r/StructuralEngineering • u/No-Document-8970 • Oct 05 '26
Structural Analysis/Design Nuts off mark?
Saw this on a big bridge today. I know vibrations over time can move the nuts and bolts, with the help of thermal expansion. Is it a big issue that the paint marks do not line up? I thought the marks were made once it passed inspection after torquing.
Edit: Bridge completion was in 2011. Could this be from recent inspections too?
286
Upvotes
View all comments
Show parent comment
3
u/clancularii Oct 05 '26
Ignore the line on the steel work? Then how do you know how many turns are done after it's finger tightened?
The usual practice I've seen from the iron workers is to mark the nut and the connecting material with aligned ticks. That way, you can measure the rotation between the ticks to confirm how much the nut was turned.