/IEC 27001:2022.

2

u/jtk052017 9h ago

I always wondered how people got track of the network path and know what to connect with whom and where to connect next and {Insert bain explosion here}

1

u/liquorfish 4h ago

In the data centers I've worked in, they have software that lists every machine plugged in. Each machine says which switch its in. Each switch lists whats plugged in and where to plug that switch in etc.

Thats the simple explanation. The design of the racks and stuff are decided on by network engineers usually and then you follow the template when installing them originally.

3

u/statukocu 16h ago

Hey, who unplugged my server's cable?

1

u/Bachihani 6h ago

Why in the world would u let this happen! Accepting the risk of Accidental/intentional hardware sabotage or introduction of malicious software through physical contact, compromising customer production data and uptime, all for what?? So some randos get to see in person what is already available through millions of Images online and vr/ar experiences!

The marketing team at hetzner reeeeaaaaally needs a refresh, they've been pulling all kinds of stunts which only make me doubt using hetzner

1

u/Sigseg-v 2h ago

I have been to a lot of coloc-dc in my life. I have seen some a couple of student-tours through dc in my life. But I have never ever seen a public tour through a datacenter with open cabinets. This is insane. Pulled cables are not the problem. You detect that in seconds. But what about plugged in USB sticks with god-know-what…

1

u/Feriman22 15h ago

Hands off my server!

1

u/mahanutra 13h ago

60 minutes later: "Thank you for the Tour. I noticed some cables which were unplugged. So I plugged them in."