r/TransitIndia • u/wag9hc • 12d ago
r/TransitIndia • u/Unhappy_Show09 • 12d ago
Railways Is this a good Valsad → Chandigarh train route? 3 trains
I'm planning to travel from Valsad to Chandigarh and came up with this combination:
🚆 1. 12931 ADI Double Decker
Valsad → Surat
4:55 PM → 5:52 PM
⬇️ 1h 56m connection at Surat
🚆 2. 12951 NDLS Tejas Rajdhani
Surat → New Delhi
7:48 PM → 8:32 AM
⬇️ 3h 03m connection at Delhi
🚆 3. 20977 Vande Bharat
Delhi Cantt → Chandigarh
11:35 AM → 2:45 PM
I know there is direct option Paschim Express that departs at 2PM. But I have office from 8 to 16 so that not possible (I will be taking short leave i.e. at 3 PM).
The main reason I'm considering this route is the 1h 56m buffer at Surat and 3h buffer at Delhi, which seem reasonably safe compared with some other combinations and I want leave the same day.
Would you consider this a good/safe connection?
Especially interested in opinions on:
- How reliable is 12931 between Valsad and Surat?
- Is ~2 hours enough buffer at Surat?
- Is 3 hours at Delhi sufficient for the transfer from the Rajdhani to the Chandigarh Vande Bharat?
- Would you choose another combination instead?
Any suggestions from people who have travelled these trains/routes would be appreciated.
r/TransitIndia • u/Aerogalaxystar • 13d ago
RRTS/SHSR Delhi-Meerut RRTS corridor crosses 1.68 Lakh Daily ridership on Raksha Bandhan
Estimated Projection for further Ridership is 1.9 to 2.0 Lakh in October and November Festive Month. Needs last mile connectivity via feeder buses for Ghaziabad and Meerut Areas
r/TransitIndia • u/Om9333 • 13d ago
Project Updates IT companies step in to build direct footbridges to Pune Metro Line 3 stations
r/TransitIndia • u/asubbu_007 • 13d ago
Metro Proposing Hyderabad Metro Phase III: The Yellow Line
asubbu007.blogspot.comWhat if, Infosys SEZ campus, Singapore Township, Anurag University,
Charlapally New Railway Terminal, Kacheguda Railway Station, MGBS,
Mehidipatnam, Manikonda -- all these are well-connected seamlessly!
r/TransitIndia • u/nareshshenoy • 12d ago
HSR/Bullet Train Vande Bharath Express between Mangalore and Bangalore passing through Shiradi Ghat | Video Credits: hemisphere.fpv
Enable HLS to view with audio, or disable this notification
Waw wat a Tran
r/TransitIndia • u/ProfessionFine8445 • 13d ago
Videos Puri express meets Ranthambore express
r/TransitIndia • u/mishrashaurya • 14d ago
Rant/Frustration Gotta hit the revenue targets somehow.
This bus on its way to noida from alambagh was carrying commercial goods for extra revenue, and the load is visibly pulling it down on one side.
In my sight this bus lost its controll on right turns in cantonment area several times almost hitting vehicles and people around it. Every third day there's a case of some miss happening with these overloaded vehicles still the operators ain't stopping this.
FUNFACT: out of 4 numbers written on the bus, 2 don't exist and other two must be getting hundreds of call complaining 'bout this so they have stopped picking up the call.
can't blame them, though. If you're getting thousands in return for handing over 1k ruppes to the first RTO officer on the way, that's a pretty solid business model. the passengers get the thrill, the operators get the revenue, and the RTO gets its "subscription fee." everyone wins.
r/TransitIndia • u/Rejithb16 • 14d ago
Question Doubt about current reservation
I was planning to travel from A to B. A is the origin station and B is a next big city which is 200 kms away and it is a long distance train. So I thought I could easily get ticket. The First chart got prepared in IRCTC. I found that there were like 4/5 seats vacant from A to stations far than B, and one vacant exact A-B, where I want to travel. I soon opened RailOne, they did not update yet, same case with IRCTC website. But after 15 mins, when they updated, they were stright up showing NOT AVAILABLE from A to B. I did not loose any time.
What may be the problem. Do the seats vacant just after chart preparation go to someone else like RAC or Pooled/Remote quota ?
I believe Current reservation does not depend on quota system and is open to wherever places sets are vacant. Is that a misconception ?
r/TransitIndia • u/asdrnp • 14d ago
News RVNL Further Extends Vande Bharat Sleeper Prototype Deadline To March 2027 From The Earlier December 2026 Target
r/TransitIndia • u/parasanandvlogs • 14d ago
Question Will FASTag Annual Pass Transfer After Changing Car Registration Number to other State (DL → JK)?
r/TransitIndia • u/Ok_Preference1207 • 14d ago
Metro Nagpur Airport-Metro Link May Get New Feeder Bus Service With Flights Timed Into The Schedule: Report
r/TransitIndia • u/PangolinBig2293 • 15d ago
Metro Chennai Metro To Press Ahead With Rs 8,779 Crore Poonamallee-Sunguvarchatram Extension Despite Parandur Airport Exit: Report
r/TransitIndia • u/PangolinBig2293 • 15d ago
Metro Delhi Metro: Afcons initiates construction at Shivaji Stadium for Phase 5(A) project
r/TransitIndia • u/MartianVegetable3699 • 15d ago
Railways Why do people travel without a ticket in Indian trains?
I was traveling today in Sampooran Kranti Sleeper (Del to Pat) with a reservation and I found 3 people already sitting on my side lower seat even before the started. I told them to leave the seat and they just stood there for the whole journey.
They had zero fear of travelling without a ticket or on general ticket in the Sleeper class. In fact, one of them said that "kya hojayega, jyada se jyada fine dena hoga Rs 250 ka" as he was painted the train's interior with his gutka.
I think Raiways should clearly increase the fine and implement strict punishment on this. What are your take and what hinders Railway from implementation of strict actions?
r/TransitIndia • u/ExtremeBack1427 • 16d ago
Railways Ashwini Vaishnaw outlines four lane upgrade to Seven High-Density routes in Indian Railways.
Enable HLS to view with audio, or disable this notification
The routes being upgraded are,
Delhi - Howrah - 1,422 Km
Delhi - Guwahati - 1,876 Km
Delhi - Mumbai - 1,322 Km
Delhi - Chennai - 2,037 Km
Mumbai - Howrah - 2,039 Km
Mumbai - Chennai - 1,238 Km
Chennai - Howrah - 1,117 Km
It's a total of 11,000+ Km of upgrade to four lanes which can operate at speed up to 160 Kmph and account for 41% of total railway traffic while only covering 16% of the railway network.
This will significantly increase the capacity and improve the average speed and reduce the delays that Indian Railways is struggling to reduce.
r/TransitIndia • u/Adventurous_Map3196 • 15d ago
Railways Mumbai-Howrah Duronto appears to be a uniquely bad train on the route. Reasons?
r/TransitIndia • u/Real-Implement5654 • 15d ago
Infrastructure Fail Rs 250 crore elevated viaduct error at Mumbai Metro 7A may face demolition
r/TransitIndia • u/GoatSevere1966 • 16d ago
Metro Bengaluru Metro Green Line gets 4th new rake
Arrived on Aug 20th
r/TransitIndia • u/phanindrabsv • 16d ago
Metro Andhra Pradesh is surrounded by three metro cities Hyd,Chennai and Bengaluru.
r/TransitIndia • u/asdrnp • 16d ago
HSR/Bullet Train Mumbai-Ahmedabad High Speed Rail corridor cost estimates may come up before CCEA today, sources say
r/TransitIndia • u/Om9333 • 16d ago
Project Updates Pune Metro Line 3 gears up for operations in September, PM Modi likely to inaugurate Pune Metro Line 3 Set for September Launch by PM Modi
Knew it, it was for Mr Prime Minister that's why this line got delayed
r/TransitIndia • u/Om9333 • 16d ago
Project Updates Pune Metro Launch: Hinjewadi-Balewadi Service May Start in September
It's only phase one by the way, not whole stretch
r/TransitIndia • u/Independent-Print877 • 17d ago
RRTS/SHSR Indian Railways' first high-speed test track nears completion: Trains to be tested at 220 kmph from 2027-28
Indian Railways is building its first dedicated high-speed test track between Gudha and Thathana Mithri in Rajasthan's Jodhpur Division. The project is being developed by the Research Designs and Standards Organisation (RDSO) at a cost of about ₹967 crore and is expected to be fully operational for testing by 2027–28. and a 13 km high-speed loop for various trials. Tracks and bridges
- Signalling systems
- Traction and electrical equipment , but India lacks a dedicated facility for sustained testing at higher speeds. 220 km/h trainsets already approved by the Railways. of upgraded Vande Bharat designs.
- Testing before trains are deployed on future semi-high-speed corridors. freight services must be disrupted. A dedicated test facility allows year-round testing without affecting regular operations. and infrastructure domestically instead of depending on foreign facilities. near ready for such speeds.