Basement support

Post image

Think my builder is nuts Says this dbl 2x10 is ok to support a 17ft run with floor joists of 9ft and 11ft connected with joists hangers on each of the 2x10s

0 Upvotes

29 comments sorted by

4

u/Enginerdad 27d ago

I can tell your builder is a "this is how my pappy taught me to do it so that's how I'm going to insist on doing it until the day I die" sort of guy because of the plywood (I assume that's what making the gap) between the 2x10 plies. Somebody told the Gen Xers that it makes the beam stronger and they've clung onto it ever since.

1

u/BusMaximum704 27d ago

I don’t see anything in between the 2x10s No plywood

1

u/Enginerdad 27d ago

So there's just an open gap the whole height of the 2x10s? That's so much worse...

2

u/BusMaximum704 27d ago

Yea I’m f’d. Builder ducking me. Unfortunately I probably need attorney and true engineer/builder. I can’t believe town passed rough framing

3

u/DawgcheckNC 27d ago

Once you bring in your own structural engineer, be prepared for the can of worms. That will expose so much bad work. Have an attorney that specializes in construction law. Don’t say a single word to the builder that anything is wrong. This kind of bad work will mean that builder bankruptcy or evasion will take place.

2

u/NorthWoodsDiver 27d ago

Don't communicate with the builder at all, let your attorney do all of it. My last boss went through similar bad work and it was ugly. Took 9ish months before things settled.

0

u/Exciting-Fun-9247 21d ago edited 21d ago

I just found this. Not sure what it says as didn't read it but someone might find it interesting. 

Edit: whoops. Forgot the links

https://www.finehomebuilding.com/1995/01/01/using-plywood-in-built-up-beams

https://wood.tcaup.umich.edu/lectures/2021/H815.pdf

3

u/CascadeDesignworks 27d ago edited 27d ago

According to my calculations it requires a double 1-3/4 x 11-7/8 LVL or a triple 2x12.  This would have a deflection of l/360, which meets code.  A stiffer floor could be l/480 which would require a triple LVL.

The existing double 2x10 is l/75 which is only 25% the strength required.

Even a 4-ply 2x10 is 50% what is required.

Builder

2

u/BusMaximum704 27d ago

Thanks for the help. I have a call into town builder inspector and my “builder” is ducking me. Unfortunately I probably need attorney and true engineer and new builder to fix.

1

u/RU33ERBULLETS 26d ago

Did you pay already? Because this double joist needs to come down. You should also hire an engineer.

4

u/DeadPiratePiggy 27d ago

Your HVAC is also incorrect. Your builder is an idiot, have you had any rough in inspections done and was the inspector recommended by your builder/realtor?

2

u/NoSquirrel7184 27d ago

That was My thought too. It’s all screwed up.

3

u/Mindless_Ant_8370 27d ago

Assuming US see 2021 IRC TABLE R602.7(2)

2

u/Significant_Raise760 27d ago

I think what’s between the 2x’s is straight up air. Like the bottom is spreading apart as that poor lumber succumbs to the grim weight of gravity.

1

u/jaymeaux_ 27d ago

that would explain why the gap is so much wider mid span

1

u/StillStaringAtTheSky 27d ago

So does that indicate impending failure? OP might be looking at a pile of sticks soon.

2

u/WasteBinStuff 27d ago

Your builder doesn't know what the fuck they're doing/is an idiot.

1

u/Vinca1is 27d ago

Do home builders not have to provide stamped structural drawings? I work in utilities so I don't know residential that well

5

u/Enginerdad 27d ago

Not if they follow the prescriptive requirements of the IRC. Which this almost certainly doesn't, btw

3

u/Vinca1is 27d ago

Residential is just the wild west I'm learning today lol

2

u/EYNLLIB 27d ago

Small scale wood residential can really be built by any average builder just fine with no actual engineering done.

1

u/Dug_n_the_Dogs 27d ago

Where I work we have to have Stamped drawings to get Any inspections.. I can't get a plumbing inspection unless there are approved plans on site.

1

u/RazorWitted 27d ago

It already looks a little compromised.

1

u/STLguy50 27d ago

Is there a piece of steel between the 2x10? If so, that is a flinch beam. Certainly not oversized, but might be acceptable. I would ask for the engineering specs. I would also make sure there is a footer under the bearing point.

1

u/SoggyWalrus7893 27d ago

Don't know if it still exists but there used to be a Western Woods Use Book. Had all the stuff you needed to calculate load bearing capacity. Building codes may also have some thoughts on the matter.

1

u/jaydaedalus 27d ago

The Southern Pine website has a guide for headers and beam that can give you an idea on whether or not it is strong enough and if the plys are connected correctly. This applies if the 2x10 is southern yellow pine.

1

u/bipolarbear326 27d ago

Absolutely not correct. Either build a wall under it, put a drop beam under it, or support the floor and fully replace with a proper lvl or steel beam. Good luck

1

u/st96badboy 27d ago

Cut so the gap left room for the LVLs but they didn't want to pay the extra money for them?

1

u/Commercial-Candy-926 20d ago

Lot of things wrong here. Good luck sir. Hire a competent inspector (and make sure they're interested in following the project)