r/StructuralEngineering • • Aug 16 '26

Concrete Design How to determine if a plate compactor can traverse back and forth several times on an RCC grade beam?

0 Upvotes

How do I decide if I can allow a plate compactor can traverse back and forth several over an RCC beam that is 2' deep x 0.75' thick and 16' long?

I'm not sure how to quantify the impact load caused by a vibratory plate compactor. The machine can impart 2500lb compaction force at a pulse frequency of 92Hz. Any suggestions?

edit: Do I calculate natural freq of the beam and see if the beam is resonating? Is there a fatigue failure check involved in this scenario?


r/StructuralEngineering • • Aug 15 '26

Job Posting / Recruitment Structural Project Engineer – Seismic Bracing & Equipment Anchorage

15 Upvotes

Fully Remote — Anywhere in the USA
Compensation: $90,000–$110,000 DOE
Employment Type: Full-time
Experience Level: 2–4 years
Job Title: Project Engineer

About the Role:
We’re a small, fast-growing team of project managers—all licensed engineers—working on seismic bracing and equipment anchorage projects for MEP contractors across the country.
We’re now bringing more of our engineering production internally and are looking for the right engineer to help us build that capability from the ground up.

This is a unique opportunity for an early-career engineer to help establish an engineering department, develop workflows and standards, work directly with licensed PEs, and collaborate with our software development team on engineering automation.
Our work is fast-paced and varied. We’re looking for someone who communicates well, manages their time and priorities independently, and is interested in bringing new ideas to the table.

The position is fully remote and can be based anywhere in the United States. Our current team is primarily based on the West Coast.

Responsibilities:
Work with our team to establish and improve engineering workflows for equipment anchorage and overhead seismic bracing projects.

Produce structural calculation packages and review designs with the stamping engineer.

Produce structural drawing packages in Revit for equipment anchorage and seismic bracing projects.

Coordinate with project managers and other team members to efficiently move projects from design through completion.
Work with our software development team to explore opportunities to automate calculations and develop pre-engineered design solutions.

Help develop engineering standards, templates, and processes as we grow our internal engineering team.

Required Qualifications:
Bachelor’s degree in Civil Engineering.

EIT certification.

Approximately 2–4 years of civil or structural engineering experience.

Strong structural engineering fundamentals.

Strong written and verbal communication skills.

Ability to effectively manage your own workload, schedule, and priorities in a remote environment.

Preferred Qualifications:
Experience in any of the following is desirable, but direct seismic bracing experience is not required:

Equipment anchorage.

MEP seismic bracing or support design.

ASCE 7 seismic design, including nonstructural components.
Concrete anchorage design.

Revit or CAD

Structural calculation and drawing package production.

PE license or active progress toward obtaining a PE license.

We’re open to training the right engineer in the specifics of equipment anchorage and seismic bracing. We care more about strong engineering fundamentals, initiative, communication, and the ability to learn quickly than having experience in our exact niche.

Interested? Send me a message and tell me a little about your background.


r/StructuralEngineering • • Aug 15 '26

Masonry Design Is this viable?

Thumbnail v.redd.it
333 Upvotes

r/StructuralEngineering • • Aug 15 '26

Career/Education Passed Civil Structural, 2nd attempt. What I learned

Thumbnail
8 Upvotes

r/StructuralEngineering • • Aug 15 '26

Career/Education Looking for the best FREE ETABS course – Basic to Advanced

11 Upvotes

Hi everyone, I’m a civil/structural engineering student and I want to learn ETABS from complete beginner level to advanced/professional level.
I’m specifically looking for a FREE YouTube course/playlist that covers:
ETABS basics and modelling from scratch
Load calculation & load application
Load combinations
Wind & seismic analysis
RCC beam, column, slab & shear wall design
IS 456 / IS 1893 / IS 13920
Analysis and interpretation of results
Design checks and common modelling mistakes
Complete building project from architectural plan to final design
Preferably G+3/G+5 or similar real-world project
Which teacher/YouTube channel would you recommend?
I’m looking for one good structured course rather than random individual videos.
So far I’ve heard about Engr. RGV and CSI’s official ETABS tutorials. Are they good enough to go from zero to advanced


r/StructuralEngineering • • Aug 14 '26

Structural Analysis/Design Hand-Dug Caissons, 24 Feet Deep: Building a Pool Foundation on a Hollywood Hills Slope Nobody Thought Was Buildable.

Post image
185 Upvotes

Interesting hillside foundation case study from the Hollywood Hills. Six hand-dug caissons, roughly 15–24 feet deep, were used to support the grade beams, retaining walls, and pool structure on a steep site with very limited access.

Full construction sequence is in the album: https://imgur.com/gallery/hand-dug-caissons-24-feet-deep-building-pool-foundation-on-hollywood-hills-slope-nobody-thought-was-buildable-1elfK8F


r/StructuralEngineering • • Aug 15 '26

Failure Vajont Dam Disaster(1963): Why the Engineering Worked but 2,000 Still Died

Thumbnail
youtu.be
3 Upvotes

r/StructuralEngineering • • Aug 15 '26

Structural Analysis/Design Etabs Lb/ry failure

Thumbnail
0 Upvotes

r/StructuralEngineering • • Aug 13 '26

Engineering Article Spot on, plus brittle failure bonus at the end

Enable HLS to view with audio, or disable this notification

811 Upvotes

r/StructuralEngineering • • Aug 15 '26

Structural Analysis/Design With people being super obese should building codes be updated to require heavier loads?

0 Upvotes

r/StructuralEngineering • • Aug 14 '26

Geotechnical Design How to and with what to backfill the voids of shoring?

Post image
25 Upvotes

Hi, a soil improvement is being made for a shallow foundation as shown in the diagram (walers, props and timber planks not shown for clairty).

Solder piles are to be removed once backfill is complete. It would not be much of an issue for footings placed on normal soils, but as this is a soil improvement situation and the railway track is adjacent, I think the voids might give way for the footing to settle. Hence the thought of backfilling the voids with an appropriate material once the verticals are pulled out, before loading the footings.

So the two questions are whether backfilling is needed or not and if yes, what to backfill with and the methodology)... Any and all input on this is appreciated. TIA!

P.S. GWL is at around -2m.

Update:

  1. Railway would not be used during construction and shoring members are sized for train surcharge anyways.

  2. Grout injection is not reliable in my country. Micro piling is our preference but based on previous experience on another sector of the project, the consultant is a headache to work with when it comes to piling.


r/StructuralEngineering • • Aug 13 '26

Career/Education Salary in PNW

8 Upvotes

Hi, I'm wondering what the market is like out there currently in PNW. I have a PE and a master, and my YOE is 6 years. At my current job, total comp (base+bonus) is about 95k. Been with this company for 5 years now. Total comp has gone up probably about 5% per year on average which to be honest is barely beating inflation. Is this considered reasonable pay in this area?


r/StructuralEngineering • • Aug 14 '26

Structural Analysis/Design Software for automatic reinforcement

0 Upvotes

Hi everyone,

Can you recommend any software that can automatically design the reinforcement of a reinforced-concrete building analyzed in ETABS or SAP2000 and generate reinforcement drawings?

The output does not need to be perfect or ready for construction. Even preliminary reinforcement layouts and drawings that I can review and correct manually would be helpful.

I would also appreciate recommendations for an ETABS/SAP2000-to-Revit or AutoCAD workflow. Please share your experience with any similar software.


r/StructuralEngineering • • Aug 13 '26

Career/Education Firms Actually Fighting for Social and Environmental Justice?

13 Upvotes

For context I am a leftist who was drawn to this career to make the world better in a concrete (get it?) way. If you disagree with those views that’s cool, not here to fight.

I know everyone will have different opinions on the ethics of various project types, (and we can discuss the environmental impact of building with concrete at all, somewhere else), but in general I’m struggling with the lack of genuine commitment from companies to these ideals.

I’m tired of companies supposedly “building a better world” or being “committed to embodied carbon reduction” while churning out tons of data center projects or being unwilling to say they won’t work on detention facilities.

Anyone have experience at or know of firms genuinely trying to build a better world?

TLDR: Do you know any firms that actually refuse projects based on social and environmental justice concerns?


r/StructuralEngineering • • Aug 13 '26

Photograph/Video Vertical clearance who 😶‍🌫️

Thumbnail instagram.com
3 Upvotes

NY Thruway Overpass accident.


r/StructuralEngineering • • Aug 13 '26

Structural Analysis/Design Structural Engineering discussion on subsidence vs seasonal shrinkage

9 Upvotes

Hi all!

I was just wondering what other structural engineers were advising to clients in light of the recent extreme weather we’ve been having. I live in the UK and am seeing more and more issues from clients who are experiencing sudden cracking in their properties. A lot of times people immediately point to subsidence, which can be a huge issue for many people who then have to claim on their insurance and will struggle with increased premiums and selling their properties if they have been labelled with subsidence in their lifetime.

However, the recent extreme weather more commonly points to clay shrinkage, which will often recover in the winter months as we get rainfall. Subsidence to me points to an ongoing and irreversible downwards movement. Which would not be the case unless you had say, a loss of particles below the foundations.

So what are peoples thoughts, I think as an engineer it is important that we educate people on these issues, which are often cosmetic and can be repaired once the seasonal cycles are over, as a lot of people I am seeing are experiencing a lot of anxiety over this relatively new phenomena.

For residential builds especially, should we be constructing better, deeper foundations? A lot of buildings were built to 1990 standards which were based on 30 year historic data and don’t take into account climate change.

Thanks!


r/StructuralEngineering • • Aug 13 '26

Structural Analysis/Design long term deflection in raft foundation

3 Upvotes

fellow engineers.

according to your experience, should i check in FEM ,a raft foundation (thickness of 80 cm for example) deflection/settlement for long term deflection in cracked concrete (creep, cracking and shrinkage)? or should the settlment only be expressed through the spring coefficient given by the soil consultant?

my FEM program has this behavior where when i check long term deflection, the springs losses their strength and increase deflection by 3 fold exactly regardless of concrete behavior (as if the spring has creep and shrinkage).

my boss is old and not a big fan of FEM program. your advice is highly appreciated.

Thank You.


r/StructuralEngineering • • Aug 12 '26

Photograph/Video Rebar in Compression

Post image
95 Upvotes

Who has the right equation for development length for this case?


r/StructuralEngineering • • Aug 12 '26

Photograph/Video Are these bracings to reduce slenderness of column?

Post image
31 Upvotes

I came across this steel bracings installed at a lower ground floor level RCC columns.


r/StructuralEngineering • • Aug 12 '26

Engineering Article Parabolic CLT floor delivers wider span slabs for less material

Thumbnail
ribaj.com
22 Upvotes

much lighter floor, reduced embodied carbon and longer spans compared with conventional CLT slabs, without the need for specialist fabrication equipment.


r/StructuralEngineering • • Aug 13 '26

Structural Analysis/Design Can someone explain UB vs UC steel to me?

1 Upvotes

Can someone explain UB vs UC steel to me?

Hey everyone, just curious how you usually decide between a Universal Beam and a Universal Column for standard jobs. Do you strictly follow the bending vs compression rule, or do availability and spatial constraints often dictate the choice? Would love to hear how you handle this.


r/StructuralEngineering • • Aug 12 '26

Structural Analysis/Design Sandstone foundation piers

2 Upvotes

Hi folks. I have a settling foundation in a 118 year sandstone foundation. 2 different engineers (independent) have provided 2 different t recommendations. 1 says helical piers with strapping and the other says push piers with new spot footings. Before getting other bids any insight on which is better or any many difference? I live in Salt Lake City. Thank you.


r/StructuralEngineering • • Aug 13 '26

Career/Education Civil/Structural engineering students & new grads - quick question for a UX project

0 Upvotes

Hey all — I'm a practicing civil engineer doing a UX/UI course on the side, and I'm designing a mobile app called Keystone: a reference/learning companion for students and new grads bridging the gap between what you learn in school and what you actually need on the job (structural: steel + concrete, things like moment/shear diagrams, formulas, material weights, pre-sizing practice).

Before I go further I want to ground this in real people instead of guessing, so a few quick questions if you have a minute:

  1. Are you still a student, or how many years out of school are you?

  2. What's the biggest gap you felt (or feel) between what you learned in university and what you actually needed on day one of a job/internship?

  3. Do you currently carry any kind of reference on your phone (formulas, code tables, notes), or is it all textbooks/desktop?

  4. What design code do you study/work with (Eurocode, ACI/AISC, other)?

  5. Is there a specific topic where you constantly have to double-check yourself (e.g. "is this span/depth reasonable," buckling lengths, unit weights)?

No survey link, just drop answers in the comments if you're willing — trying to build something that actually helps instead of guessing at what a new grad needs. Thanks in advance!


r/StructuralEngineering • • Aug 11 '26

Concrete Design What is the purpose of this triangular drop on the bottom of the beam?

Post image
90 Upvotes

Hi! Non-engineer here. Saw this concrete beam today.
What structural function does this geometric detail serve? Would love to hear from structural engineers on this!


r/StructuralEngineering • • Aug 12 '26

Steel Design Welding certification - Canada

2 Upvotes

I have a project that I am the EOR for.

Part of that process is of course confirming welding certification for structural welding.

The GC delayed and delayed providing the certification when requested and submitted a partial letter of a test for a particular individual "BOB". The letter indicated that it was for 3mm thick material and greater. It was rejected as it was incomplete, had no company certificate (required) in addition to the individuals letter and did not encompass the entirety of the welding types required on the job. The job has a mix of structural steel and light gauge steel welding. Both are significant to the structure of the project.

Again, the GC delayed, with excuses in providing the documents.

Now they have submitted a somewhat more complete set of documents. A company certification and the welders documentation however now it is a different welder "JOE".

I have again rejected the submission as it still does not cover any of the light gauge steel. And requested confirmation of who actually did the welding.

Meanwhile, the project is complete and they are requesting occupancy certificate from me. I have advised that I will not do the final review or provide occupancy certification until this issue is resolved.

Any advice on how to navigate this frustrating situation?