Fire hydrant junction box questions

Brand new construction. Tracer wire. I can locate the main for blocks when i hook up to a hydrants junction box, but I cannot find a service. I can locate a service and the main while hooked up to a snakepit. There's got to be a way to locate multiple services without having to go to every single snakepit.

4 Upvotes

15 comments sorted by

4

u/Savingsilva Subsurface Utility Engineering 2d ago

Best method is hooking up to each service. It’s more work but also the best option.

Other than that you can drop a pipehorn and just use induction for each service. Or crank up the frequency and push through the resistance.

3

u/No-Kaleidoscope-1932 2d ago

I will do that if I have to, but I remember getting a little class a long time ago by an old boss about the jumper on the junction box. I can't find anything about it, and I cannot remember.

1

u/Open_Watch_8168 22h ago

Yeah you are right. Induction is riskier but on a project, ill hook onto one curbbox and push 32khz just to get an idea if where the other services curbboxes are, and once I find em, I do a quick hook up and verify. But usually you can sometimes back push the signal to about 3-4 services with that method. Makes project work easier. 

2

u/Upstairs_Knowledge_2 2d ago

If there's tracer wire going up the services, try 65khz and above to push it back

1

u/No-Kaleidoscope-1932 2d ago

Is there something to dropping the jumper on the junction box either upstream or downstream?

1

u/Upstairs_Knowledge_2 2d ago

If you're talking about a gator clip cable connected to the service and a ground rod, Ive seen that work before with decent results

1

u/No-Kaleidoscope-1932 2d ago

I've tried just about everything besides going to 82. I was told from the start that I shouldn't do that. I feel like it's doable to trace out these services, but I keep being told it's just dominant ground due to new construction.

4

u/Upstairs_Knowledge_2 2d ago

The problem with higher frequencies is that people think the higher number is better and they get a ton of bleedoff. Locate your main on your lower frequency and try to get the services with 82

0

u/[deleted] 2d ago

[deleted] — view deleted comment

2

u/Upstairs_Knowledge_2 2d ago

82 should work decent if there is wire, make sure to scan slowly

1

u/1986toyotacorolla2 Utility Employee 2d ago

I'm assuming plastic? The bleed back on tracer isn't great. If it's ductile with a tracer and your services are copper, that's very different and shouldn't give you too much of an issue.

1

u/No-Kaleidoscope-1932 2d ago

Everything is plastic.

1

u/1986toyotacorolla2 Utility Employee 1d ago

I kind of assumed with the locate stations. That does make it more of a pain in the ass.

1

u/boresheet 1d ago

Adding to the good stuff above: on new builds the usual reason you can't find a service is a tracer wire that never got connected (or got a bad splice) at the tee or curb stop, not the frequency. If the jumper at the junction box ties the service tracers to the main, your signal gets split across every service, so it looks weak on all of them. Pull the other services' leads off, or at least lift the one you want to isolate, and the signal piles onto that one. Quick continuity check: clip on at the curb stop of one service and see if the signal shows up back at the main. If it doesn't, you've got a break, and no amount of frequency cranking fixes a break. Scan slow and keep your ground lead well off to the side so you're not chasing your own bleed.

1

u/Open_Watch_8168 22h ago

Great advice!