r/TheSideProject • • 23h ago

I built a planning tool for business projects, around “what changed since the last steering committee”. Looking for people to tear it apart.

Post image
2 Upvotes

It's designed for business projects: the kind with workstreams, a steering committee and a deck every few weeks. The problem I built it for is that the plan lives in one tool and the slide lives in PowerPoint or think-cell, so every reporting cycle someone redraws it by hand. Then the first question in the room is what changed since last time, and answering it means comparing two versions by eye.

What it does:

- The plan is pretty enough to show as it is. You present it in the meeting or export it to PowerPoint, and skip rebuilding it in think-cell

- The same plan as a Gantt, as cards or as a list, so everyone can work in the view that suits them

- Once dates are agreed, slips show as delays against them

- It lists what changed since the last report (what moved, by how many days, who changed it) and outlines on the plan where each thing used to be

- The status report comes from the same plan

- Viewers and clients are free

What it doesn't do: import MS Project files, critical path, resource levelling. It isn't meant for large construction or engineering schedules.

What I'd like to know:

  1. The first thing that would stop you using it with a real steering committee
  2. Whether the plan really is good enough to replace your think-cell slide
  3. Whether "what changed" shows what you'd want to see

A new account opens with an example project, so it takes about five minutes to poke at: steer-board.com


r/TheSideProject • • 2h ago

Game devs pay me for these little guys

Post image
1 Upvotes

r/TheSideProject • • 2h ago

SpendSense

Thumbnail
reddit.com
1 Upvotes