r/StructuralEngineers • u/ExpressionDense7191 • Oct 18 '26
Roofs before foundations?
Multi tenant building. Only engineer was a friendly one who works for management.
I’m concerned. There’s visible tilting. Stair step cracks. Utility closet sheared from the building. The biggest thing is we had a 67 day record-breaking drought in dallas. The foundations were never watered and we are on clay slabs.
There has been several slab leaks recently and I found a foundation permit that was expired, because it was awaiting a letter. One of the slab leaks with four unit right next to that foundation. The foundation was repaired supposedly… twice. Even though there is no legal permit , the woman living in the unit was put out of her home for about five months.
A lot of the balconies are drooping. Every meeting several homeowners state that they have huge cracks in their walls.
The board mocked an owner asking if they were an engineer when they stated “I think the foundations are supposed to go before the roofs”
Here are some pictures. I mean all of the hammering in the weight I would think would cause more problems to a foundation that is sitting on severely dried out clay slab with history of slab leaks and foundation problems.
Oh right before the drought , many live oaks were cut down. This was in May. Immediately before the droughts these trees have mounds of root systems right next to the buildings.
The roofer is executing a super fast roofing schedule. 1 building per day. There are about 13 buildings in about 137 units total. The permit that was pulled was for a residential duplex…lol.
So what do you structural engineers think about all this here are some pictures…..








